Annual Performance Agreement (MOU) Target forApril-2026
SN
Key Performance Indicators
Unit of Measurement
Target
Performance for the month
Performance upto the month
2.
Capacity Enhancement
(r) Facility for freight train examination (Train examination lines to be provided with welding, lighting & pucca pathway facility)
Nos.
Not received
0
3.
Capacity Utilization
(d)
iii)Terminal detention (from arrival to departure) Examination: % improvement in rake examination time
%
Hours/minutes
3.88%
(Deterioration)
1v87
minutes
(Improvement)
187
4.
Production of Wagons
No. of wagons/ month
55
(HQ tgt)
58
(a) POH Outturn of Coaches
No. of coaches/month
242.33
264
(b) POH Outturn of Wagons
No. of wagons / month
420
390**
390
(c) POH outturn of Elect. Locomotives
No. of Loco / year
20
(POH)
3
(POH-2,
IOH-1)
(d) POH outturn of MEMU/EMU
Yearly
530
29
(16@CB+13GZB)
(16CB+13GZB)
POH Outturn of DEMU
276
19@@
19
POH outturn of SPART/SPARMV
27
POH outturn of Tower Car (4W+8W)**
64
1
6.
Asset Reliability (Average increase in asset reliability/ improvement over last year)
(d)Coach Detachment (ownership basis)
(e)Wagon Detachment (Territorial basis)
0.00011
(h) C&W others failures (Territorial basis)
Nos
135
7.
Improvement in Safety performance
(d) Hot axles (ownership basis)
Failures/1000 wagon outturn
(g) Fire cases (on ownership basis in RS & installations directly connected with train operations)