Due to Traffic Block at Lucknow Jn. Station, the following trains shall be diverted/short-terminated/short-originate/terminal change/change in platform, as under:-
1.) Blocks from 24.06.26 to 27.06.26 and their repercussions are as under:-
Diversion of trains:-
1). 15067 JCO 24.06.26 diverted via ML-ASH-MKG instead of ML-LKO-MKG (Stoppage skipped- LKO), (Stoppage to be provided-BNZ-5 min, ASH-10 min).
2). 12598 JCO 24.06.26 diverted via MKG-ASH-ML instead of MKG-LKO-ML (Stoppage skipped- LKO), (Stoppage to be provided-ASH-10 min, BNZ-5 min).
3). 19053 JCO 26.06.26 diverted via MKG-ASH-ML instead of MKG-LKO-ML (Stoppage skipped- LKO), (Stoppage to be provided-ASH-10 min, BNZ-5 min).
PF Change of trains reaching Lucknow Jn. from 24-06.26 to 27.06.26:-
|
Trains reaching Lucknow Jn. on 24.06.26 |
Trains reachingLucknow Jn. on 25.06.26 |
|
|
Shifting of PF |
Shifting of PF |
|
|
Trains reaching LKO on 26.06.26 |
Trains reaching LKO on 27.06.26 |
|
|
Shifting of PF 22489 (13:40-13:50) shifted to PF-2 |
Shifting of PF
|
2). Repercussions of PF 4 from 24.06.26 to 13.09.26.
Short termination/origination:-
|
S. No. |
Train No. |
From |
To |
Short Termination/origination |
JCO |
Trips |
Remarks |
|
1 |
64701 |
VGLJ |
LKO |
Short Terminate at CNB |
24/06/26 TO 13/09/26 |
82 |
|
|
2 |
64702 |
LKO |
VGLJ |
Short Originate ex CNB |
24/06/26 TO 13/09/26 |
82 |
|
|
3 |
54338 |
SPN |
LKO |
Short Terminate at AMG |
24/06/26 TO 13/09/26 |
82 |
|
|
4 |
54332 |
BLM |
LKO |
||||
|
5 |
54337 |
LKO |
SPN |
Short Originate ex AMG |
24/06/26 TO 13/09/26 |
82 |
|
|
6 |
54331 |
LKO |
BLM |
||||
|
7 |
22683 |
YPR |
LKO |
ST at UTR |
JUNE-22, 29 |
12 |
Rake will go to RBL/ SLN for SM Suitably. |
|
8 |
22684 |
LKO |
YPR |
SO ex UTR |
JUNE-25 |
12 |
|
|
9 |
64212 |
CNB |
LKO |
ST at MKG. |
24/06/26 to 13/09/26 |
82 |
64212 will work 64255 ex MKG and 64282/64281 will work by a separate rake, for maintenance purpose a spare rake to be provided from HQRS office. |
|
|
64255 |
UTR |
CNB |
SO ex MKG |
24/06/26 to 13/09/26 |
82 |
|
|
10 |
15107 |
BNRS |
LKO |
ST at UTR |
24/06/26 to 13/09/26 |
82 |
|
|
11 |
15108 |
LKO |
BNRS |
SO ex UTR |
24/06/26 to 13/09/26 |
82 |
|
Terminal change of trains: -
|
S. No |
Train |
From |
TO |
Arri |
Dep |
Days |
Terminal change to Lucknow /NER |
JCO |
Trips |
|
1 |
64214 |
CNB |
LKO |
21:15 |
Ter. |
Daily |
Terminal change to LJN/NER |
24/06/26 TO 13/09/26 |
82 |
|
2 |
64203 |
LKO |
CNB |
Org. |
07:05 |
Daily |
Org. Ex LJN/NER |
25/06/26 to 14/09/26 |
82 |
|
3 |
22121 |
LTT |
LKO |
13:30 |
Ter. |
7 |
Terminal change to LJN/NER |
JUNE-27 |
12 |
|
4 |
22122 |
LKO |
LTT |
Org. |
16:10 |
7 |
Org. Ex LJN/NER |
JUNE-28 |
12 |
Diversion of Trains:-
|
S. No |
Train No. |
From |
To |
Proper route |
Diverted Route |
JCO |
Trips |
|
1 |
14307 |
PYGS |
BE |
UTR-LKO-AMG |
UTR-TPNR(N/L)-AMG |
24/06/26 to 13/09/26 |
82 |
|
2 |
14308 |
BE |
PYGS |
AMG-LKO-UTR |
AMG-TPNR N/L-UTR |
24/06/26 to 13/09/26 |
82 |
|
3 |
14241 |
PYGS |
SRE |
UTR-LKO-AMG |
UTR-TPNR(N/L)-AMG |
24/06/26 to 13/09/26 |
82 |
|
4 |
14242 |
SRE |
PYGS |
AMG-LKO-UTR |
AMG-TPNR N/L-UTR |
24/06/26 to 13/09/26 |
82 |
|
5 |
15075 |
SKTN |
TPU |
UTR-LKO-AMG |
UTR-TPNR(N/L)-AMG |
24/06/26 to 13/09/26 |
82 |
|
6 |
15073 |
SGRL |
TPU |
UTR-LKO-AMG |
UTR-TPNR(N/L)-AMG |
||
|
7 |
15074 |
TPU |
SGRL |
AMG-LKO-UTR |
AMG-TPNR N/L-UTR |
24/06/26 to 13/09/26 |
82 |
|
8 |
15076 |
TPU |
SKTN |
AMG-LKO-UTR |
AMG-TPNR N/L-UTR |
||
|
9 |
13037 |
HWH |
DDN |
UTR-LKO-AMG |
UTR-TPNR(N/L)-AMG |
24/06/26 to 13/09/26 |
82 |
|
10 |
13035 |
HWH |
DDN |
UTR-LKO-AMG |
UTR-TPNR(N/L)-AMG |
||
|
11 |
13038 |
DDN |
HWH |
AMG-LKO-UTR |
AMG-TPNR N/L-UTR |
24/06/26 to 13/09/26 |
82 |
|
12 |
13036 |
DDN |
HWH |
AMG-LKO-UTR |
AMG-TPNR N/L-UTR |
||
|
13 |
13257 |
DNR |
ANVT |
AMG-LKO-UTR |
AMG-TPNR N/L-UTR |
24/06/26 to 13/09/26 |
82 |
|
14 |
13258 |
ANVT |
DNR |
AMG-LKO-UTR |
AMG-TPNR N/L-UTR |
24/06/26 to 13/09/26 |
82 |
|
15 |
14523 |
BJU |
UMB |
UTR-LKO-AMG |
UTR-TPNR(N/L)-AMG |
JUNE-25,29 |
23 |
|
16 |
14524 |
UMB |
BJU |
AMG-LKO-UTR |
AMG-TPNR N/L-UTR |
JUNE-27,30 |
23 |
|
17 |
15127 |
BNRS |
NDLS |
UTR-LKO-AMG |
UTR-TPNR(N/L)-AMG |
24/06/26 to 13/09/26 |
82 |
|
18 |
15128 |
NDLS |
BNRS |
AMG-LKO-UTR |
AMG-TPNR N/L-UTR |
24/06/26 to 13/09/26 |
82 |
|
19 |
15119 |
BNRS |
DDN |
UTR-LKO-AMG |
UTR-TPNR(N/L)-AMG |
24/06/26 to 13/09/26 |
82 |
|
20 |
15120 |
DDN |
BNRS |
AMG-LKO-UTR |
AMG-TPNR N/L-UTR |
24/06/26 to 13/09/26 |
82 |
|
21 |
14229 |
PYGS |
YNRK |
UTR-LKO-AMG |
UTR-TPNR(N/L)-AMG |
JUNE-25,28,30 |
35 |
|
22 |
14230 |
YNRK |
PYGS |
AMG-LKO-UTR |
AMG-TPNR N/L-UTR |
JUNE-24,26,29 |
35 |
|
23 |
19054 |
MFP |
ST |
BBK-LKO-MKG |
BBK-ML-ASH-CNB |
JUNE-28 |
12 |
|
24 |
15636 |
GHY |
OKHA |
BBK-LKO-CNB |
BBK-ML-ASH-CNB |
JUNE-29 |
11 |
|
25 |
15635 |
OKHA |
GHY |
CNB-LKO-BBK |
CNB-ASH-ML-BBK |
JUNE-26 |
12 |
|
26 |
15668 |
KYQ |
GIMB |
BBK-LKO-CNB |
BBK-ML-ASH-CNB |
JUNE-24 |
12 |
|
27 |
15667 |
GIMB |
KYQ |
CNB-LKO-BBK |
CNB-ASH-ML-BBK |
JUNE-27 |
12 |
3). Repercussions of PF 1=MR-1 from 28.06.26 to 10.07.26.
Diversion of Trains:-
|
S. |
Train No. |
From |
To |
Proper route |
Diverted Route |
JCO |
Trips |
Stoppage skipped & Count |
Stoppage will be Provided on diverted route |
|
1 |
09451 |
GIMB |
BGP |
MKG-LKO-ML |
MKG-ASH-ML |
JUNE-26 |
3 |
LKO=1 |
ASH, BNZ |
|
2 |
09452 |
BGP |
GIMB |
ML-LKO-MKG |
ML-ASH-MKG |
JUNE-29 |
2 |
LKO=1 |
ASH, BNZ |
|
3 |
11080 |
GKP |
LTT |
ML-LKO-MKG |
ML-ASH-MKG |
JUNE-27 |
2 |
LKO=1 |
ASH, BNZ |
|
4 |
19168 |
BCY |
ADI |
ML-LKO-MKG |
ML-ASH-MKG |
JUNE-25,26,28,30 |
10 |
LKO=1 |
ASH, BNZ |
|
5 |
19166 |
DBG |
ADI |
ML-LKO-MKG |
ML-ASH-MKG |
JUNE-24,27,29 |
8 |
LKO=1 |
ASH, BNZ |
|
6 |
11123 |
GWL |
BJU |
MKG-LKO-ML |
MKG-ASH-ML |
24/06/26 TO 10/07/26 |
17 |
LKO=1 |
ASH, BNZ |
|
7 |
11124 |
BJU |
GWL |
ML-LKO-MKG |
ML-ASH-MKG |
23/06/26 TO 10/07/26 |
83 |
LKO=1 |
ASH, BNZ |
|
8 |
12356 |
JAT |
PNBE |
AMG-LKO-UTR |
AMG-TPNR-UTR |
JUNE-24,28 |
5 |
LKO=1 |
AMG, UTR |
|
9 |
13430 |
ANVT |
MLDT |
AMG-LKO-UTR |
AMG-TPNR-UTR |
JUNE-27 |
3 |
LKO=1 |
AMG, UTR |
|
10 |
14612 |
SVDK |
GCT |
AMG-LKO-UTR |
AMG-TPNR-UTR |
JUNE-25 |
3 |
LKO=1 |
AMG, UTR |
|
11 |
20940 |
SLN |
SBIB |
UTR-LKO-AMG |
UTR-TPNR-AMG |
JUNE-24 |
3 |
LKO=1 |
UTR, AMG |
|
12 |
20964 |
BSB |
SBIB |
UTR-LKO-AMG |
UTR-TPNR-AMG |
JUNE-27 |
3 |
LKO=1 |
UTR, AMG |
Platform shifting from PF-1 to other platform and from PF- 6 & 4 to PF- 2, 3 & 7 from 28.06.26 to 10.07.26. Attached as Annx-4 Pages-02.
4) . T/P Block of L no.-4 (PF-4) & L no.5 (PF-5) (Complete block) and partial block of PF-3, PF-2, PF-6, PF-7 & MR-2 of 06 hrs. (11:00-17:00) (11.07.26 TO 13.09.26):-
Diversion of trains:-
|
S. |
Train No. |
From |
To |
Proper route |
Diverted Route |
JCO |
Trip |
Stoppage skipped & Count |
Stoppage will be Provided on diverted route |
|
1 |
12355 |
PNBE |
JAT |
UTR-LKO-AMG |
UTR-TPNR(N/L)-AMG |
JULY-11,14,18,21,25, 28 |
19 |
LKO=1 |
UTR, AMG |
|
2 |
14611 |
GCT |
SVDK |
UTR-LKO-AMG |
UTR-TPNR(N/L)-AMG |
JULY-17,24,31 |
9 |
LKO=1 |
UTR, AMG |
|
3 |
11080 |
GKP |
LTT |
BBK-LKO-CNB |
BBK-ML-ASH-MKG |
JULY-11,18,25 |
10 |
LKO=1 |
ASH, BNZ |
|
4 |
12571 |
GKP |
ANVT |
BBK-LKO-MKG |
BBK-ML-ASH-MKG |
JULY-10,11,12,15,17,18, 19,22,24,25,26,29,31, |
39 |
LKO=1 |
BNZ, ASH |
|
5 |
12555 |
GKP |
BTI |
BBK-LKO-MKG |
BBK-ML-ASH-MKG |
11/07/26 to 13/09/26 |
65 |
LKO=1 |
BNZ, ASH |
|
6 |
19410 |
GKP |
SBIB |
BBK-LKO-MKG |
BBK-ML-ASH-MKG |
JULY-11,13,18,20,25, 27 |
19 |
LKO=1 |
BNZ, ASH |
|
7 |
22922 |
GKP |
BDTS |
BBK-LKO-MKG |
BBK-ML-ASH-MKG |
JULY-14,21,28 |
9 |
LKO=1 |
BNZ, ASH |
|
8 |
12595 |
GKP |
ANVT |
BBK-LKO-MKG |
BBK-ML-ASH-MKG |
JULY-13,14,16,20, 21,23,27,28,30 |
27 |
LKO=1 |
BNZ, ASH |
|
9 |
12597 |
GKP |
CSMT |
BBK-LKO-MKG |
BBK-ML-ASH-MKG |
JULY-14,21,28 |
9 |
LKO=1 |
BNZ, ASH |
|
10 |
15065 |
GKP |
PNVL |
BBK-LKO-MKG |
BBK-ML-ASH-MKG |
JULY-12,13,14,16,17,19, 20,21,23,24,26,27,28,30, 31 |
46 |
LKO=1 |
BNZ, ASH |
|
11 |
15067 |
GKP |
BDTS |
BBK-LKO-MKG |
BBK-ML-ASH-MKG |
JULY-15,22,29 |
9 |
LKO=1 |
BNZ, ASH |
|
12 |
19053 |
ST |
MFP |
CNB-LKO-BBK |
CNB-ASH-ML-BBK |
JULY-10,17,24,31 |
10 |
LKO=1 |
ASH, BNZ |
|
13 |
11079 |
LTT |
GKP |
CNB-LKO-BBK |
CNB-ASH-ML-BBK |
JULY-16,23,30 |
9 |
LKO=1 |
ASH, BNZ |
|
14 |
15066 |
PNVL |
GKP |
CNB-LKO-BBK |
CNB-ASH-ML-BBK |
JULY-10,11,13,14,15,17, 18,20,21,22,24,25,27,28, 29, 31 |
47 |
LKO=1 |
ASH, BNZ |
|
15 |
19201 |
BVC |
AYC |
CNB-LKO-BBK |
CNB-ASH-ML-BBK |
JULY-13,20,27 |
9 |
LKO=1 |
ASH, BNZ |
|
16 |
15030 |
PUNE |
GKP |
CNB-LKO-BBK |
CNB-ASH-ML-BBK |
JULY-11,18,25 |
10 |
LKO=1 |
ASH, BNZ |
|
17 |
19409 |
SBIB |
GKP |
MKG-LKO-ML |
MKG-ASH-ML |
JULY-11,16,18,23, 25,30 |
19 |
LKO=1 |
ASH,BNZ |
|
18 |
12173 |
LTT |
MBDP |
CNB-LKO-RBL-MBDP |
CNB-PRYJ-PFM-MBDP |
JULY-12,14,19,21,26,28 |
18 |
LKO, RBL, AME=3 |
PRYJ |
|
19 |
15270 |
SBIB |
MFP |
CNB-LKO-BBK |
CNB-ASH-ML-BBK |
JULY-11,18,25 |
10 |
LKO=1 |
ASH, BNZ |
|
20 |
13065 |
HWH |
ANVT |
UTR-LKO-AMG |
UTR-TPNR(N/L)-AMG |
JULY-16,23,30 |
9 |
LKO=1 |
UTR, AMG |
Platform shifting from PF-4 to other platform, PF-5 to other platform, PF-2 & 3 to other platform and from PF- 6 & 7 to other platforms from 11.07.26 TO 13.09.26. Attached as Annx-5 Page-01.
Note: - At AMG, ASH and PRYJ 10 minute stoppage will be provided for crew changing, UTR, BNZ stoppage of 5 minutes will be provided.
For update, kindly visit NTES or dial 139.
-----