INFRA STRUCTURAL OVERVIEW

 

·Electrified RKM- 1533.89.

·Electrified TKM- 3668.600 (100% electrification of division completed).

·18 OHE depots.

·6 PSI depots.

·1 Remote Control Centre.

·1 Workshop-cum-store.

·20 nos. traction sub stations (TSSs), 32 sectioning posts (SPs), 81 nos. sub sectioning posts (SSPs) and 19 nos. isolators gantries.

 KEY TARGETS/OBJECTIVES

 

Maintenance Targets: -

 

·IOH of OHE-2051 TKM

·POH of ATD- 495 nos.

·AOH of ATD-6145 nos.

·Checking of T/O & Cross Overs-3004 nos.

·Annual schedule of Isolators-1345 nos.

·Annual schedule of section insulator- 1717 nos.

·Annual schedule of Switching stations- 144 nos.

·Relay Testing-20 nos. TSS.

·Checking of PTFE- 400 nos.

 

2.Special Works Targets to improve the reliability of OHE system: -

 

·Replacement of overaged and weak catenary wire- 100 Kms.

·Replacement of silver brazed contact wire- 100 Kms.

·Replacement of corroded cantilever assemblies- 3000 nos.

·Replacement of corroded steel anti- creep wires- 57 nos.

·Provision of pipes in drop arm of portal as anti-bird measures- 250 nos.

·Provision of monkey scare measures at portals & designated location like girder bridges etc.- 750 nos.

·Provision of circular discs on cantilever assemblies as anti-bird measures in identified birding area- 400 nos.

·Provision of packing saddle (RI-1174) in catenary suspension clamp - 14908 nos.

·Provision of parallel contact wire over RRA clamps- 266 nos.

·Replacement of 105 sqmm jumpers with 160 sqmm jumpers on isolators- 840 nos. 

 

 INFRA STRUCTURAL OVERVIEW

 

·Electrified RKM- 1508.

·Electrified TKM- 3558 (100% electrification of division completed).

·18 OHE depots.

·6 PSI depots.

·1 Remote Control Centre.

·1 Workshop-cum-store.

·20 nos. traction sub stations (TSSs), 32 sectioning posts (SPs), 81 nos. sub sectioning posts (SSPs) and 19 nos. isolators gantries.

 

STAFF STRENGTH

 

·Sanctioning strength- 982 posts.

·On Roll Staff- 913 posts.

·Vacancy- 69 posts.