Electrical General


1.0 Introduction

Electrical General Services of Delhi Division works under the guidance & leadership of Senior Divisional Electrical Engineer General. He is mainly responsible for operation & maintenance of   power supply, air conditioning assets, lift/escalator   & water supply arrangements for the entire division   i. e. at stations, service buildings, hospitals & railway colonies etc. Budget management, Planning of new electrical works for passenger & staff amenities, energy conservation works, liaising with   DISCOMS & other civil authorities. He is also cadre controller for Electrical staff

Sr. DEE/G is assisted by Divisional Electrical Engineer/G, Divisional Electrical Engineer/Spl, Assistant Divisional Electrical Engineer/G & Assistant Divisional Electrical Engineer /G-I & II. To maintain the electrical assets, the work is further sub-divided in to 29 Depots(22 Power Supply, 4 Air-conditioning depots, SSE/Spl /A. Gate, SSE L&E/NDLS & SSE-OE&P/SSB) headed by Senior Section Engineers. There are 76 supervisors, 45 ministerial, 1006 artisan staff.

The power supply is taken from DISCOMs of Delhi, Haryana, Punjab and Uttar Pradesh States. 11 KV HT power supply has been availed at 95 locations and 440/230 voltage supply has been availed at 659 locations over Delhi Division.The average monthly electric consumption is 10.65 Million units and Rs. 10.08 Crore is paid toward electricity bill.

Presently Delhi Division is maintaining around 229 electrified stations, 593 no. electrified manned level crossing gates, 314 nos. High Mast towers, 169 nos. solar panels, 316 no Solar geysers, 103 no. 11/.44 KV HT sub stations, 85 nos Diesel Generating Sets, 112 nos. Lifts and 43 Escalators, 26nos. Centralized air-conditioning plants, 1611 nos. Window/Split/ Package AC units, 452 nos. 150 LPH Water coolers. Maintenance work at 20078 no. staff quarters is also done. In addition to above maintenance work of important buildings such as Rail Bhawan, Northern Railway HQ office, Baroda House, Divisional Railway Managers Office, New Delhi & Railway Board Member’s flats etc. are also untaken by Electrical General Services.


2.0 Salient Features


S. NO.

ITEM

NOS.

1

STATIONS

TOTAL NO. OF STATIONS/HALTS

233

NO. OF ELECTRIFIED STATION/HALTS

229

2

POWER SUPPLY

NO. OF HT CONNECTIONS

95

NO. OF LT CONNECTIONS

659

TOTAL CONNECTED LOAD IN KW

102462

AVG. CONSUMPTION PER MONTH IN MU

10.65

AVG. AMOUNT PER MONTH IN CRORE (RS.)

10.08

3

SUB STATIONS

NO. OF HT SUB STATIONS

103

NO. OF TRANSFORMERS

203

4

GENERATING SETS

NO. OF STATIONARY & MOBILE DIESEL GENERATING SETS

85

NO OF PORTABLE HONDA SETS

144

5

SOLAR SYSTEMS

NO OF STATIONS WITH SOLAR PANELS

12

TOTAL CAPACITY OF SOLAR PANELS AT STATIONS

5321 KWp

NO OF SERVICE BUILDINGS & SCHOOLS WITH SOLAR PANELS

09

TOTAL CAPACITY OF SOLAR PANELS AT SERVICE BUILDINGS

210 KWp

NO OF L-XING GATES WITH SOLAR PANELS

103

TOTAL CAPACITY OF SOLAR PANELS AT L-XING GATES

34.22 KWp

TOTAL NO OF SOLAR STREET LIGHTS PROVIDED AT COLONIES, STATIONS   & RUNNING ROOMS

168

TOTAL CAPACITY OF SOLAR STREET LIGHTS

12.43 KWp

6

SOLAR GEYSERS

TOTAL NO OF SOLAR GEYSERS PROVIDED IN STAFF QTRS (100 LPD)

316

TOTAL CAPACITY OF SOLAR GEYSERS PROVIDED IN STAFF QTRS

31600 LPD

TOTAL NO OF HIGHER CAPACITY SOLAR GEYSERS

29

TOTAL CAPACITY OF HIGHER CAPACITY SOLAR GEYSERS (500-2500 LPD)

38800 LPD

7

PUMPING PLANTS

NO. OF PUMPS IN BORES

357

NO. OF PUMPS IN UNDER GROUND TANKS

254

8

WATER COOLERS

NO. OF STATIONS PROVIDED WITH WATER COOLERS

76

NO. OF 150 LTRS. WATER COOLERS

293

9

AIR CONDITIONERS

NO OF WINDOW AC

797

NO OF SPLIT/ PACKAGE ACS

814

NO. OF CENTRALISED AC PLANTS

26

10

LIFT AND ESCALATORS

NO. OF PASSENGER LIFTS

112

NO. OF GOODS LIFTS

10

NO. OF ESCALATORS

43

11

HIGH MAST TOWERS

314

12

ELECTRIFIED QUARTERS

TYPE-I & I SPL

12051

TYPE-II

6141

TYPE-III

1033

TYPE-IV & IV SPL

545

TYPE-V

262

TYPE-VI

46

TOTAL

20078

13

STAFF POSITION

SUPERVISORS

76

MINISTERIAL STAFF

49

GROUP C

656

GROUP  D

417

TOTAL STAFF

1198


3.0 Highlights of F.Y. 2018-19

i.  08 no. new lifts have been commissioned for the benefit of Divyang & Aged passengers & staffs at TKJ officers Enclave, CNKP officers enclave & Delhi shahdara Railway station.

ii.  04 no. new escalators have been commissioned for the benefit of Divyang & Aged passengers at Delhi shahdara & Faridabad Railway stations.

iii.  08 no. Lifts replaced in Service building and Officers Railway colony in place of Old aged lifts.

iv.  Replacement of over 83800 nos. conventional luminaries of 11/28/36/40 watt with LED luminaries of 7/13/18 watt at Railway quarters over Delhi division resulting in annual saving of 26.28 Lacs units amounting to Rs. 245.71 Lacs & reduction in CO2 emission of 878.81 Ton.

v.  Renovation/conversion of Sleeper class waiting hall into AC waiting hall at Ajmeri gate side, New Delhi station.

vi. The lux level at different locations such as platforms, circulating areas, waiting halls, FOBs, above escalators and lifts at NDLS,DLI & HNZM have been improved by providing extra fitting and enhancing the wattage by replacing of  exiting fittings.

vii. Proto Type Solar system feeding OHE:-   First ever pilot project of 5 KW on grid solar plant has been installed successfully to feed in 25 KV OHE at  PF  no. 2 /3,New Delhi Station.

viii. The Façade lighting provided at service buildings of Delhi & New Delhi stations of Delhi division.

ix.  Provision of Air Cooling Plant at PF.No.1 at New Delhi :- Air cooling plant of Cap. 13500 CFM has been utilized to provide cooled air at platform no-1 for 2 No. of bays using ducts (after false ceiling clearance was not appropriate for provision of ceiling fans) at  New Delhi for the First  Time as a pilot project in DLI Division. It will improve comfort of waiting passengers.

x.   Provision of Open Ductable AC Plant at New Delhi, DEC, HNZM  & ANVT Railway Station :- In order to ensure better comfort of waiting passengers in waiting room with provision of Open Ductable Invertor type AC plant. In order to ensure aesthetics, illumination pattern is designed in tray at bottom of duct.

xi.  Improvement of Lux level at PRTP sidings using green energy: First time in DLI division solar mini high mast of 8 Mtrs height (10 Nos.) with Bluetooth technology for health monitoring & 6 Nos. 30-Watt standalone Solar LED street light have been used to improve long standing demand of illumination improvement at PRTP Goods siding.

xii. App based Smart Energy Meter:- Single phase energy meter with smart metering and billing system provided in railway officer’s enclave C.F road, New Delhi.

xiii. Provision of Audio Clips at Escalator at Entry/Exit New Delhi Railway Station: First time in history of Delhi division the Audio announcement system has been introduced in escalator at Entry/Exit on FOB-III at New Delhi Railway station of instructions for users of escalator. It is very helpful for the new users of escalators to avoid any mishap.   

xiv. 01 no solar geyser of 2500 LPD commissioned at New Delhi Railway station for availability of hot water. The system will result in annual saving of 0.54 Lac units amounting to Rs.5.04 Lac & reduction in CO2 emission of 44.28 Ton. 







Source : Northern Railways / Indian Railways Portal CMS Team Last Reviewed on: 28-06-2019  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.