Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter Find us on Youtube View Content in Hindi
National Emblem of India

About Us

NR H.Q.

Divisions

Passenger & Freight services

News & Recruitment Info

Tenders

Contact Us

Divisions
   Ambala Division
      Electrical
         Key Targets/Objectives


 
Bookmark Mail this page Print this page
QUICK LINKS
Key Targets/Objectives

 

TARGET ACTION PLAN 2022-23

 

S. No.

Items

Targets FY

2022-23

Upto 20th Dec.2022

Cumulative

Remarks

Tgt.

Actual

1

Rewiring of quarters (Nos.)

300

13

200

141

Work will be expedited.

2

Rewiring of service buildings (Nos.)

20

3

13

17

Proportionate target achieved.

3

Energy consumption (MUs)

41.56 

2.96

27.71

30.06

Eligibility of Air-conditioners has been increased in DRM office and other installations over the division.

4

Specific Energy consumption (KWH/KW/Month)

 102.69

81.83

103.16

103.65

 -

5

Fuel efficiency i.e. saving of HSD oil (in Ltrs) by improvement of power supply reliability.

 54000

2553

36000

41385

Drastic cut in power supply from SEB resulted in higher HSD oil consumption.

7

Power factor improvement to unity at those locations where the units of energy in KVAH (Nos. of sub-station)

5

-

3

7

Annual Target Met

8

Energy Audit External (Nos.)

2

-

1

-

Estimate under vetting

9

Use of Façade lighting with LEDs (Nos)

2

-

1

-

Work not shortlisted by HQ

10

Provision of LED based station name boards (Nos)

5

2

3

7

Annual Target Met

11

Automation of Pumping installations with GSM technique (Nos)

50

-

33

11

Work proposed under PH-36 but not shortlisted at HQ

12

Provision of 5 Star rating pump sets (up to 20 HP). (nos)

25

1

17

20

Being replaced as per failure of pumps.

13

Provision of Lifts (Nos) RPJ-2 Nos. in coordination with const

3

-

2

-

2 Nos. lifts will be provided at Rajpura station after completion of FOB.

14

Provision of Escalators (Nos) BTI-4 Nos & SIR-02in coordination with construction

6

-

4

-

BTI (4) and SIR (2) P.O. placed from HQ. GAD under approval.

 

However, BTI (4) :- needs to be shift due to BTI station is under redevelopment.

15

Provision ofGrid connectedsolar plant (MWp)

0.832MWp

-

0.416

0.330 MWp

16

Joint water supply signed by Sr. DEE & Sr. DEN. Stations to be decided with Sr. DEN consultation

3

-

2

-

Will be expedited.

17

Replacement of Overhead conductors with Underground cables.(nos of locations)

3

1

2

3

Annual Target Met

18

Replacement of Non star rated split/ window AC's with 3 star and above  AC's on age cum condition basis. (nos)

50

-

33

54

Annual Target Met

19

Joint checking of RRI at Sr. DEE’s level with S&T once in a year. (nos)

1

1

1

1

Annual Target Met

20

Solar Units Generation per KWP/year (KWh)

1250

60

833

1019

Proportionate target achieved.

21

Provision of SMS alert system at Lifts (Nos.)

9

-

6

9

Annual Target Met

22

Provision of SMS alert system atEscalators (Nos.)

12

-

8

12

Annual Target Met

23

Provision of 5 Star rating equipment by venders at Railway station (Nos. of stations)

10

2

7

11

Annual Target Met

24

Net Zero Station (Nos.)

1

-

0

-

धूलकोट स्‍टेशन योजना के तहत

25

Adoption of smart prepaid metering system for all Railway Installations from which Railways has to collect charges for consumption electricity.(Nos.)

4500

-

3000

-

अम्‍बाला मंडल में कुल 250 वैंडर है । इसलिए इस टारगेट को 4500 के स्‍थान पर 250 करने कर आवश्‍यकता है ।

26

To declare Railway station buildings as Green buildings(Nos.)

2

-

1

-

Solar already installed at every feasible stations.Major part for green building is from engineering side

27

Automatic Switching OFF/ON of Platforms Light for all A1/A category railwayStations (70% & 30% Circuit)

8

-

5

-

Work not shortlisted by HQ

28

Improvement of illumination levels at Stations (Footfall more than 2000/day (Nos.)

12

6

8

13

Annual Target Met

29

Provision of remote monitoring of AC installed in S&T installations

2

-

1

1

Proportionate target achieved.

 




Source : Northern Railways / Indian Railways Portal CMS Team Last Reviewed : 27-01-2023  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.