Fertilizer loading has been improvement of 5.56% in comparison to LY (Apr-Oct) (863.5 rakes CY against 818 rakes LY).
Sugar loading has been improvement of 4.88% in comparison to LY (Apr-Oct) (172 rakes CY against 164 rakes LY).
Auto loading has been improvement of 214% in comparison to LY (Apr-Oct) (66 rakes CY against 21 rakes LY).
Interchange of division has improved from 21931 (Apr to Oct-21) to 22670 in (Apr to Oct-22) (an improvement by almost 37.03%).
LONG HAUL RUN * has improved from *42 in (Apr to Oct-21) to 215 (Apr to Oct-22) (an improvement by almost 408%). CRACK RUN * has improved from *1160 in (Apr to Oct-21) to 1997 in (Apr to Oct-22) (an improvement by almost 72%).
Infrastructure improvement works completed
1. Interlocking facility
a) 8 coach facility Standard-1 to Standard-3 on 20.05.2022
b) Separate isolators provided for Rampur sidings (SS-781) (line no.-10,11,12,13, DN shunting neck, Engg. siding) & Kathgodam main line (SS-782) on 10.06.2022.
c) Separate isolators provided for sidings (SS-781) (line no.-11,12,13. (SM 895) Kanthgodam provided for KGM line, (SS 782) Provided line No. 10 and Shunting Neck.
2. New Double Line
Opening of double line between NERI-SPC (32 Kms) stations on RAC-SPC section on 11.04.2022
3.Improvement of Goods Shed
a)Loading/unloading PF along with line No. 04 BGMU on 01.04.2022
b)Tower wagon siding AMRO commissioned on 10.04.2022
c)Loading/Unloading PF in 746 Mts by using unserviceable sleepers on 18.04.2022
d)The Work of shunting neck and stabling line at Deheradun completed on 15.07.2022.
e)To open round-the-clock working at POSA siding w.e.f. 08.09.2022
f)IPA granted to Ulteratech cement at Roorkee w.e.f. 06.10.2022
4. Provision of IBS
(a) Provision of IBS between KAR-MST on 10.04.2022.
(b) Provision of IBS between LRJ-RSI on 20.06.2022.
(c) Provision of IBS between AJI-TDP on 20.08.2022.
5. Road User Safety / Closure of LC gates
·LC No. 39 between BLM-ON closed due to LHS on May'22.
·LC No. 23 ,25,30,31,33,35,37A,42,48A between RAC-SPC closed due to LHS by Construction Department onMay'22.
·LC No. 323 between BLPU-MK closed due to construction of ROB on 25.05.2022.
·LC No. 26 between GLH-HZR closed due to LHS on 13.07.2022.
·LC No. 318 between ROZA-SPN closed due to construction of ROB on 24.07.2022.
·LC No. 62 and 63 between MAH-MLW closed due to LHS on 02.09.2022.
·LC No. 39 between BGMU-SFPR closed due to LHS on 14.09.2022.
SAFETY CIRCULAR (click on the link to download)
No. 1 to 22_Year 2019
No. 1_Year 2020
No. 2_Year 2020
SAFETY DRIVE (click on the link to download)
No. 1 to 09_Year 2019
No. 1_Year 2020
ACCIDENTAL MANUAL 18 (click on the link to download)
ACC. MANUAL
BLOCK WORKING MANUAL (click on the link to download)
BLOCK WORKING
G&SR NR 185 (click on the link to download)
G&SR
OPERATING MANUAL 2016 (click on the link to download)
OPTG. MANUAL