Electrical:

Major activities of Electrical General Department are maintenance of power supply arrangement and maintenance of coaches. The power supply department has been divided into 11 activity zones viz. Firozpur, Jalandhar, Ludhiana, Amritsar, Pathankot & Baijnath Paprola under Sr. DEE/G/FZR and Jammu Tawi, MCTM, Shri Mata Vaishno Devi Katra, Banihal & Budgam under Sr. DEE/TR/JAT.
The overhauling and repair of Oil Engine and Pumps of division (except for Katra, Banihal & Budgam Depots) has been centralized at Jalandhar City, under the charge of Sr. Section Engineer/Oil Engines & Pumps.
Division has four major coaching depots at Firozpur, Amritsar, Jammu and Shri Mata Vaishno Devi Katra.
The department has sanctioned staff strength of 2133 Nos. & on roll staff is 1485.
S. N. | Designation | SS | OR | Vacancy |
1 | Supervisor | 167 | 124 | 43 |
2 | Staff | 1917 | 1327 | 590 |
3 | Ministerial Staff | 49 | 34 | 15 |
Grand Total | 2133 | 1485 | 648 |
Assets of Electrical General Power Supply:
Major Assets over Firozpur Division |
S.N. | Asset Description | Qty, |
1. | Railway Stations | 262 |
2. | Railway Quarters | 11689 |
3. | Service Buildings | 313 |
4. | Electric Sub-stations | 85 |
5. | HT Connections | 71 |
6. | LT Connections | 884 |
7. | Transformers | 136 |
8. | DG sets under SSE/OE&P/JUC | 113 |
9. | Pumps (1.5 HP) under SSE/OE&P/JUC | 284 |
10. | Pumps (Submersible) under SSE/OE&P/JUC | 154 |
11. | Window Air Conditioners | 549 |
12. | Split Air Conditioners | 318 |
13. | Water Coolers | 214 |
14. | Solar Plants Capacity (10 kW & above) | 3044 kWp |
15. | Lifts | 13 |
16. | Escalators | 18 |
17. | HT Crossing Lines (Overhead & Underground) | 910 |
18. | AT Panels | 234 |
19. | High Mast Towers | 142 |
Coaching Infrastructure over Firozpur Division:
a) | Major Coaching Depot | Firozpur, Amritsar, Jammu and Shri Mata Vaishno Devi Katra. |
b) | Other Coaching Depots | Pathankot (NG), Budgam (Upcoming) |
c) | Stations with staff for train passing duties | MCTM, Ludhiana & Jalandhar City |
i.Primary Trains:48
ii.Primary Rakes:71
iii.Primary Coaches:1379
iv.Secondary Coaches:480
Duty List of Officers & Key Supervisors
Duty List of Officers:
S. N. | Name | Designation | Duty List |
1. | Sh. Sudesh Kumar | DEE/Cord/BDGM | All matter pertains to Power supply management, AC and TL over BAHL, BDGM and USBRL section. |
2. | Sh. Amit Ranjan | ADEE/G/FZR | All matter pertains to Power supply management, OE&P, AC and TL over FZR, LDH & JUC section. |
3. | Sh. Vakeel Singh | ADEE/G/ASR | All matter pertains to Power supply management, AC and TL over ASR, PTK & BJPL section. |
4. | Sh. Pardeep Kumar | ADEE/G/SVDK | All matter pertains to Power supply management, AC and TL over SVDK & JAT section. |
Duty List of Key Supervisor:
S. N. | Name | Designation | Duty List |
1. | Sh. Amit Roshan Kujur | SSE | CTA to Sr. DEE/G/FZR and works pertaining to Power Supply system including monitoring & billing of execution. |
2. | Sh. Satendra Kumar | SSE | Look after all the electric coaching related works over division. |
3. | Sh. Ravinder Singh | SSE | All tender works pertains to Electrical Coaching including monitoring & billing of execution. |
4. | Sh. Brijpal | SSE | Estimate work |
5. | Sh. Anil Kumar | SSE | Correspondence with HQ & depots. Temporary power connections and power supply matters over the division. |
6. | Sh. Mayank Chandra | JE | All store related works |
Role of Depot Incharges:
1.Power Supply: Carry out maintenance work of all electrical assets like HT/LT substations, all service buildings, staff quarters, LC gates, Power cables, Lifts & Escalators and to ensure uninterrupted power supply and safety in his jurisdiction.
2.Air Conditioner: Carry out maintenance of all ACSP assets and maintenance of AC coaches.
3.Train Lighting: Maintenance of Non-AC coaches.
4.Oil Engine & Pump:Maintenance and proper functioning of all types of pumps and DG sets over the division.
Key targets/Objectives:
Key Targets achieved by the electrical department in 2023-24:
Power Supply:
S. N. | Description | Target | Progress |
1. | Rewiring of service building | 10 | 10 |
2. | Provision of 5 star rating pump set upto 20 HP | 60 | 74 |
3. | Replacement of overhead conductor with underground cable | 4 | 4 |
4. | Replacement of non star rated Split/Window ACs with 3 star and above ACs on age cum condition basis (No.) | 50 | 50 |
5. | Conduct of electrical safety audit of LV installation as per Railway Board instruction (Nos.) | 15 | 15 |
Coaching:
S. N. | Description | Target | Progress |
1. | Punctuality loss on account | 0.83 | 0.75 |
2. | Enroute coach detachment | 3 | 1 |
3. | Addition MPCB and shifting of pump controller from u/f cubical to top jn. Box | 165 | 165 |
4. | Railmadad outstanding satisfactory feedback from customers | More than 90% | 92% |
Position of Major & Minor Penalty Charge sheet:
S. N. | Type of Penalty | No. of Penalty |
1. | Major | 32 |
2. | Minor | 24 |