| Mechanical Workshop, Amritsar |
|
History • 1956-1986: Steam Loco POH • 1961: Wagon Manufacturing started • 1998: ICF Bogie Frame Manufacturing for RCF • 2001: ISO 9000 certification • 2004: POH of Self-Propelled ART/ARME • 2005: Manufacturing of BVZI wagons • 2008: Manufacturing of BOXNHL wagons • 2009: Manufacturing of Air Suspension Bogies • 2015: Manufacturing of BVCM wagons started. • 2015: IMS certification (ISO:9001-2015, ISO:14001-2015 & OHSAS:18001-2007). • 2016: IOH of Non-AC ICF Bogies started. • 2016: Certification of Energy Management System (ISO: 50001-2011). • 2016: Fabrication of CBC type, TC and DMC Headstocks for RCF/KXH. • 2017: 5’S Methodology adopted. • 2018: Certification of ISO 3834-2 Welding Quality Management system. • 2019: Green Co SILVER Rating for Workshop. • 2019: Integrated 06 management systems into IMS. • 2019: 1500th BOXNHL BMBS Wagon Manufactured. • 2019: Highest ever Monthly outturn of 45 wagons achieved in Nov-19. • 2019-20: 457 Nos - Highest Ever figure of Wagon production achieved. • 2021-22: LHB Bogie frame manufacture successfully done. • 2022: IGBC “Platinum rating” for Admin Building of Workshop. • 2022: Highest ever Monthly outturn of 63 wagons achieved in Dec-22. • 2022: BRN Wagon production started. • 2022-23: 562 Nos - Highest Ever figure of Wagon production achieved. • 2023: Green Co GOLD Rating for Workshop. • 2023: BOXNHL with UMBS design dispatched from ASRW. • 2024: Highest ever Monthly outturn of 75 wagons achieved in Feb-24. • 2023-24: 601 Nos - Highest Ever figure of Wagon production achieved. • 2024-25: 611 Nos - Highest Ever figure of Wagon production achieved.
इतिहास
Library
पुस्तकालय
|

Accessibility Controls