Electrical – Traction Distribution (TRD)

1.0 Performance
Description | 2017-18 (up to February 2018) | 2018-19 (up to February 2019) |
Internal Failures (in nos.) | 9 | 6 |
External Failures (in nos.) | 11 | 9 |
Punctuality losses (nos.) | 66 | 137 |
AOH of OHE in TKM | 762.28 | 842 |
POH of OHE in TKM | 280.86 | 350.60 |
POH of ATD (in nos.) | 470 | 409 |
POH & Checking of Gantries (in nos.) | 49 | 39 |
Energy Bill paid (in Crores) | 249 | 205 |
2.0 Improvement and Reliability Action Plan
S.N. | Description | Target for year 2018-19 (up to February) | Progress during 2018-19 (up to February) |
1 | Replacement of contact wire having brazed joints (in Km) | 46 | 48.61 |
2 | Replacement of overaged/ weak Catenary wire (in Km) | 9 | 9.22 |
3 | Replacement of corroded steel anti-creep wires with copper catenary wire (in nos.) | 23 | 23 |
4 | Removal of insulated catenary/ insulated tapes from catenary wire (in nos.) | 73 | 70 |
5 | Checking & calibration of protection relays at specified interval (in nos.) | 13 | 13 |
6 | Live line checking by tower wagon | 772 | 934 |
7 | Current collection Test | 772 | 886 |
8 | Provision of composite insulators in polluted and vandal prone area (in nos.) | 367 | 662 |
9 | Provision of missing bonds (in nos.) | 1400 | 5633 |
10 | Provision of Disconnector for lightening arrester as per RDSO TI/MI /0048 | 46 | 57 |
11 | Replacement of old designed RRA clamps with modified RRA clamp | 138 | 119 |
3.0 Infrastructural Overview
3.1 Section Wise
There are 12 OHE maintenance depots, 7 PSI depots, 01 Remote Control Centre and 01 maintenance Workshop-cum-Store.
Item | DLI area | DUK section | TKD-PWL | SSB-BTI | GZB –TPZ | ROK-RE | DEE-RE | KKDE-NRW | Total |
Electrified route Km. | 166 | 205 | 33 | 280 | 159 | 73 | 78 | 84 | 1078 |
Electrified Track Km. | 696 | 560 | 212 | 689 | 340 | 85 | 200 | 100 | 2882 |
OHE depot (nos.) | 4 | 3 | 1 | 2# | 2@ | - | 1 $ | - | 13 |
PSI depot (nos.) | 2 | 2 | 1 | 1# | 1 | - | - | - | 7 |
Traction sub-station (nos.) | 2 | 4 | 1 | 5 | 2 | - | 1 | - | 15 |
Switching stations (in nos.) | 16 | 12 | 4 | 17 | 10 | 5 | 6 | 6 | 76 |
Remote Control Center (in nos.) | 1 | - | - | - | - | - | - | - | 1 |
Workshop (in nos.) | 1 | - | - | - | - | - | - | - | 1 |
# Two OHE depots (ROK & Mansa) and one PSI depot are not operational due to paucity of staff.
@ One OHE depot (MDNR) is not operational due to paucity of staff.
$ One OHE depot (GHH) is not operational due to paucity of staff.