Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter Find us on Youtube View Content in Hindi
National Emblem of India

About Us

NR H.Q.

Divisions

Passenger & Freight services

News & Recruitment Info

Tenders

Contact Us



 
Bookmark Mail this page Print this page
QUICK LINKS
Electrical

 



ELECTRICAL (G)

Staff Strength

Staff

SSE

JE

WM

SBA

Fitter

Fitter

Vehicle Dr.

TLF

ACF

Asstt TL AC

Asstt Pow

Ministerial

Total

SS

36

29

107

41

25

16

2

170

136

173

153

29

917

OR

36

29

101

39

24

12

2

155

122

80

88

24

712

Vac

0

0

6

2

1

4

0

15

14

93

65

5

205


POWER SUPPLY STATS

1.

Nos. of electrified stations (SEB)

=

136

2.

NSG-2

=

02 (CDG, UMB)

3

NSG-3

=

3 (SRE, KLK, BTI)

4.

NSG-4

=

4 (RPJ, SIR, PTA, ABS)

5

NSG-5

=

22

6

NSG-6

=

102

7.

Nos. of stations provided with 100%LED lights

=

136

8.

Nos. of Escalators

=

Total = 14 Nos.

8 (CDG), 2 (UMB), 2 (SRE), 2 (BTI)

9

Nos. of Lifts

=

Total = 15 Nos.

2 (CDG), 4(UMB), 2(SRE), 2 (BTI),

3 (SASN)

1 (Divisional Hospital UMB)

1 (DRM Office)

10

Total connected load

=

39698 KW

11

Average monthly consumption

=

36 Lacs units

12.

Avg. Monthly Electricity Bill

=

Rs.198 Lacs

13

Monthly Recovery from Qrs and outsiders

=

Rs. 87 Lacs

14.

Nos. of electrified quarters

=

14148

15

Nos. of stations provided with 10 KWp solar power system

=

11 (SFM, MET, RPHR, LHM, TPA, BTIC, PJK, NBA, PUL, CNDM, SAG)

16.

Nos. of stations provided with 3 KWp solar power system

 

18 Nos. (KLK-SML section)

17.

Roof Top Solar Power Plant

(On-grid) Commissioned

=

Total 2.706 MWp

  • DRM Office 115KWp,
  • UMB 540KWp,
  • DKT 45KWp,
  • PTA 75KWp,
  • BTI 216KWp,
  • CDG 330KWp,
  • ABS 50KWp,
  • SML 160KWp
  • UBC 70KWp,
  • SRE 485KWp,
  • Loco Shed/KJGY 540KWp
  • YJUD 80KWp

18

Nos. of manned L-xing Gates

=

328

19

Nos. of Manned L-xing Gates Electrified

=

328

20

Nos. of water coolers

=

171

(a)

For passenger Amenity

=

90

(b)

For staff Amenity

=

81

21

Nos. of Air Conditioners

 

 

(a)

Window type

=

518

(b)

Split type

=

324

(c)

Package type

=

17x3 (AC Plant)+ 11x3 (AC plant) (DRM office)

 

(d)

VRF type

=

10 ton x 2

22

Nos. of Refrigerator

=

32

23

Nos. of DG sets (3 phase) Installed

=

53

24

Nos. of DG sets with AMF panels

=

35

25

Nos. of sub. Station

=

39

26

Nos. of HT Connection

=

18

27

Nos. of LT Connection

=

391

28

Nos. of HT Panel

=

40

29

Nos. of LT Panel

=

206

30

Nos. of Transformer Installed

=

87

31

Total Capacity of Installed Transformers

=

45777 KVA

32

Intensity of utilization (KWH/KW/Month)

=

121.31

33

Nos. of ATs

=

231

34

Length of HT overhead network

=

16 Kms.

35

Length of LT overhead network

=

280 Kms.

36

Cable length (HT)

=

47 Kms.

37

Cable length (LT)

=

2234.5 Kms.

38

Nos. of Pumps

 

205

a)

Submersible

=

198

b)

Horizontal shaft

=

7 (Kaushalaya bed at Kalka)

39

Pump Automation

 

 

a)

With GSM

=

50

b)

With timer

=

2

d)

ASM Control

=

154

40

Nos. of Tower

=

176 Nos.

41

Nos. of Lights on Tower

=

973 Nos.

42

Nos. of washing line

=

13 Nos.

43

Nos. of Running room

 

7(SRE,UMB,DUI,BTI,CDG,NLDM,SML)

44

Nos. of RRI building

 

5(SRE,UMB,BTI,CDG,DUI)

  




Source : Northern Railways / Indian Railways Portal CMS Team Last Reviewed : 28-08-2023  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.