INFRA STRUCTURAL OVERVIEW
·Electrified RKM- 1533.89.
·Electrified TKM- 3668.600 (100% electrification of division completed).
·18 OHE depots.
·6 PSI depots.
·1 Remote Control Centre.
·1 Workshop-cum-store.
·20 nos. traction sub stations (TSSs), 32 sectioning posts (SPs), 81 nos. sub sectioning posts (SSPs) and 19 nos. isolators gantries.
KEY TARGETS/OBJECTIVES
Maintenance Targets: -
·IOH of OHE-2051 TKM
·POH of ATD- 495 nos.
·AOH of ATD-6145 nos.
·Checking of T/O & Cross Overs-3004 nos.
·Annual schedule of Isolators-1345 nos.
·Annual schedule of section insulator- 1717 nos.
·Annual schedule of Switching stations- 144 nos.
·Relay Testing-20 nos. TSS.
·Checking of PTFE- 400 nos.
2.Special Works Targets to improve the reliability of OHE system: -
·Replacement of overaged and weak catenary wire- 100 Kms.
·Replacement of silver brazed contact wire- 100 Kms.
·Replacement of corroded cantilever assemblies- 3000 nos.
·Replacement of corroded steel anti- creep wires- 57 nos.
·Provision of pipes in drop arm of portal as anti-bird measures- 250 nos.
·Provision of monkey scare measures at portals & designated location like girder bridges etc.- 750 nos.
·Provision of circular discs on cantilever assemblies as anti-bird measures in identified birding area- 400 nos.
·Provision of packing saddle (RI-1174) in catenary suspension clamp - 14908 nos.
·Provision of parallel contact wire over RRA clamps- 266 nos.
·Replacement of 105 sqmm jumpers with 160 sqmm jumpers on isolators- 840 nos.
INFRA STRUCTURAL OVERVIEW
·Electrified RKM- 1508.
·Electrified TKM- 3558 (100% electrification of division completed).
·18 OHE depots.
·6 PSI depots.
·1 Remote Control Centre.
·1 Workshop-cum-store.
·20 nos. traction sub stations (TSSs), 32 sectioning posts (SPs), 81 nos. sub sectioning posts (SSPs) and 19 nos. isolators gantries.
STAFF STRENGTH
·Sanctioning strength- 982 posts.
·On Roll Staff- 913 posts.
·Vacancy- 69 posts.