1 | Rewiring of quarters (Nos.) | 300 | 13 | 200 | 141 | Work will be expedited. |
2 | Rewiring of service buildings (Nos.) | 20 | 3 | 13 | 17 | Proportionate target achieved. |
3 | Energy consumption (MUs) | 41.56 | 2.96 | 27.71 | 30.06 | Eligibility of Air-conditioners has been increased in DRM office and other installations over the division. |
4 | Specific Energy consumption (KWH/KW/Month) | 102.69 | 81.83 | 103.16 | 103.65 | - |
5 | Fuel efficiency i.e. saving of HSD oil (in Ltrs) by improvement of power supply reliability. | 54000 | 2553 | 36000 | 41385 | Drastic cut in power supply from SEB resulted in higher HSD oil consumption. |
7 | Power factor improvement to unity at those locations where the units of energy in KVAH (Nos. of sub-station) | 5 | - | 3 | 7 | Annual Target Met |
8 | Energy Audit External (Nos.) | 2 | - | 1 | - | Estimate under vetting |
9 | Use of Façade lighting with LEDs (Nos) | 2 | - | 1 | - | Work not shortlisted by HQ |
10 | Provision of LED based station name boards (Nos) | 5 | 2 | 3 | 7 | Annual Target Met |
11 | Automation of Pumping installations with GSM technique (Nos) | 50 | - | 33 | 11 | Work proposed under PH-36 but not shortlisted at HQ |
12 | Provision of 5 Star rating pump sets (up to 20 HP). (nos) | 25 | 1 | 17 | 20 | Being replaced as per failure of pumps. |
13 | Provision of Lifts (Nos) RPJ-2 Nos. in coordination with const | 3 | - | 2 | - | 2 Nos. lifts will be provided at Rajpura station after completion of FOB. |
14 | Provision of Escalators (Nos) BTI-4 Nos & SIR-02in coordination with construction | 6 | - | 4 | - | BTI (4) and SIR (2) P.O. placed from HQ. GAD under approval. However, BTI (4) :- needs to be shift due to BTI station is under redevelopment. |
15 | Provision ofGrid connectedsolar plant (MWp) | 0.832MWp | - | 0.416 | 0.330 MWp | |
16 | Joint water supply signed by Sr. DEE & Sr. DEN. Stations to be decided with Sr. DEN consultation | 3 | - | 2 | - | Will be expedited. |
17 | Replacement of Overhead conductors with Underground cables.(nos of locations) | 3 | 1 | 2 | 3 | Annual Target Met |
18 | Replacement of Non star rated split/ window AC's with 3 star and above AC's on age cum condition basis. (nos) | 50 | - | 33 | 54 | Annual Target Met |
19 | Joint checking of RRI at Sr. DEE’s level with S&T once in a year. (nos) | 1 | 1 | 1 | 1 | Annual Target Met |
20 | Solar Units Generation per KWP/year (KWh) | 1250 | 60 | 833 | 1019 | Proportionate target achieved. |
21 | Provision of SMS alert system at Lifts (Nos.) | 9 | - | 6 | 9 | Annual Target Met |
22 | Provision of SMS alert system atEscalators (Nos.) | 12 | - | 8 | 12 | Annual Target Met |
23 | Provision of 5 Star rating equipment by venders at Railway station (Nos. of stations) | 10 | 2 | 7 | 11 | Annual Target Met |
24 | Net Zero Station (Nos.) | 1 | - | 0 | - | धूलकोट स्टेशन योजना के तहत |
25 | Adoption of smart prepaid metering system for all Railway Installations from which Railways has to collect charges for consumption electricity.(Nos.) | 4500 | - | 3000 | - | अम्बाला मंडल में कुल 250 वैंडर है । इसलिए इस टारगेट को 4500 के स्थान पर 250 करने कर आवश्यकता है । |
26 | To declare Railway station buildings as Green buildings(Nos.) | 2 | - | 1 | - | Solar already installed at every feasible stations.Major part for green building is from engineering side |
27 | Automatic Switching OFF/ON of Platforms Light for all A1/A category railwayStations (70% & 30% Circuit) | 8 | - | 5 | - | Work not shortlisted by HQ |
28 | Improvement of illumination levels at Stations (Footfall more than 2000/day (Nos.) | 12 | 6 | 8 | 13 | Annual Target Met |
29 | Provision of remote monitoring of AC installed in S&T installations | 2 | - | 1 | 1 | Proportionate target achieved. |