Group
Route km
Total track km
A
-
B
288.2
753.0
C
D
164.7
338.3
E
1222.4
1532.5
NG
165.8
180.2
Total
1841.1
2804
Level crossing gate:
S.No.
Class
No. of LCs
1
Special
127
2
‘A’ Class
57
3
‘B’ Class
85
4
‘C’ manned
510
779
Bridges:
No. of Bridges
Important
29
Major
477
Minor
5120
RUB
168
5
LHS
180
6
ROB
135
7
FOB
90
6199
Curves:
Sr. No.
Total No. of curves
Total track Km on curves
Proportion of curved track
881
402.9
14.43%
Staff Strength:
S. No.
Category of Staff
Present
Sanctioned
Strength
Manpower
on Roll
Vacancy w.r.t.
% Vacancy
P. Way staff
SSE/ JE/ P.Way
214
197
17
8%
Track Maintainer
5956
(7012 MCNTM)
3875
2081
35%
Blacksmith (P.Way)
59
48
11
17%
Welder (P.Way)
54
49
9 %
Carpenter (P.Way)
10
50%
Painter (P.Way)
8
63%
Helper (P.Way)
108
40
68
Total of P. Way Staff
6409
4217
2192
34%
Works staff
SSE (Works)
50
JE (Works)
27
15
12
Welder (Works)
0
Blacksmith (Works)
22
14
Mason (Works)
25
Painter (Works)
18
Carpenter (Works)
36
28
Plumber (Works)
21
9
Helper (Works) / Khalasi
340
290
Sub Total of Works staff
568
451
117
Design and Drawing staff and Others
SSE (Drawing & Design)
JE (Drawing & Design)
Engineering Store Chowkidar
78
38
Sub Total
93
53
7070
4721
2349