S&T TARGETS FOR 2022-23 | | |
| | | | |
S.No. | ITEMS | UNITS | TARGET 22-23 | COMM. PROGRESS |
A) | SIGNALLING | | |
A) | PRIME FOR 2022 - 23 UMB | | | |
1 | Replacement of identified defective cable | Km | 0 | 21.12 |
2a | Replacement of over aged defective Point Machines | Nos. | 38 | 47 |
2b | Replacement of TWS Point Machines i.e. with Thick Web Switches | Nos. | 204 | 135 |
3 | Automatic Fire detection and Alarm system | Stns | 28 | 6 |
4 | Testing of Safety Integrity of Stations | Stns | 0 | 0 |
5 | Block Proving (BPAC) media redundancy OFC & Quad | B/Sec | 10 | 11 |
6 | Block Proving with equipment redundancy SSDAC/HASSDAC | B/Sec | 8 | 10 |
7 | Provision of Sliding Boom atInterlocked Lavel Crossing gate | Nos. | 0 | 1 |
8 | Failure Alam for Track Feed battery chargers | Stns | 5 | 7 |
9 | EI Modifications-departmentally for minor alterations | Alt | 1 | 0 |
10 | Provision of Remote Terminal Unit (Data Loggers) at Interlocked LC gates and IBS | Nos. | 10 | 12 |
11 | Monitoring of ELD through Data Logger | Stns | 0 | 6 |
12 | Provision of AC in Relay Room | Stns | 0 | 5 |
B) | Redundancy arrangement for Reliability Improvement of Signalling System | | | |
1 | 3 sources of Power Supplywith changeover arrangements | | | |
1a | At Stations/Cabins/Relay Huts | Nos. | 23 | 3 |
1b | At Interlocked LC Gates (Block Section) | Nos. | 23 | 2 |
2 | Diversity of cables extending power supply to cabins/relay huts/gates/auto huts with a changeover arrangement(Utilizationing of existing spare cable) | Nos. | 0 | 6 |
3 | Ring arrangement for Power Supply to functions at < 100Route Station(Utilizationing of existing spare cable) | Stations | 24 | 6 |
4 | Replacement of Analog Axle Counter for Block Working | Nos. | 10 | 27 |
5 | Implementation of Auto Re-setting arrangement where dual detection available | Nos. | 0 | 0 |
C) | Preventive Arrangements | | | |
1 | Provision of IPS at LC Gates | LC | 4 | 2 |
2 | Provision of IP-67 Point Machines/Motors at water logging prone areas | Nos. | 27 | 0 |