Staff Strength
Desgn. | SS/TI/ CYM | CHC/ SCNL | WMI | GUARD | SHTG. MAS | CABIN MAN | POINTS MAN | GATE MAN | TRAINS CLERKS | MIN. STAFF |
SS | 668 | 40 | 5 | 534 | 87 | 48 | 808 | 288 | 126 | 55 |
OR | 558 | 36 | 4 | 370 | 15 | 34 | 700 | 202 | 106 | 49 |
Vac | 110 | 04 | 01 | 164 | 72 | 14 | 108 | 86 | 20 | 06 |
1. | Total no. of Block Stations | = | 115 |
| |
|
|
i. | B- Class STD – II R Interlocked stations | = | 49 |
ii. | B- Class STD – III Interlocked stations | = | 17 |
iii. | B- Class STD – I Interlocked stations | = | 13 |
iv. | Spl. Class STD – III Interlocked stations | = | 03 |
v. | Spl. Class STD – III (R)Interlocked stations | = | 03 |
vi. | Spl. Class STD – II (R) Interlocked stations | = | 03 |
vii. | A- Class STD – I Interlocked stations | = | 01 |
viii. | Rudimentary Interlocked stations (NG) | = | 17 |
ix | B Class STD III R |
| 09 |
2. | Goods Shed Terminals | = | 38 |
| |
| |
i. | Full Rakes Sidings | = | 35 |
ii. | Half Rakes Sidings | = | 3 |
|
|
|
|
3. | Private Sidings | = | 29 |
| |
|
|
i. | Thermal Plant Sidings | = | 5 |
ii. | Cement Plant Sidings | = | 5 |
iii. | FCI sidings | = | 2 |
iv. | Paper Mill Sidings | = | 2 |
v. | Ammunition Depot Sidings | = | 2 |
vi. | NFL Sidings | = | 2 |
vii. | Private Freight Terminal | = | 5 |
viii. | Container Siding | = | 1 |
ix. | LPG/Petroleum sidings | = | 1 |
x. | Wagon Manufacturing Plant | = | 1 |
xi. | Chemical Siding | = | 1 |
xii. | Silo Siding | = | 2 |
Major Achievements of Operating Deptt Ambala Division during 22-23
1)Total 1403 wagons (Cement=1402, Ply Wood=1) have been loaded in piecemeal during Apr-23.
First time in Ambala Division, 01 wagon of Plywood is loaded in piecemeal on 21-04-2023.
2)Electrification is commissioned at RGTP/BXC siding on 03-04-2023 and GHTL/VBCG sidings at LHM on 08-04-2023.
3)New Sarai Banjara ( SBJN) of DFCCIL is commissioned after alteration in SBJ Yard and three aspect automatic signaling converted into four aspects in between SBJ-RPJ-SBJ Section on 14-04-2023.