Key targets/Objectives


Key targets/Objectives

 

Main works of Electrical General/Power Department in February-2025

 

SN

Description

1.

This month 1,20,239 solar units were produced from various solar plants of the division.

2.

This month, a 13 kW associated plant was commissioned at the Athal station of the division. About 17,082 units were generated from this plant, which will result in saving of about Rs 1,28,000.

3.

This month, a 16 kW solar plant was commissioned at the division's Pathri station. This plant will produce approximately 21,024 units per year, resulting in savings of approximately Rs 1,57,600.

4.

New electrical connection started at CBJ Track Depot.

5.

Faulty tube lights and street lights of Pitambarpur, Bareilly Cantt and Bilpur stations in Bareilly Junction were replaced/repaired

6.

Service work of DG set of Harthala, Rampur, RRI Moradabad substation was done.

7.

Faulty PCBC points of BE station line no. 03 were repaired.

8.

Bareilly Junction old and new washing line No. 29. Faulty pit light repaired.

9.

Under ABSS Work at CH station, 15 Nos. of new Octagonal Poles were installed on PF No.01 MB Side and old poles were removed.

10.

New Wall Mounted Fans were installed at LC Gates No.19C, 75C, 40C and 58B due to low ceilings.

11.

Testing and cleaning work of all earth pits of Chandausi station and ZRTI CH was done by electrical staff.

12.

For UPS system at Bijnor station, 03 nos. of new 12V 65Ah batteries were installed in place of old 12V 42Ah batteries.

13.

New fan no. 01 was installed in the kitchen of Najibabad running room.

 

 Timely finalization of tenders except stores tenders (including service & works Tender)

Month

Other than Store Department

Direct acceptance(DA)cases

Tender Committee(TC)cases

Total No. of case finalized

Finalized within 45 days

Total No. of case finalized

Finalized within 60days

Feb’25

Tender

Cases Finalized

IREPS

00

0

1

1

GEM

1

0

0

0

Total

1

0

1

1

 

 
     
                  Total No.of Service contract and outcome based Service Contract finalized in 2024-25

 

Month

Total no’s. Of outcomes based service contract

finalized

Total nos. of service contracts finalized

Total Value of outcome Based Service Contract

 

Apr’ 25

1

1

949970/-

 
 
 
  Reduction in expenditure in service contracts finalized

 

Month

Expenditure in service contracts finalized Current

year

Expenditure in service contracts finalized last year

Percentage Reduction in expenditure in

Service contract

a.

b.

(b-a)x100/b

Apr’ 25

0

288330/-

100%

 
     
     4.0              Deletion of works from IRPSM

 

Month

Total works deleted in FY 2024-25

Total works on opening day of FY(as on 01.04.24)

Deletion of works from IRPSM

a.

b.

a/b

Feb’ 25

0

27

0

 