1 | Rewiring of quarters (Nos.) | 300 | 3 | 25 | 3 | Work in progress |
2 | Rewiring of service buildings (Nos.) | 20 | 3 | 2 | 3 | Proportionate target achieved |
3 | Energy consumption including DISCOM, Solar generation and DG sets Generation (KWH/KW/Month) | 41.42 | 2.86 | 3.45 | 2.86 | |
4 | Specific Energy consumption including DISCOM, Solar generation and DG sets Generation (KWH/KW/Month) | 101.39 | 72.09 | 101.39 | 72.09 | |
5 | HSD oil consumption (in Liters) up to Feb.24 | 54000 | 5745 | 4500 | 5745 | Additional HSD oil consumed due to power supply cut from SEB for preventive maintenance |
6 | Segregation of Domestic & Commercial supply to avail benefit of tariff (Nos.) | 0 | 0 | 0 | 0 | As per PSPCL policy, segregation of load is not allowed for mixed load. Segregation of load has already been done at major stations of Haryana i.e. Ambala Cantt. |
7 | Power factor improvement to unity at those locations where the units of energy in KVAH (Nos. of sub-station) | 5 | 0 | 0.42 | 0 | Work is under planning |
8 | Energy Audit External (Nos.) | 2 | 0 | 0.167 | 0 | Tender discharged, now retendering will be done soon |
9 | Use of Façade lighting with LEDs (Nos) | 2 | 0 | 0 | 0 | Work will be done under ABSS |
10 | Provision of LED based station name boards (Nos) | 5 | 0 | 0 | 0 | Work will be done under ABSS |
11 | Automation of Pumping installations with GSM technique (Nos) | 50 | 0 | 4 | 0 | Work proposed |
12 | Provision of 5 Star rating pump sets (up to 20 HP). (nos) | 25 | 0 | 2 | 0 | Will be procured through Indent |
13 | Provision of Lifts (Nos) RPJ-2 Nos. in coordination with constt. & UBC-01 | 3 | 0 | 0.25 | 0 | |
14 | Provision of Escalators (Nos) BTI-4 nos & SIR-02 | 6 | 0 | 0.5 | 0 | Escalators surrendered |
15 | Provision of grid connected solar plant (KWP) | 500 | 0 | 42 | 0 | Tender discharged, now retendering will be done soon |
16 | Joint water supply signed by Sr. DEE & Sr. DEN. Stations to be decided in consultation with Sr. DEN | 3 | 0 | 0.25 | 0 | |
17 | Replacement of Overhead conductors with Underground cables. (no. of locations) | 5 | 0 | 0.42 | 0 | Replacement of overhead conductor with ABC cable as per HQ guidelines |
18 | Replacement of Non star rated split/ window AC's with 3 star and above AC's on age cum condition basis. | 50 | 5 | 4 | 5 | Work under progress |
19 | Joint checking of RRI at Sr. DEE’s level with S&T once in a year. (nos) | 1 | 0 | 0 | 0 | |
20 | Solar Units Generation per KWP/year (KWh) | 1250 | 440.54 | 104 | 440.54 | |
21 | Provision of 5 Star rating equipment by venders at Railway station (Nos. of stations) | 5 | 1 | 0.42 | 1 | Proportionate target achieved |
22 | Net Zero Station (Nos.) | 2 | 0 | 0 | 0 | |
23 | Adoption of smart prepaid metering system for all Railway Installations from which Railways has to collect charges for consumption electricity.(Nos.) | 14000 | 0 | 1166 | 0 | Work proposed |
24 | To declare Railway station buildings and Railway office/Hospital buildings as Green buildings(Nos.) | 2 | 0 | 0.167 | 0 | Solar already installed at every feasible stations. Major part for green building is from engineering side |
25 | Automatic Switching OFF/ON of Platforms Light for all A1/A category railway Stations (70% & 30% Circuit) | 5 | 0 | 0.42 | 1 | Proportionate Target achieved |
26 | Replacement of Conventional fans with BLDC fans (Nos.) | 1000 | 0 | 83.33 | 0 | Work proposed |
27 | Provision of solar panel at station ( no. of station) | 10 | 0 | 0.83 | 0 | |
28 | Safety audit (as per RB instructions) Nos. | 15 | 1 | 1.25 | 1 | Sirhind |