Main works done by Moradabad Division in the month of Apr-25
i. During this month, work of installing anti monkey menace mast was done at location no. 844 in Moradabad division.
ii. During this month, work of replacing 430 meter catenary wire was done by Moradabad depot.
iii. During this month, work of maintenance of gantry no. 4 was done by Moradabad division.
iv. During this month 153 Nos. of section insulators were checked by Moradabad Division.
v. During this month 184 Nos. of turn outs and cross-overs were checked by Moradabad Division.
vi. During this month 106 Nos. of AOH of isolators were checked by Moradabad Division.
vii. During the month, 42 Nos. rusted cantilevers were replaced in Moradabad Division.
viii. During the month, 2 Nos. over age PSI assets were replaced by Moradabad Division.
ix. During the month, 17 Nos. plates were replaced with retro reflective No. plates in Moradabad Division.
x. During this month, thermovision checking of 160 TKM OHE and 12 switching posts was done in Moradabad Division.
xi. During this month, 622 Nos. saddle plate installation work was done in Moradabad Division.
xii. During this month, 290 Nos. tree trimming was done in Moradabad Division.
xiv. During this month, splice of catenary wire was done at 46 Nos. locations in Moradabad Division.
xv. During this month, parallel contact wire was installed at 154 Nos. RRA in Moradabad Division.
xvi. During this month, 1265.47 RKM live line checking was done in Moradabad Division.
xvii. During this month, cleaning of 153 Nos. muffs was done by Moradabad Division.
xviii. During this month, 25 Nos. of pollarding and felling of trees was done in Moradabad Division.
xix. Moradabad Division is carrying out joint survey with PWI for felling of dangerous trees.
xx. During this month, 05 Nos. of earth electrodes were installed in Moradabad Division.
xxi. During this month, work of replacing catenary wire with contact wire under FOB at 3 no. locations in Moradabad Division was carried out.
xxii. During this month, work of removing 4 no. abandoned OHE structure was carried out in Moradabad Division.
xxiii. Yard cleaning work of SP/SSP was done by Roza Depot in Moradabad Division during this month.
Maintenance work of OHE-
The maintenance work of OHE this month is as follows-
IOH | 172.25TKM |
SSWIRE LUBRICATION | 481 no |
turn out and cross over | 184 no |
Auto Tension Device (IOH) | 480 no |
Auto Tension Device (POH) | 01 no |
Section Insulator (IOH) | 57 no |
Isolator (IOH) | 106 no |
issue new bonds | 209 no |
System Improvement :-
The following special works have been done for this-
tree pruning | 290 No |
removing moth threads | 136 No |
muff cleaning | 153 No |
Progress in railway electrification work –
v Group 107 (Khurja- Meerut) -
v The linking work of Tower Wagon Shed in Hapur is under progress.
Group 159 (Ghaziabad – Moradabad) :-
• The connectivity work of Towerwagon siding of HPU is under progress.
Group 248 (Moradabad – Chandausi – Bareilly – Harduaganj section) :-
• The connectivity work of Towerwagon siding of Chandausi and Rajghat station is under progress.
Group 242 (Unnao – Balamau – Sitapur)-
• The work of connectivity of Towerwagon siding of BLM through RE/LKO in Unnao – Balamau – Sitapur section is under progress.