|
|
|

Depots at a Glance (Coaching Maintenance): There are 07 coaching depots namely LKO, BSB, FD, PBH, RBL, SLN and PYGS. Further, JNU under CDO/BSB is a small depot giving terminal attention only. Lucknow (LKO) Major C&W Depot | No. of Coaches | (Bare – 310) (Holding – 360) | Primary Maintained Trains | 10 (14209/10, 12430/29, 12420/19, 14203/04, 14215/16, 14227/28, 12230/29, 12232/31, 14259/60/61/62, & 54201 (Workman). | Secondary Maintained Trains | 2 (12539/40 & 22683/84) | Terminal Examined Trains | 14 (14219/20, 19402/01, 22121/22, 51813/14, 54255/34, 54233/51, 54281/84, 54253/32, 54332/34, 54283/82, 54231/56, 54333/31, 54252/54 & 54293/94) | Varanasi (BSB) Medium C&W Depot | No. of Coaches | (Bare – 227) (Holding – 249) | Primary Maintained Trains | 07 (22408/07, 14236/35, 14266/65, 12238/37, 14219/20, 14223/24 & 82401/02/03/04). | Secondary Maintained Trains | 03 (22970/69, 16229/30 & 17323/24) | Terminal Examined Trains | 20 (22417/18, 11071/72, 11093/94, 19167/68, 54256/55, 24228/14227, 12167/68, 54264/91, 54334/33, 13133/34, 14203/14, 19407/08, 20903/04, 53521/22, 54292/65, 54267/70, 14863/53/65, 53661/62, 13345/46, & 54266/68). | Faizabad (FD) Medium C&W Depot | No. of Coaches | (Bare – 167) (Holding – 189) | Primary Maintained Trains | 04 (14206/05, 14221/22, 54237/31 & 54232/54/51) | Secondary Maintained Trains | 1 (16793/94) | Terminal Examined Trains | 06 (11067/68, 54373/74, 54371/72, 54109/54110, 54234/38 & 22103/04). | Pratapgarh (PBH) Minor C&W Depot | No. of Coaches | (Bare – Nil) (Holding – Nil) | Pri. & Sec. Maintained Trains | Nil | Terminal Examined Trains | 07 (14207/08, 12183/84, 14123/24, 12173/74, 54294/93, 74202/01 & 54291/92). | Raebareli (RBL) Minor C&W Depot | No. of Coaches | (Bare – 20) (Holding – 24) | Primary Maintained Trains | 03 (14201/02, 54221/24 & 54225/28). | Secondary Maintained Trains | Nil | Terminal Examined Trains | 05 (21067/68, 54153/54, 54221/24, 54211/12 & 54225/28) | Sultanpur (SLN) Minor C&W Depot | No. of Coaches | (Bare – 63) (Holding – 72) | Primary Maintained Trains | 02 (54282/66, 54284/64) | Secondary Maintained Trains | Nil | Terminal Examined Trains | 04 (14013/14, 54263/83, 19403/04 & 12143/44). | Jaunpur (JNU) Minor C&W Depot | No. of Coaches | (Bare – Nil) (Holding – Nil) | Pri. & Sec. Maintained Trains | Nil | Termination for Watering, Cleaning & Revalidating of BPC | 04 (54375/76, 54213/14, 54261/62 & 14202/01). | Prayag Ghat Sangam (PYGS) Minor C&W Depot | No. of Coaches | (Bare – 32) (Holding –42 ) | Primary Maintained Trains | 03 (54213/14, 02 Slip coaches of 24512/11 & 14229/30 | Secondary Maintained Trains | 01 (14512/11) | Terminal Examined Trains | 14 (14218/17, 14102/01, 75115/16, 14210/14233, 14234/14209, 54102/01, 54254/53, 54374/77, 54378/71, 14308/54375, 54376/14232, 14231/14307, 54372/73 & 14216/15) | Attention to Through Trains Stations | LKO | BSB | FD | PBH | No. of Platforms | 9 | 9 | 5 | 3 | Watering Facility Available | All | All | All | Platform No. 3, Line No. 4 | Rolling in Inspection Light | All | All | Nil | Nil | Freight Activities: LKO is the only Freight Examination Point and there are two freight examination yard. Namely, UP Yard & DN Yard (08:00 to 16:00 Hrs.). Since 16.03.2019, intensive examination of freight stock has been stopped and only Premium Examination of freight stock is being attended. Total Lines - 05 Lines (UP Yard) & 07 Lines (DN Yard) Premium Examination Examination Line - UP yard Line No. 6 is only feasible for examination Gangs Operated - 01 In general shift. Pathways Available - 02 (Between line no. 4 & 6, 6 & 7) in UP Yard 02 (Between line no. 4 & 6, 7 & 8) in DN Yard Air Compressors - Two nos. feeding both the Yards Previous Output of Both Yards Avg. load examined/day - UP & DN Yd - 3.5 Monthly Average - 104 Loads Sick Line for Freight Stock Working shed available - 16 m wide x 90 m long DVS & DVN wagons are attended each day. DVS holding capacity - 140 units Working capacity - 105 units Grading of Lucknow Yard Category “B” Class Maintenance of Captive Stock 1.01 DMT Rake having 37 BOBYN. 2.01 PQRS having 13 BRN wagons. The frequency of examination is once in 30 days. ROH and POH Wagons supplied to UMB, KJGY, MB & BAAD for ROH and JUDW & KTTW Shop for POH. Infrastructure: Sick Line: S. No. | Depot | Description of Facilities | Capacity | 1. | LKO | Freight Work: New shed for freight work in sick line size 16m x 90m. 03 lines in the shed. No EOT installed. | Capacity of Sick line DVS holding (Goods) 140 units working 105 units. | Coaching Work: Old shed for coaching work in sick line size 15m x 53m having 02 lines. No EOT installed. | Capacity of DVS Chg. in Sick line - 24 holding. Working capacity - 16. | New Hump-6- 510 meter length 17 Coach holding 12 Coach working New Hump-8- Divided in 02 parts 215 Meter length for freight on west end. 28 Wagon holding 21 Wagon working 215 Meter length for coaching on east end. 07 Coach holding 04 Coach working along with 01 Pit. | Up-gradation of existing S/Line work sanctioned. DE under preparation. | 2. | BSB | One shed for coaching size 18 m x 70 m having 02 lines with EOT 10 Ton. | Capacity 06 coaches can be attended in shed total DVS (Chg.) 04 coaches can be placed in Sick line. Further, construction of New S/Line is under progress | 3. | FD | No shed available, 02 nominated lines available (Thoker-43) for sick line activities. | For each line, holding capacity is 04 coaches and working capacity 02 coaches. | 4. | RBL | No shed available, 01 nominated line available in loco shed for coach repair. | - | 5. | SLN | No shed available, nominated line available at NPOH shed SLN, 03 km away from station. | - | 6. | PBH | No shed available, 01 nominated line available at old loco shed. | - | 7. | PYGS | Sick Line Shed with EOT is under construction | - | Washing Line: | Description | Pit Type | Capacity | Facilities Available/ Required | Remarks | LKO | Old W/L – 1 | Non Standard Pit | 18 CL | No Scope of Extension. | Work for Up-gradation of existing New W/Line as per CAMTECH Drawing proposed in WP 2019-20, Vol-II, PH-42 (Umbrella Work). Pending with Board | Old W/L – 2 | 17 CL | Old W/L – 3 | Standard Pit | 15 CL | Old W/L – 4 | 12 CL | New W/L | 26 CL | Goods Shed W/L | 26 CL | BSB | W/L – 1 | Standard Pit | 26 CL | - | Work for Up-gradation of existing WL No. 4 as per CAMTECH Drawing is sanctioned & LOA issued. Further, construction of 02 nos. of 26 coach length washing line is under progress | W/L – 2 | Non Standard Pit | 22 CL | No Scope of Extension | W/L – 3 | 22 CL | W/L – 4 | 26 CL | FD | New W/L | Non Standard Pit | 21 CL | No scope of Extension. | Almost completed 25 years life. Drainage system is defective causing water logging. | Old W/L – 1 | 08 CL | No scope to extend. | New 26 CL washing line sanctioned but work execution not possible because of site unavailability | Old W/L – 2 | SLN | W/L-1 | Standard Pit | 26 CL | - | - | W/L-2 | Standard Pit | 26 CL | - | - | PBH | W/L | Shallow Pit | 08 CL | No Scope of Extension. | This washing has been abondoned and new 26 CL Washing Line work under progress. | RBL | W/L – 1 | Non Standard Pit | 14 CL | - | Extension of existing and Construction of 01 no. 26 Coach length washing line is under progress. | PYGS | WL-1 Wl-2 | Standard Pit | 26 CL 26 CL | 
Source : Northern Railways / Indian Railways Portal CMS Team Last Reviewed : 26-05-2023
|
|
|