Track Network: Group | Route km | Total track km | A | - | - | B | 288.2 | 753.0 | C | - | - | D | 164.7 | 338.3 | E | 1222.4 | 1532.5 | NG | 165.8 | 180.2 | Total | 1841.1 | 2804 | Level crossing gate: S.No. | Class | No. of LCs | 1 | Special | 127 | 2 | ‘A’ Class | 57 | 3 | ‘B’ Class | 85 | 4 | ‘C’ manned | 510 | Total | 779 | Bridges: S.No. | Class | No. of Bridges | 1 | Important | 29 | 2 | Major | 477 | 3 | Minor | 5120 | 4 | RUB | 168 | 5 | LHS | 180 | 6 | ROB | 135 | 7 | FOB | 90 | Total | 6199 | Curves: Sr. No. | Total No. of curves | Total track Km on curves | Proportion of curved track | 1 | 881 | 402.9 | 14.43% | Staff Strength: S. No. | Category of Staff | Present Sanctioned Strength | Manpower on Roll | Vacancy w.r.t. Sanctioned Strength | % Vacancy | A | P. Way staff | | 1 | SSE/ JE/ P.Way | 214 | 197 | 17 | 8% | 2 | Track Maintainer | 5956 (7012 MCNTM) | 3875 | 2081 | 35% | 3 | Blacksmith (P.Way) | 59 | 48 | 11 | 17% | 4 | Welder (P.Way) | 54 | 49 | 5 | 9 % | 5 | Carpenter (P.Way) | 10 | 5 | 5 | 50% | 6 | Painter (P.Way) | 8 | 3 | 5 | 63% | 7 | Helper (P.Way) | 108 | 40 | 68 | 63% | Total of P. Way Staff | 6409 | 4217 | 2192 | 34% | B | Works staff | | 1 | SSE (Works) | 54 | 50 | 4 | | 2 | JE (Works) | 27 | 15 | 12 | | 3 | Welder (Works) | 0 | 0 | 0 | | 4 | Blacksmith (Works) | 22 | 14 | 8 | | 5 | Mason (Works) | 50 | 25 | 25 | | 6 | Painter (Works) | 18 | 8 | 10 | | 7 | Carpenter (Works) | 36 | 28 | 8 | | 8 | Plumber (Works) | 21 | 21 | 0 | | 9 | Helper (Works) / Khalasi | 340 | 290 | 50 | | | Sub Total of Works staff | 568 | 451 | 117 | | C | Design and Drawing staff and Others | | 1 | SSE (Drawing & Design) | 9 | 7 | 2 | | 2 | JE (Drawing & Design) | 6 | 6 | 0 | | 3 | Engineering Store Chowkidar | 78 | 40 | 38 | | | Sub Total | 93 | 53 | 40 | | | Total | 7070 | 4721 | 2349 | |
Source : Northern Railways / Indian Railways Portal CMS Team Last Reviewed : 01-12-2023
|
|
|