|
1.
|
Nos. of electrified stations (SEB)
|
=
|
135
|
|
2.
|
NSG-2
|
=
|
02 (CDG, UMB)
|
|
3
|
NSG-3
|
=
|
4 (SRE, KLK, BTI,YJUD)
|
|
4.
|
NSG-4
|
=
|
6 (RPJ, SIR, PTA, ABS, UHL, AADR)
|
|
5
|
NSG-5
|
=
|
22
|
|
6
|
NSG-6
|
=
|
76
|
|
7.
|
Nos. of stations provided with 100%LED lights
|
=
|
135
|
|
8.
|
Nos. of Escalators
|
=
|
Total = 10 Nos.
4 (CDG), 2 (UMB), 2 (SRE), 2 (BTI)
|
|
9
|
Nos. of Lifts
|
=
|
Total = 30 Nos.
12 (CDG), 4(UMB), 3(SRE), 2 (BTI),
3 (SASN)
1 (Divisional Hospital UMB)
1 (DRM Office)
|
|
10
|
Total connected load
|
=
|
43970 KW
|
|
11
|
Average monthly consumption
|
=
|
|
|
12.
|
Avg. Monthly Electricity Bill
|
=
|
Rs.315 Lacs
|
|
13
|
Monthly Recovery from Qrs and outsiders
|
=
|
-
|
|
14.
|
Nos. of electrified quarters
|
=
|
12114
|
|
15
|
Nos. of stations provided with 10 KWp solar power system
|
=
|
09 (SFM, MET, RPHR, LHM, TPA, BTIC, PJK, NBA, PUL, CNDM, SAG)
|
|
16.
|
Nos. of stations provided with 3 KWp solar power system
|
|
18 Nos. (KLK-SML section)
|
|
17.
|
Roof Top Solar Power Plant
(On-grid) Commissioned
|
=
|
Total 3.056 MWp
·DRM Office 115KWp,
·UMB 540KWp,
·DKT 45KWp,
·PTA 75KWp,
·BTI 216KWp,
·CDG 330KWp,
·ABS 50KWp,
·SML 160KWp
·UBC 70KWp,
·SRE 485KWp,
·Loco Shed/KJGY 540KWp
·YJUD 80KWp
·LLU 40 KWp
·DHPR 40 KWp
·KLSX 20 KWp
·CTW 10 KWp
·AHH 45 KWp
·SEQ 38 KWp
·DOC 15 KWp
·RPJ 100 KWp
BCU 42 KWp
|
|
18
|
Nos. of manned L-xing Gates
|
=
|
311
|
|
19
|
Nos. of Manned L-xing Gates Electrified
|
=
|
311
|
|
20
|
Nos. of water coolers
|
=
|
173
|
|
(a)
|
For passenger Amenity
|
=
|
95
|
|
(b)
|
For staff Amenity
|
=
|
80
|
|
21
|
Nos. of Air Conditioners
|
|
|
|
(a)
|
Window type
|
=
|
518
|
|
(b)
|
Split type
|
=
|
324
|
|
(c)
|
Package type
|
=
|
17x3 (AC Plant)+ 11x3 (AC plant) (DRM office)
|
| |
(d)
|
VRF type
|
=
|
10 ton x 2
|
|
22
|
Nos. of Refrigerator
|
=
|
32
|
|
23
|
Nos. of DG sets (3 phase) Installed
|
=
|
68
|
|
24
|
Nos. of DG sets with AMF panels
|
=
|
57
|
|
25
|
Nos. of sub. Station
|
=
|
44
|
|
26
|
Nos. of HT Connection
|
=
|
22
|
|
27
|
Nos. of LT Connection
|
=
|
397
|
|
28
|
Nos. of HT Panel
|
=
|
44
|
|
29
|
Nos. of LT Panel
|
=
|
206
|
|
30
|
Nos. of Transformer Installed
|
=
|
88
|
|
31
|
Total Capacity of Installed Transformers
|
=
|
49550 KVA
|
|
32
|
Intensity of utilization (KWH/KW/Month)
|
=
|
80.27
|
|
33
|
Nos. of ATs
|
=
|
197
|
|
34
|
Length of HT overhead network
|
=
|
-
|
|
35
|
Length of LT overhead network
|
=
|
-
|
|
36
|
Cable length (HT)
|
=
|
-
|
|
37
|
Cable length (LT)
|
=
|
-
|
|
38
|
Nos. of Pumps
|
|
217
|
|
a)
|
Submersible
|
=
|
210
|
|
b)
|
Horizontal shaft
|
=
|
7 (Kaushalaya bed at Kalka)
|
|
39
|
Pump Automation
|
|
|
|
a)
|
With GSM
|
=
|
50
|
|
b)
|
With timer
|
=
|
2
|
|
d)
|
ASM Control
|
=
|
154
|
|
40
|
Nos. of Tower
|
=
|
99 Nos.
|
|
41
|
Nos. of Lights on Tower
|
=
|
297 Nos.
|
|
42
|
Nos. of washing line
|
=
|
2376 Nos.
|
|
43
|
Nos. of Running room
|
|
7(SRE,UMB,DUI,BTI,CDG,NLDM,SML)
|
|
44
|
Nos. of RRI building
|
|
5(SRE,UMB,BTI,CDG,DUI)
|