Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter Find us on Youtube View Content in Hindi
National Emblem of India

About Us

News & Recruitment Info

Tenders

Passenger Info

Kalka Shimla Railway Heritage Site

Contact Us



Goto Yahoo!!


 
Bookmark Mail this page Print this page
QUICK LINKS

Electrical – Traction Distribution (TRD)




1.0 Performance


Description

2017-18

(up to February 2018)

2018-19

(up to February 2019)

Internal Failures (in nos.)

9

6

External Failures (in nos.)

11

9

Punctuality losses (nos.)

66

137

AOH of OHE in TKM

762.28

842

POH of OHE in TKM

280.86

350.60

POH of ATD (in nos.)

470

409

POH & Checking of Gantries (in nos.)

49

39

Energy Bill paid (in Crores)

249

205


 2.0 Improvement and Reliability Action Plan


S.N.

Description

Target for year 2018-19 (up to February)

Progress during 2018-19 (up to February)

1

Replacement of contact wire having brazed joints (in Km)

46

48.61

2

Replacement of overaged/ weak Catenary wire (in Km)

9

9.22

3

Replacement of corroded steel anti-creep wires with copper catenary wire (in nos.)

23

23

4

Removal of insulated catenary/ insulated tapes from catenary wire (in nos.)

73

70

5

Checking & calibration of protection relays at specified interval (in nos.)

13

13

6

Live line checking by tower wagon

772

934

7

Current collection Test

772

886

8

Provision of composite insulators in polluted and vandal prone area (in nos.)

367

662

9

Provision of missing bonds (in nos.)

1400

5633

10

Provision of Disconnector  for lightening arrester as per RDSO TI/MI /0048

46

57

11

Replacement of old designed RRA clamps with modified RRA clamp

138

119




3.0 Infrastructural Overview

3.1 Section Wise

There are 12 OHE maintenance depots, 7 PSI depots, 01 Remote Control Centre and 01 maintenance Workshop-cum-Store.


Item

DLI area

DUK section

TKD-PWL

SSB-BTI

GZB –TPZ

ROK-RE

DEE-RE

KKDE-NRW

Total

Electrified route Km.

166

205

33

280

159

73

78

84

1078

Electrified Track Km.

696

560

212

689

340

85

200

100

2882

OHE depot (nos.)

4

3

1

2#

2@

 -

1 $

-

13

PSI depot (nos.)

2

2

1

1#

1

 -

-

-

7

Traction sub-station (nos.)

2

4

1

5

2

 -

1

-

15

Switching stations (in nos.)

16

12

4

17

10

5

6

6

76

Remote Control Center (in nos.)

1

-

-

-

-

 -

-

-

1

Workshop (in nos.)

1

-

-

-

-

 -

-

-

1


# Two OHE depots (ROK & Mansa) and one PSI depot are not operational due to paucity of staff.

@ One OHE depot (MDNR) is not operational due to paucity of staff.

$ One OHE depot (GHH) is not operational due to paucity of staff.





Source : Northern Railways / Indian Railways Portal CMS Team Last Reviewed on: 30-07-2019  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.