S.No | ACHIEVEMENTS |
1 | Two foldable type rescue platforms (for BD Crane UMB & BTI) had been provided on 18..04.2022 |
2 | 189 nos. of safety shoes i.e ( UMB =54,BTI=50,SRE=50 & KLK=35) have been provided for all ARTs on dated 23-04-2022. |
3 | 189 nos. of winter jackets i.e ( UMB =54,BTI=50,SRE=50 & KLK=35) have been provided for all ARTs on dated 25-04-2022. |
4 | A Panel of 74 nos of LPS has circulated on dated 13-04-2022. |
5 | In this month 03 Safety Drives has been launched regarding summer/hot weather precautions,precautions to be taken during train working in stormy/fast wind blowing,application of vigilance penalty brake,prevention of SPAD . |
6 | Safety seminar has been organized by ADME/OP/UMB at KLK ,CDG& SRE on dated 28-04-2022 & 29-04-2022 respectively |
7 | A safety seminar cum CLIs meeting was organized on 05-05-2022 headed by worthy DRM/UMB. |
8 | Safety seminar has been organized by ADME/OP/UMB at KLK ,CDG& SRE on dated 28-04-2022 & 29-04-2022 respectively. |
9 | 180 nos.new FSD have been received on date 10-05-2022. |
10 | Safety seminar organized at RR/DUI by ADME/OP/UMB on 14.05.2022 . |
11 | 02 all in one PCs of SSE/Dsl/UMB have been received on 18.05.2022. |
12 | 180 nos.of battery charger for HYT TC make walkie talkie sets have been procured and distributed among all crew lobbies over UMB division. |
13 | Coach no. X00878 (MFD Van) received at UMB under RSP from AMVW/LKO.Now this coach has been attached with ART UMB take at 18.30 hrs. on 17.07.2022 after commissioning at sick line UMB. |
14 | Control table & 08 pairs of hydraulic hoses of MFD make for HRE ART/BTI has been procured/received on 29.07.2022. |
15 | In this month 02 Safety Drives has been launched i.e Divisional safety drive Mech./Rso no. 07/2022 regarding counseling to Running staff in connection with recommendation made by enquiry committee of derailment of 12 coaches of 11061 Dn. Central railway on 03.04.2022 & Divisional safety drive Mech./Rso no. 09/2022 regarding precautions to be taken during train work in monsoon/rainy weather . |
16 | 12 nos.of printers have been received on 10.08.2022 by CCC/UMB , out of which 01for lobby UMB,02 for lobby CDG,05 for lobby BTI & 04 for lobby SRE. |
17 | Safety seminar organized by Sr.DME/O&F UMB & Sr.DSO/UMB at KLK shed on 31.08.2022 and counseled the Running staff to prevent SPAD cases & about safe train operation. |
18 | Hydraulic oil tank(Holmatro power pack received 10.09.2022,replaced on date 15.09.2022 and working OK. |
19 | Safety seminar organized by Sr.DME/O&F UMB at Lobby CDG and Lobby BTI on date 24-09-22 &28-09-22 and counseled the Running staff to prevent SPAD cases & about safe train operation. |
20 | 05 LEDs have been procured on 28.10.2022 and provided on major lobbies i.e UMB,SRE,BTI,CDG&KLK of UMB division for counseling of running staff. |
21 | 05 nos. of Safety seminar organized by Sr.DME/O&F UMB and ADME/OP/UMB over UMB division during the month Oct.2022. |
22 | 35 nos. of Full body hornless safety belts have been received on 31.10.2022 for all ART’s over the division. |
23 | Railway owned Electronic in motion weigh bridge (WIMWB) has been commissioned at KJGY line no.15 on 19.11.2022. |
24 | Signal location booklets have been issued to all running staff during the month Nov.2022. |
25 | 140 nos. bags for fog safe device have been procured on 12.11.2022 and provided to all lobbies over UMB division. |
26 | 28 nos., 26 nos. and 14 nos. new office/visiting chairs for loco and lobby office UMB, SRE and CDG have been provided on 19.11.2022, 15.11.2022 and 20.11.2022 respectively. |
27 | 02 Nos. of new Dining tables and 03 Nos. of new center tables have been provided at RR/CDG on 18.11.2022. |
28 | 02 nos. of new steel Almirahs have been procured for lobby CDG on 18.11.2022. |
29 | Separate female washroom has been provided at crew lobby CDG |
30 | In view of ban of single use plastic, paper straws for BA test of running staff have been provided at all lobbies over UMB division. |
31 | 08 nos. (05 nos. of 15 Litres & 03 nos. of 25 litres) of electric geyser has been provided at R.Room UMB. |
32 | 68 nos. of steel beds received at running room UMB & 49 nos. for running room DUI. |
33 | During the month December 2022 ,02 nos. of safety seminar organized by Sr.DME/O&F UMB at BTI & SRE and 01 safety seminar by ADME/OP/UMB at CDG. |
34 | During the month Jan.2023 safety seminar organized at BTI lobby by Sr.DME/O&F/UMB. |
35 | 66 nos. steel beds have been provided at RR/UMB. |
36 | 02 nos. leg massager and 02 nos. exercise bike has been provided at RR/UMB on 18.01.2023. |
37 | 116 nos. of mattresses have been provided at RR/SRE |
38 | One pitless EIMWB has been commissioned at KJGY line no.15 on 19.11.2022 & FOIS connectivity has been provided on 14.12.2022 |
39 | SPARMV SRE coach no. 8639 DPC(tool van+8295 medical van)has been sent for POH at charbagh workshop LKO on 27.01.23. |
40 | Attached toilet bathroom has been provided with room no.1 for female running room CDG on 21.02.2023. |
41 | During the month three safety seminar organized by Sr. DME/O&F/UMB at lobby UMB,SRE &BTI on date 19/2,21/2 &25/2/23 respectively. |