Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter Find us on Youtube View Content in Hindi
National Emblem of India

About Us

NR H.Q.

Divisions

Passenger & Freight services

News & Recruitment Info

Tenders

Contact Us



 
Bookmark Mail this page Print this page
QUICK LINKS
Engineering

                                                                                           ENGINEERING
 
  STAFF POSITION

Sr.no.

GROUP-C

GROUP-D

TOTAL

Sanctioned strength

On roll

Vacancy

Sanctioned strength

On roll

Vacancy

Sanctioned strength

On roll

Vacancy

1

766

560

206

3911

3161

750

4677

3721

956








1.GENERAL

1.1 Ambala is the youngest division of Northern Railway. It was carved out of Delhi division on 01.07.1987.Later on, part of Firozepur division was transferred to it and full-fledged division started functioning from 15th August 1988, comprising of 971 route kms. Subsequently, on opening of Nangal Dam –Una Himachal line in Jan.’1991, Bathinda bye-pass in April, 1990, Una Himachal – Churaru Takrala in Oct.’ 2004 and Chandigarh – New Morinda in 2006 and Churaru Takrala - Ambandaura in 2011 & New Morinda- Sanehwal in April 2013 and UMB-DHPR Doubling in Dec, 2015, DHPR-CDG doubling in march 2018, Amb Andhura - Daulatpur chowk new line in April-2018 the route Kms have become 1138.59.

1.2 The breakup of 1138.59 route kms. of the divisions as under :-

Route

Section

Route Length

Total Length of M/L

Track

Kilometer

ETKM

Single

Line

Double

Line

  B

SRE-UMB-LDH

-

178.21

356.42

13.64

16.04

114.82

8.98

935.54

1208.71

MB-SRE

-

6.82

DLI-UMB

-

8.02

UMB-KLK

24.76

45.03

TPZ-SRE

-

4.49

Total è

24.76

242.57

509.90

D

DLI-BTI-FZR

2.70

-

2.70

1054.93

1153.457

E

HNC-KJGY

TPZ-KJGY-BYE PASS

SIR-NLDM-UHL- AADR-

DAULATPUR CHOWK

RPJ-BTI

LDH-JHL

JHL-HSR

BTI-SGNR

RPHR-STD

BTI-Bye pass

CDG-Jn Cab.-MRND

Jn. Cab.-NMDA-SNL

0.31

1.51

164.14

173.38

123.12

78.32

125

0.99

5.60

44.36

52.97

1.89

-

-

-

-

-

-

-

-

-

-

-

-

4.09

1.51

164.14

173.38

123.12

78.32

125

0.99

5.60

44.36

52.97

Total è

769.70

1.89

773.48

JUDW

0

0

0

74.70

46.64

N.G.

KLK-SML

96.97

-

96.97

136.32

152.623

TotalèB+D+E+NG +JUDW

894.13

244.46

1383.05

2201.49

2561.43

Grand Total

1138.59

1383.05

2201.49

2561.43


1.3 Mainly, the terrain in the division is plain except in certain areas where gradients are steep viz. - 1 in 200 on Ropar-Nangal Dam, 1 in 100 on Nangal Dam-Una Himachal section & ruling gradient of 1 in 40on Chandigarh – Kalka section, which has been declared as Ghat section.

1.4 Kalka-Shimla section has got Narrow Gauge of 2’-6” with ruling gradient 1 in 33 and curves up to 48 degree.

2. GAZETTED ORGANISATIONSET UP

Gazetted Organization of Engineering comprises of Sr.DEN/C, four sectional Sr.DENs/DEN , one DEN/Spl , one DEN/Track, one ADEN/Land and nine sectional ADENs.

The jurisdiction of Engineering Officers is given below:-

Designation

BG/NG

Jurisdiction

Route

From Km

To Km

Sr.DEN-C/UMB

Whole Ambala Division

Sr. DEN-I/UMB

BG

DLI-UMB-KLK,

SRE-SNL,

CDG – NMDA,

CDG- MRND

189.12

236.00

0.00

42.389

265.55

264.700

43.89

44.350

Sr. DEN-IV/UMB

BG

UMB-LDH,RPJ-BTI,

SIR-AADR-DAULATPUR CHOWK

NMDA –SNL

264.700

0.000

0.000

43.10

359.00

15.800

164.14

96.07

Sr. DEN-II/UMB

BG

RPJ-BTI,

BTI-BYE PASS

BTI – SGNR,

LDH-DUI-JHL,

JHL – HSR,

RPHR-STR

DLI – FZR.

15.800

0.00

0.00

4.00

1.16

0.00

295.56

173.38

5.60

125.00

126.48

79.48

0.99

298.26

Sr. DEN-III/UMB

BG

NG

UMB – KLK,

MB –SRE,

GZB – SRE – UMB & JUDW Colony TPZ – HNC,

TPZ – KJGY.

CHORD LINE-SRE

KLK – SML

265.55

1584.66

176.30

0.00

0.00

0.00

0.00

266.93

1591.48

236.00

1.89

1.51

0.31

96.97

DEN/Track

BG

QUALITY AUDIT OF TRACK & MAINT. WORKS, PLANNING & USFD & Track Depot/UMB, STM/Workshop, DPWTI/JUDW

DEN/SPL

BG, NG

RTI, Audit cases, Tender Opening ,Court cases, Nivaran etc.

ADEN/LAND

BG, NG

Surprise quality inspection of work sites, Safety drive inspection & Land Works of Ambala Division

ADEN/SRE

BG

MB –SRE,

GZB – SRE – UMB,

TPZ – HNC,

TPZ – KJGY

CHORD LINE-SRE.

1584.66

176.30

0.00

0.00

0.00

1591.48

236.00

1.89

1.51

0.31

ADEN/UMB

BG

DLI – UMB – KLK.

SRE - UMB

189.12

236.00

200.33

264.700

ADEN/RPJ

BG

UMB-LDH,

RPJ-BTI,

.

264.700

0.000

359.00

15.800

ADEN/CDG

BG

UMB-KLK,

CDG – NMDA,

CDG- MRND

200.33

0.00

42.389

265.55

43.89

44.350

ADEN/SIR

BG

SIR-AADR-DAULATPUR CHOWK

NMDA –SNL.

0.00

43.10

164.14

96.07

ADEN/PTA

BG

RPJ-BTI,

LDH-DUI-JHL,

JHL – HSR

RPHR-STR

15.800

4.00

1.16

0.00

79.00

126.48

79.48

0.99

ADEN/BTI

BG

RPJ-BTI,

BTI – SGNR

DLI – FZR.

BTI BYE PASS

79.00

0.00

295.56

0.00

173.38

125.00

298.26

5.60

ADEN/SML

BG

NG

UMB – KLK,

KLK – SML

265.55

0.00

266.93

96.97

ADEN/JUDW

BG

JUDW Colony & track

3. SALIENT FEATURES:-



3.1.1 Track

Route (Kms)                  1138.59

Track (Kms)                   2201.49

Equated Track (Kms)     2561.43

ITKM                              4055.39

Group

Route Km

Track km

ETKM

Main Line

All Lines

‘B’

267.33

509.9

935.54

1208.71

‘D’

2.70

2.7

1054.93

1153.457

‘E’

771.59

773.48

N.G.

96.97

96.97

136.32

152.623

JUDW

0

0

74.7

46.64

Total è

1138.59

1383.05

2201.49

2561.43

3.1.2 State wise Route ( in Km. )

State

Route km

Punjab

715.909

Haryana

205.258

Himachal Pradesh

139.463

Uttar Pradesh

30.05

Rajasthan

31.17

Chandigarh (UT)

16.74

Total è

1138.59

3.2 Level Crossings

MANNED/ UNMANNED

BG

NG

TOTAL

MANNED

355

04

359

UN MANNED

0

0

0

TOTAL

355

04

359


State wise

BG

NG

TOTAL

Punjab

284

00

284

Haryana

50

02

52

Himachal Pradesh

05

02

07

Uttar Pradesh

11

00

11

Rajasthan

08

00

8

Chandigarh (UT)

03

00

03

Department wise

Department

Division

Interlocking

Division

Engineering

251

Interlocked

198

Traffic

108

Non-Interlocked

161

Total

359

Total

359

























Class wise

SPL

20

‘A’ Class

11

‘B’ Class

31

‘C’ Class

299

SIDING

3



Status of Manning of Level Crossings:-

Manned

Route wise manned

Manned (Engg)

251

“B” Route

49

“D” Route

-

Manned (Traffic)

108

“E” Route

303

NG Route

4

Siding

3

Total è

359

359

3.3 Buildings:-

Total Service buildings area

1576300 Sqm.

Residential accommodation area

636591 sqm

3.4 Residential accommodation: 31-3-2021

Type

Number of Qrs.

Type-I & II

12601

Type-III

671

Type-IV

238

Type-V

48

Total è

13558

3.5 Land area =7191.68Hectare




Source : Northern Railways / Indian Railways Portal CMS Team Last Reviewed : 23-03-2022  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.