Details of section where OFC is not available
S.NO | SECTION | NO OF STATION | K.M | Remark |
1 | MB-CH | 7 | 45.85 | RE/Ambala Work is under progress. Target Mar - 2022 |
2 | CH-HGJ | 8 | 84.41 |
3 | SPC-BLM | 6 | 64.03 | Dy. CSTE/RE/LKO Work is under progress. Target Mar – 2022 |
4 | BLM-ON | 7 | 102.2 |
5 | NBD-KTW | 3 | 24.01 | Work proposed in GM power in 2021-22 |
6 | GJL-MZM | 5 | 94 | RE/Ambala Work is under progress. Target Mar – 2022 |
Mitigation action plan in the year 2021-22:
Gears | % Contribution | Remark | |
BI | 40.28% | 1) Replacement of BPAC and dual detection is in progress. BPAC/Dual detection has been done in 14 block sections in current year against target of 15 block sections. Total scope is 53 block sections. Works has been sanctioned for replacement of BPAC in remaining 26 block sections 2) For replacement of TX/RX coils supply form CEL is being taken instead of Byculla workshop make which is not suiting to CEL EJB. 3) Every fortnightly track devices parameters are being checked and ensured 4) Replacement/repair of defective quad cable is under progress. Total 46 block sections identified. Quad cable required for improving section. PO for cable to be issued. | |
UFSBI | 2.52% | |
BPAC | 20.34% | |
HASSDAC | 0.77% | |
NTI | 0.95% | |
SGE | 2.75% | |
SSDAC | 11.52% | |
TLI | 1.44% | |
LC | 6.17% | 1) Provision of Sliding barrier is completed for 31 LC gates in current year, total scope is around 140 and target for current year is 100. 2) Mechanical locking has been ensured on bi-weekly basis 3) Wire run is being replaced on 6 monthly basis 4) Provisioning of ELB is planned at 25 LC gates, out of which 36 have been commissioned during 2021-22 5) Spare for ELB are being arranged. | |
ELEC | 1.85% | |
MECH | 4.32% | |
PT | 8.28% | 1) In Division total 250 point machines were overdue as on 01.04.2021 for replacement. So far 241 machines have been replaced. 2) Point & crossing deficiencies being attended and discussed in safety meeting. 3) Stud bolt head break cases sent to Engg to study reason. | |
ELEC | 5.49% | |
MECH | 2.79% | |
SIG | 29.57% | 1) Fault alarms of ELD channels are being rectified, total 212 alarms have been identified as on 01/02/2021. 51 alarms have been rectified in 2021-22. 2) Defective signaling cable replacement is under progress 16.261 KM has been replaced in current year 3) Overaged LED replacement has been done for 774 aspects against target of 2028; for balance material has to come from AMV depot. | |
|
MACLS | 29.07% | |
SEMAPHORE | 0.50% | |
TC | 15.71% | 1) Defective glued joints are being identified with jointly inspection with P-Way and replacement is planned accordingly; total 479 defective glued joints have been replaced during current year 2) Iron chip cases are also high which will be reduced by glued joint changing and regular cleaning of glued joints. | |
Axle Counters | 2.52% | |
DC | 11.97% | |
MSDAC | 0.36% | |
SSDAC | 0.86% | |