Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter Find us on Youtube View Content in Hindi
National Emblem of India

About Us

NR H.Q.

Divisions

Passenger & Freight services

News & Recruitment Info

Tenders

Contact Us



 
Bookmark Mail this page Print this page
QUICK LINKS
Signal & Telecom



UMB DIVN.

Group C

Group D

S/Strength

614

432

On Roll

492

324

Vacancy

122

108





    

1.0

ACHIEVEMENTS:-

1.1

To Strength Power Supply at Stations 1 No’s released IPS, utilized and installed at Ropar Thermal Plant (RTP) Make:-Amra raja/ Ver.2012. station of Ambala Division on dated.18.04.2024.

1.2

38 No’s Lever Frames are overhauled at 2 No’s Cabins (Khanalapura West Cabin & Center Cabin) ofKhanalampura West Terminalstation of Ambala Division.

1.3

To improve reliability of track circuits 231 no 80AH secondary cells replaced at CHA-60, UMB-48, SASN-51, KARR-60, KLK-12,with this total 231 nos. secondary cells have been replaced so far over Ambala division.

1.4

To improve reliability of LED signals 22 No’s Signal LED’s have been replaced at KUP-1, SEQ -2, SSW-1, SAG-2, KUP -1, MET-1, SAG -2, BTI-1, BTI-5, TPA-2, NMDA-1, and RPAR-2,DOKY-1, with these 22 Nos. LED’s has been replaced so far this year.

1.5

To improve system performance, 126 mtrs. Defective cable replaced at MFB-26, BNN-10 with this 126 mtrs. Defective cable replaced so far this year

1.6

To arrest failures due to water logging 02 Nos. IP-67 Point motors has been provided at UBC-2(PT NO-41B, 50A), with this 02 nos. IP-67 Point Motor replaced so far this year.

1.7

2.6 km OFC has been laid in ABS-PJK( 6 Km), PJK-HMK(5.2 km), HMK-FTH(5.4 km) & FTH-SGNR(10Km). OFC link has established in ABS-FTH and TC provided on OFC media. New 48V, 25A Battery charges has been provided for OFC system at GDB, MOT, ABS & PKK stations.

1.8

TPC connectivity has been provided on Railway OFC media at GDB, MOT & PKK stations. Also the SCADA circuit of SSP ABS has been shifted on BTI-ABS OFC media.

1.9

The data circuits GDB-MOT & MOT PKK for UTS/PRS has been shifted from BSNL Media to Railway OFC media.

1.10

09 Nos. Master Gate Telephone with selective calling and voice logging facility have been provided at SEQ, BTIC, BTI, MOT, PKK, PKJ, HMK, FTH & SGNR and 08 Nos Slave phone has been provided at C-140, C-137, C-82, C-67, C-75, C-79, C-87, C-88 gates.

1.11

115 Mtrs 4Q cable and 125 Mtrs 6Q cable has been shifted at LC 134 in CDG-CNDM section in connection with the work of construction of limited height subway.




Source : Northern Railways / Indian Railways Portal CMS Team Last Reviewed : 28-05-2024  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.