1.0 Organizational Setup

1.1 Gazetted: -

Sr. Divisional Signal and Telecommunication Engineer (Co-ordination) heads the S&T wing of the Division and is assisted by Sr. DSTE/I, Sr. DSTE/II, four Senior Scale Officers and nine Assistant Scale Officers.

Out of this team of officers, three senior scale officers viz. DSTE/HQ, DSTE/I & DSTE/II (vacant) and two junior scale officers viz. ADSTE/HQ and ADSTE/Railnet areheadquartered at Divisional Office and seven Junior Scale Officers headquartered at Panipat, Faridabad, New Delhi, Delhi, HazratNizamuddin, Meerut Cantt, and Rohtak. 

1.2 Non-Gazetted: -

There are thirteen maintenance units with stores in the field, responsible for proper upkeep of signaling gears of the division. Each unit is headed by a Sr. Supervisor. Similarly, there are four maintenance units with stores in the field, responsible for proper upkeep of telecom gears of the division. Each unit is headed by a Sr. Supervisor.

Category

Sanctioned Strength

On Roll

Vacancy

Group ‘C’ (Signal)

744

532

212

Group ‘D’ (Signal)

858

835

23

Group ‘C’ (Telecom)

439

371

68

Group ‘D’ (Telecom)

170

146

24

Total

2211

1884

327


2.0 Infrastructure

2.1 Signaling: -

2.1.1

Total No. of Interlocked stations

153

SSI/EI

30

RRI/PI (RST)

100

Mechanical

06

End Panel

06

Electro Mechanical

02

MACLS with STD-I interlocking

09

Total Automatic Signaling Section in RKM

262

Total No. of Intermediate Block Signaling Section

1

Total No. of Interlocked L-Xing

268

Total No. of Interlocked L-Xing with SLB

139

Total No. of non-interlocked manned L-xings with communication facility

259


2.1.2 Type of Signaling: -

Route

Section

No. of Stations

Std. & Type of Interlocking

Type of Signaling

A

NDLS-PWL

10

Std. III with RRI

MACLS

01

Std. III with PI

MACLS

 

[NDLS(ex)] TKJ-CYZ

04

Std. III with RRI

MACLS

01

Std. III with EI

MACLS

 

B

DLI(ex)-UMB(ex)

08

Std. III with RRI

MACLS

11

Std. III with PI

MACLS

06

Std. III with EI

MACLS

01

Std. III with End Panel

MACLS

01

Std. III with End Cabin

MACLS

 

GZB(ex)-SRE(ex)

08

Std. III with RRI

MACLS

11

Std. III with EI

MACLS

01

Std. III with PI

MACLS

 

DEE-RE(ex)

02

Std. III with RRI

MACLS

10

Std. III with EI

MACLS

 

C

HNZM(ex)-PTNR(BG)

03

Std. III with RRI

MACLS

01

Std. III with EI

MACLS

 

D Spl

DLI-‘A’ Panel

03

Std. III with RRI

MACLS

 

D

DLI(ex)-BTI(ex)

36

Std. III with RRI

MACLS

01

Std. III with EI

MACLS

01

Std. III with End Cabin

MACLS

 

E

DSA(ex)-SRE(ex)

01

Std. III with RRI

MACLS

05

Std. III with End Panel

MAUQ

06

Std. III with End Cabin

MAUQ

 

ROK(ex)-PNP(ex)

02

Std. I with Central Cabin

MACLS

01

Std. III with RRI

MACLS

 

JHI(ex)-PNP(ex)

03

Std. III with RRI

MACLS

04

Std. I with Central Cabin

MACLS

 

NRW(ex)-KKDE(ex)

03

Std. I with Central Cabin

MACLS

 

 

 

 

JHI(ex) - SNP(ex)

02

Std. III with RRI

MACLS

 

 

 

 

ABO(ex)-RE(ex)

05

Std. III with RRI

MACLS

 

NDLS-PWL (3rd Line)

01

Std. III with RRI

MACLS


Type of Block Working

Route

Section

Type of Block working

No. of Block Sections

A

NDLS-HNZM

Automatic signaling section

02

HNZM-OKA

Continuous track circuiting

01

OKA-PWL

Automatic signaling section

08

TKJ - CYZ

Automatic signaling section

04

GZB-CYZ

Continuous track circuiting 3rd line

01

 

B

DLI-SZM

Continuous track circuiting

01

SZM-SNP

Automatic signaling section (Double Line)

06

SNP-GNU

SSDAC with Block Instrument (Double Line)

02

GNU-PNP

Block Instrument (Double Line)

04

PNP-GRA

Automatic signaling section(Double Line)

02

GRA-TRR

Block Instrument (Double Line)

04

TRR-AMN

Block Instrument (Double Line) with HASSDAC

02

AMN-MOY

Block Instrument (Double Line)

06

 

GZB-GUH

IBS (with BPAC)

02

GUH-MUD

BPAC (Double Line)

01

MUD-MDNR

SSDAC with Block Instrument (Double Line)

01

MDNR-MTC

BPAC (Double Line)

03

MTC-KAT

SSDAC with Block Instrument (Double Line)

05

KAT-BMHR

BPAC (Single Line)

03

BMHR-TPZ

UFSBI (Single Line) with SSDAC

05

TPZ-SRE

BPAC (Double Line)

01

 

DEE-PTNR(MG)

Continuous track circuiting (South Line)

02

Continuous track circuiting (UP Line)

01

PTNR(MG)-DEC

Continuous track circuiting (North & South Line) with SSDAC (D/D)

02

SSDAC with Block Instrument (Double Line)

01

DEC-PM

SSDAC with Block Instrument (Double Line)

01

PM-KIP

BPAC (Double Line)

08

KIP-RE

SSDAC with Block Instrument (Double Line)

01

 

C

HNZM-LPNR

Automatic signaling section (DC TC)

01

LPNR-DSJ

Automatic signaling section D/D (MSDAC & AFTC)

01

DSJ – BRSQ

Automatic signaling section (MSDAC)

01

BRSQ-PTNR

Automatic signaling section D/D (MSDAC & AFTC)

01

PTNR(BG)-DBSI(DKZ)

Continuous track circuiting

01

PTNR(BG)-DBSI(SSB)

Continuous track circuiting

01

DBSI-ANDI

BPAC (Double Line)

01

 

D Spl

DLI-SBB

Automatic signaling section

03

‘A’ Panel – ‘B’ Panel

Continuous track circuiting (S/L)

01

D

 

 

DLI-SSB

Continuous track circuiting

03

SSB-NNO

Block Instrument (Double Line)

01

NNO-SPZ

BPAC (Double Line)

04

SPZ-BZO

SSDAC with Block Instrument (Double Line)

12

BZO-GSO

BPAC (Double Line)

02

GSO-BTI

SSDAC with Block Instrument (Double Line)

17

BCC-BTI

BPAC (Single Line)

01

 

E

DSA-NO

UFSBI (Single Line) with SSDAC

01

NO-TPZ

NTI (Ball)

12

 

ROK-PNP

NTI (Ball)

04

 

JHI-JCY

Token less (Daido) with SSDAC

01

JCY-MLDE

NTI (Ball)

04

MLDE-KURN

BPAC (Single Line)

01

KURN-BHUL

BPAC (Single Line)

01

PNP-KURN

SSDAC with Block Instrument (Double Line)

01

 

NRW-KIY

UFSBI (Single Line) with SSDAC

01

KIY-KKDE

NTI (Ball)

03

 

ABO(ex)-RE(ex)

Token less (Daido) with SSDAC

05

 

JHI(Ex)-SNP(Ex)

NTI (Ball)

04

 

JNC-FDB (3rd & 4th Line)

UFSBI with SSDAC

01

FDB-PYA (3rd Line)

BPAC (Single Line)

03

PWL–PYA (3rd & 4th Line)

UFSBI with SSDAC

03


2.2 Telecomm: -

S. No.

No. of Items

Total

1

PA System

139 Stns.

2

Digital Clocks

85 Stns.

3

Coach Display System

18Stns.

4

Train Display System

23 Stns.

5

CCTV

14Stns.

6

BSNL Phones

146 Stns.

7

CNL Phone

152 Stns.

8

Telephone Exchange

30 Nos.

9

25Watt VHF set

152 Stns.

10

STM

127 Nos.

11

MUX

220 Nos.













2.3 Staff in terms of DESU: -

DESU over Delhi Division: -

 

Total Signal Units (A1)

DESU

2016-17

185843

427805

2017-18

188987

435014

% increase

1.9%

1.68%





Signal staff per thousand DESU (435014): -

Sanction Staff

Sanction Staff per thousand DESU

On roll staff

On roll Staff per thousand DESU

1602

3.68

1367

3.14





2.4 Staff in terms of DETU: -

DETU over Delhi Division: -

 

Total Telecom units(B1)

DETU

2016-17

291746

550698

2017-18

298852

564713

% increase

2.4%

2.54%





Telecom staff per thousand DETU (564713): -

Sanction Staff

Sanction Staff per thousand DETU

On roll staff

On roll Staff per thousand DETU

609

1.08

517

0.91





3.0 Performance (2018-19): -

3.1 Signaling: -

S. No.

Item

Performance Incidences

Year

2015-16

2016-17

2017-18

2017-18 up to Feb’18

2018-19 up to Feb’19

1.

Signal Incidences reduction

Nos.

9916

9261

7902

7307

7888

Improvement

-4.00%

21.34%

14.67%

15.30%

-7.95%

2.

O/H of Lever Frame

Target

83

43

30

30

57

Done

80.72%  (67)

72.09% (31)

100% (30)

100%  (30)

96.49%  (55)

3.

O/H of SM's Slide Frame

Target

24

9

8

8

22

Done

87.50%    (21)

100% (9)

100% (8)

100%    (8)

100%  (22)

4.

O/H of Block Instruments

Target

09

36

25

25

18

Done

100%       (09)

83.33% (30)

100%  (25)

100%  (25)

100%  (18)

5.

O/H of Shelf type relays

Target

518

458

557

557

277

Done

83.59% (433)

94.10% (431)

119.75% (667)

119.75%  (667)

140.49% (347)

6.

Testing of Lever Frame

Target

143

143

130

130

110

Done

88.81%  (127)

93.71% (134)

101.54% (132)

101.54% (132)

86.36% (95)

7.

Testing of SM's Slide Frame

Target

59

42

47

47

37

Done

88.14%     (52)

100% (42)

100% (47)

100% (47)

83.78% (31)

8.

Testing of Cables

Target

42239

46053

44383

44383

48816

Done

92.77% (39186)

119.79% (55166)

119.44% (53010)

104.89% (46552)

85.06% (41521)

9.

Inspection Stations

Target

100%

100%

100%

100%

100%

Done

100%

100%

100%

100%

100%

10.

Inspection Foot Plate

Target

100%

100%

100%

100%

100%

Done

100%

100%

100%

100%

100%


3.2 Section wise Signal Incidences: -



4.0 Achievements of S&T For The Year 2018-19: -

A. Innovation: -

B. Commissioning and Interlocking: -

  • Electronic interlocking at NiloKheri, Taraori and DhodaKheri were provided and commissioned by Project Organization.


  • Route Relay interlocking was provided at Faridabad New Town by Construction Organization.
  • Work of “Provision of One crossover from South Line to UP Main Line at Delhi Cantt end of Delhi Sarai Rohilla Yard of Delhi-Rewari section” commissioned. This involved provision of new crossover no. P281 which will enable Departure facility from South Line to Up Main Line at Delhi Cantt end of Delhi Sarai Rohilla Yard by Division.
  • 06 Level crossing gates were provided with Electric lifting barrier for ease of operation.


  • 05 level crossing gates were interlocked to improve safety.
  • New Data logger of 1024 Digital inputprovided at Ghaziabad station by Division and old RTU were replaced with Datalogger of 512 digital inputs at 4 nos. relay hut between Panipat – Gharaunda Section.
  • MSDAC (CEL make) provided by Project Unit at Pehowa Road station yard for complete track circuiting of yard.

C. Redundancy in Power Supply and Back up Arrangements: -

  • 11 IPS provided at various stations and LC gates for uninterrupted power supply to improve reliability of power supply.


  • Auto fuse change over system provided at 14 nos. of stations.

D. Safety Improvement Work: -

  • 60 level crossing gates were manned at unmanned LC Gates to enhance the safety.
  • 79 Sliding booms barriers arrangement for emergency operation of level crossing gates against a target of 50 provided in this year.

  • Dead Approach Locking with Timer provided at Level Crossing gates. Thus total 81 nos. LC gates provided with Timer arrangement.
  • MACL with MLB commissioned at Level crossing gate no. 4 between Narwana and Kalayat stations.
  • Overhauling of Lever frames of 12 cabins was completed at Manani, Rampur Maniharan, Nanauta, Thana Bhawan,Shamliand Hind stations.

E. Dual Detection: -

  • Dual detection with SSDAC installed alongwith existing Block Proving Axle Counter UP & DN lines of block sections –Taraoari – Nilokheri, Nilokheri – Amin, Khalilpur – Rewari and Delhi Kishan Ganj - Dayabasti.
  • Dual detection with SSDAC provided alongwith existing Track circuits at 19 nos. track circuits at 4 nos. of platforms of Ghaziabad, TC no.714T at Holambi Kalan, TC no. 35BT on UP GAL between Tilak Bridge –Hazrat Nizamuddin, 10 track circuits between Tilak Bridge – Anand Vihar. UP & DN GAL of ‘B’ Panel, 1T (Bridge no.149) of Babarpur.

F. System Improvement: -

  • Wireless monitoring system for monitoring various power supplies provided at relay/porta huts and generating SMS alert provided at RH-23, 24 and 25 of Delhi-Ambala section, Lodi colony PH at Delhi Safdarjang & Narayana Vihar PH at Barar Square station.
  • 10nos. of Stabilizers provided in A.C. Power Supply at New Delhi station for regulated Power Supply.
  • 45 nos. Charger off indication provided for 4 nos. of chargers in 60V DC Internal and External power supply of Asaoti station, 3 nos. of chargers of Tilak Bridge provided at ESM room of Tilak Bridge station, 38 nos. of Track Feed chargers of Junction Cabin, Asaoti, Murad Nagar, Meerut Cantt, Pabli Khas and Daurala  stations.
  • 106 nos. new Thick Web Switch Point machine have been provided during traffic block.
  • The replacement of defective/overaged IRS Point machine 202 nos. have been provided.
  • Targeted work of removal of HMUs completed at 140 stations.
  • Provision of Boiler based Distilled water plant has been done at 08 locations. It needs no consumables and improves life of secondary lead acid cells.
  • Earth Leakage Detectors provided at 34 stations to improve the
  • 4600 nos. of   PPTC fuses provided for track circuits at 35 nos. stations
  • Audio visual alarm regarding Fuse Automatic Changeover and Alarm System provided in ESM rooms of Delhi Safdarjung, Barar Square, Tilak Bridge and Okhla stations.
  • Media Diversity by means of OFC Channels provided for SSDAC in block sections (Meerut City-Meerut Cantt) and (Meerut Cantt-Pabli Khas).
  • E1 converter (Maple 4C - Make) provided for MSDAC at TC no. 403T, 405T between DSJ-BRSQ and SSDAC for Block (All UP & DN) at DTN-TUN, PM-DEC, TUN-HMQ, NRW-GSO, MSZ-SSZ & PNP-KURN.
  • E1 converter (CEL - Make) provided for BRZ-BLZ, MDNR – MUD, TPZ-NGL & BMHR-RNA.
  • Track feed charger with potential free contact alarm through data logger provided at 7 stations.
  • 60 Nos of CCTV camera has been installed in NRCH in different locations for security purpose.
  • AT supply has been provided for SMPS of CNL communication & VHF set at NPX (Narinder Pura), MSZ (Mansa) and BLZ (Budhlada) in DLI-BTI section.
  • Hotline connection has been formed between Gate no 195, 197 and 216 between Budhlada to Narindarpura.
  • 01 no PAE, including 184 nos 6 watt Ceiling& wall mounting speaker and 4 Nos 500    watt   Amplifier has been installed in different location at NRCH New Delhi.
  • 01 no Projector and DVD player has been installed in conference hall Renovation work at NRCH.
  • At 19 Nos of station TSR connectivity has been provided and they are: PWL, AST, FDN, GZB, CYZ, TKJ, SSB, JIND, DEE, SBB, B-PNL, ROK, KKDE, FDB, NDLS, DLI, PNP, HNZM and  SZM stations.
  • Video/Audio arrangements for 190 nos. of VVIP functions were arranged and out off 190 the important one includes Hon’ble Prime Minister function for Inauguration of  “Vande Bharat Express”   Train No : 22436 from NDLS to BSB, Inauguration function of Gokulpurboli Halt station in Delhi Area by Hon’ble MR,independence day function at Baroda house,DRM office,NDCPR workshop on children protection, Sadhbhawna divas function & “Satya Nishtha Function” at Railway Board by Hon’ble CRB,
  • BPAC has been shifted from 4 Quad to new 6 Quad cable as per RE modification work in RE-KIP,KIP-IHP,IHP-PTRD,PTRD-JSKA,JSKA-PT,PT-GHH,GHH-GGN sub sections in DLI-RE section
  • Emergency sockets are shifted from 4 quad cable to 6 quad cable in PT-JSKA,JSKA-PTRD,PTRD-IHP and IHP-KIP section as per RE modification work.






Source : Northern Railways / Indian Railways Portal CMS Team Last Reviewed on: 02-07-2019  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.