| Key Targets/Objectives |
|
INFRA STRUCTURAL OVERVIEW
·Electrified RKM- 1533.89. ·Electrified TKM- 3668.600 (100% electrification of division completed). ·18 OHE depots. ·6 PSI depots. ·1 Remote Control Centre. ·1 Workshop-cum-store. ·20 nos. traction sub stations (TSSs), 32 sectioning posts (SPs), 81 nos. sub sectioning posts (SSPs) and 19 nos. isolators gantries. KEY TARGETS/OBJECTIVES
Maintenance Targets: -
·IOH of OHE-2051 TKM ·POH of ATD- 495 nos. ·AOH of ATD-6145 nos. ·Checking of T/O & Cross Overs-3004 nos. ·Annual schedule of Isolators-1345 nos. ·Annual schedule of section insulator- 1717 nos. ·Annual schedule of Switching stations- 144 nos. ·Relay Testing-20 nos. TSS. ·Checking of PTFE- 400 nos.
2.Special Works Targets to improve the reliability of OHE system: -
·Replacement of overaged and weak catenary wire- 100 Kms. ·Replacement of silver brazed contact wire- 100 Kms. ·Replacement of corroded cantilever assemblies- 3000 nos. ·Replacement of corroded steel anti- creep wires- 57 nos. ·Provision of pipes in drop arm of portal as anti-bird measures- 250 nos. ·Provision of monkey scare measures at portals & designated location like girder bridges etc.- 750 nos. ·Provision of circular discs on cantilever assemblies as anti-bird measures in identified birding area- 400 nos. ·Provision of packing saddle (RI-1174) in catenary suspension clamp - 14908 nos. ·Provision of parallel contact wire over RRA clamps- 266 nos. ·Replacement of 105 sqmm jumpers with 160 sqmm jumpers on isolators- 840 nos.
INFRA STRUCTURAL OVERVIEW
·Electrified RKM- 1508. ·Electrified TKM- 3558 (100% electrification of division completed). ·18 OHE depots. ·6 PSI depots. ·1 Remote Control Centre. ·1 Workshop-cum-store. ·20 nos. traction sub stations (TSSs), 32 sectioning posts (SPs), 81 nos. sub sectioning posts (SSPs) and 19 nos. isolators gantries.
STAFF STRENGTH
·Sanctioning strength- 982 posts. ·On Roll Staff- 913 posts. ·Vacancy- 69 posts. |