Staff Strength
 

Staff

SSE

JE

WM

SBA

Fitter (Power)

Fitter (CHG)

Vehicle Dr.

TLF

ACF

Asstt TL AC

Asstt Pow

Ministerial

Total

SS

36

23

107

41

25

16

2

170

136

169

151

31

907

OR

33

22

103

39

25

14

1

165

133

63

93

27

718

Vac

1

1

4

2

0

2

1

05

03

106

58

4

189

 

 

POWER SUPPLY STATS

 

1.

Nos. of electrified stations (SEB)

=

135

2.

NSG-2

=

02 (CDG, UMB)

3

NSG-3

=

4 (SRE, KLK, BTI,YJUD)

4.

NSG-4

=

6 (RPJ, SIR, PTA, ABS, UHL, AADR)

5

NSG-5

=

22

6

NSG-6

=

76

7.

Nos. of stations provided with 100%LED lights

=

135

8.

Nos. of Escalators

=

Total = 10 Nos.

4 (CDG), 2 (UMB), 2 (SRE), 2 (BTI)

9

Nos. of Lifts

=

Total = 30 Nos.

12 (CDG), 4(UMB), 3(SRE), 2 (BTI),

3 (SASN)

1 (Divisional Hospital UMB)

1 (DRM Office)

10

Total connected load

=

43970   KW

11

Average monthly consumption

=

38 Lacs units

12.

Avg. Monthly Electricity Bill

=

Rs.315   Lacs

13

Monthly Recovery from Qrs and outsiders

=

-

14.

Nos. of electrified quarters

=

12114

15

Nos. of stations provided with 10 KWp solar power system

=

09   (SFM, MET, RPHR, LHM, TPA, BTIC, PJK, NBA, PUL, CNDM, SAG)

16.

Nos. of stations provided with 3 KWp solar power system

 

18 Nos. (KLK-SML section)

17.

Roof Top Solar Power Plant

(On-grid) Commissioned

=

Total 3.056 MWp

·DRM Office 115KWp,

·UMB 540KWp,

·DKT 45KWp,

·PTA 75KWp,

·BTI 216KWp,

·CDG 330KWp,

·ABS 50KWp,

·SML 160KWp

·UBC 70KWp,

·SRE 485KWp,

·Loco Shed/KJGY 540KWp

·YJUD 80KWp

·LLU 40 KWp

·DHPR 40 KWp

·KLSX 20 KWp

·CTW 10 KWp

·AHH 45 KWp

·SEQ 38 KWp

·DOC 15 KWp

·RPJ 100 KWp

 BCU 42 KWp

18

Nos. of manned L-xing Gates

=

311

19

Nos. of Manned L-xing Gates Electrified

=

311

20

Nos. of water coolers

=

173

(a)

For passenger Amenity

=

95

(b)

For staff Amenity

=

80

21

Nos. of Air Conditioners

   

(a)

Window type

=

518

(b)

Split type

=

324

(c)

Package type

=

17x3 (AC Plant)+ 11x3 (AC plant)  (DRM office)

 

(d)

VRF type

=

10 ton x 2

22

Nos. of Refrigerator

=

32

23

Nos. of DG sets (3 phase) Installed

=

68

24

Nos. of DG sets with AMF panels

=

57

25

Nos. of sub. Station

=

44

26

Nos. of HT Connection

=

22

27

Nos. of LT Connection

=

397

28

Nos. of HT Panel

=

44

29

Nos. of LT Panel

=

206

30

Nos. of Transformer Installed

=

88

31

Total Capacity of Installed Transformers

=

49550   KVA

32

Intensity of utilization (KWH/KW/Month)

=

80.27

33

Nos. of ATs

=

197

34

Length of HT overhead network

=

-

35

Length of LT overhead network

=

-

36

Cable length (HT)

=

-

37

Cable length (LT)

=

-

38

Nos. of Pumps

 

217

a)

Submersible

=

210

b)

Horizontal shaft

=

7 (Kaushalaya bed at Kalka)

39

Pump Automation

   

a)

With GSM

=

50

b)

With timer

=

2

d)

ASM Control

=

154

40

Nos. of Tower

=

99 Nos.

41

Nos. of Lights on Tower

=

297   Nos.

42

Nos. of washing line

=

2376   Nos.

43

Nos. of Running room

 

7(SRE,UMB,DUI,BTI,CDG,NLDM,SML)

44

Nos. of RRI building

 

5(SRE,UMB,BTI,CDG,DUI)

 