20.08.2026
| Staff Strength | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Desgn. | SS/TI/ CYM | CHC/ SCNL | WMI | TRAIN MANAGER | SHTG. MAS | CABIN MAN | POINTS MAN | TRAINS CLERKS | MIN. STAFF |
| SS | 668 | 40 | 5 | 542 | 87 | 24 | 1116 | 123 | 56 |
| OR | 552 | 30 | 5 | 445 | 32 | 13 | 924 | 121 | 55 |
| Vac | 116 | 10 | 0 | 97 | 55 | 11 | 192 | 2 | 1 |
| Assets | ||
|---|---|---|
| 1. | Total no. of Block Stations | = 116 |
| i. | Panel/RR I Stations with std-III | = 4 |
| ii. | Panel stations with Std-II | = 34 |
| iii. | Electronic Inrerlocking with std-II ( Single VDU) & Make of EI | = 19 |
| iv. | Electronic Inrerlocking with std-II ( Double VDU) & Make of EI | = 18 |
| v. | Electronic Inrerlocking with std-III ( Single VDU) & Make of EI | = 01 |
| vi. | Electronic Inrerlocking with std-III ( Double VDU) & Make of EI | = 22 |
| vii. | Std-I station | = 01 |
| viii. | Ends cabin stations with STD-II | = 00 |
| ix | Rudimentary Stations with semaphore signalling | 17 |
| 2. | Goods Shed Terminals | = 37 |
| i. | Full Rakes Sidings | = 34 |
| ii. | Half Rakes Sidings | = 3 |
| 3. | Private Sidings | = 28 |
| i. | Thermal Plant Sidings | = 5 |
| ii. | Cement Plant Sidings | = 5 |
| iii. | FCI sidings | = 2 |
| iv. | Paper Mill Sidings | = 1 |
| v. | Ammunition Depot Sidings | = 2 |
| vi. | NFL Sidings | = 2 |
| vii. | Private Freight Terminal | = 5 |
| viii. | Container Siding | = 1 |
| ix. | LPG/Petroleum sidings | = 1 |
| x. | Chemical Siding | = 1 |
| xi. | Silo Siding | = 3 |

Accessibility Controls