Staff Strength
Desgn. | SS/TI/ CYM | CHC/ SCNL | WMI | GUARD | SHTG. MAS | CABIN MAN | POINTS MAN | GATE MAN | TRAINS CLERKS | MIN. STAFF |
SS | 668 | 40 | 5 | 534 | 87 | 68 | 808 | 288 | 126 | 55 |
OR | 545 | 37 | 4 | 376 | 19 | 38 | 717 | 202 | 110 | 45 |
Vac | 123 | 3 | 1 | 158 | 68 | 30 | 91 | 86 | 16 | 10 |
1. | Total no. of Block Stations | = | 115 |
| |
|
|
i. | B- Class STD – II R Interlocked stations | = | 49 |
ii. | B- Class STD – III Interlocked stations | = | 17 |
iii. | B- Class STD – I Interlocked stations | = | 13 |
iv. | Spl. Class STD – III Interlocked stations | = | 03 |
v. | Spl. Class STD – III (R)Interlocked stations | = | 03 |
vi. | Spl. Class STD – II (R) Interlocked stations | = | 03 |
vii. | A- Class STD – I Interlocked stations | = | 01 |
viii. | Rudimentary Interlocked stations (NG) | = | 17 |
ix | B Class STD III R |
| 09 |
2. | Goods Shed Terminals | = | 38 |
| |
| |
i. | Full Rakes Sidings | = | 35 |
ii. | Half Rakes Sidings | = | 3 |
|
|
|
|
3. | Private Sidings | = | 29 |
| |
|
|
i. | Thermal Plant Sidings | = | 5 |
ii. | Cement Plant Sidings | = | 5 |
iii. | FCI sidings | = | 2 |
iv. | Paper Mill Sidings | = | 2 |
v. | Ammunition Depot Sidings | = | 2 |
vi. | NFL Sidings | = | 2 |
vii. | Private Freight Terminal | = | 5 |
viii. | Container Siding | = | 1 |
ix. | LPG/Petroleum sidings | = | 1 |
x. | Wagon Manufacturing Plant | = | 1 |
xi. | Chemical Siding | = | 1 |
xii. | Silo Siding | = | 2 |
Major Operating Achievement up to Dec-22 |
1) | It is remarkable to note that Ambala Division has registered Total loading during 2022-23 up to Dec is 852.564 average wagons per day in comparison to 805.498 average wagons per dayduring same period of the last year, showing an improvement of 5.84% i.e. higher than the last year. Loading of 113.05 Million Tone is achieved up to Dec-22, which is 4.74% higher than the last year up to same month. |
1.1) | Container loading during Dec-22 is 184.484 wagons avg per day, which is Best Ever.Previous Best Ever was 171.233 during Apr-22. |
1.2) | Container loading is 355 wagons on 25-5-22, which is single day Best Ever. Previous Best ever was 345 wagons on 30-04-22. |
1.3) | Tractor loading during Aug-22 is 32.710 wagons avg per day, which is Best Ever. Previous Best Ever was 30.194 wagons average per day during July-22. |
2) | Piecemeal loading of 2782 wagons including 2745 wagons of Cement, 36 wagons of paper and 01 wagon of Machine parts have been loaded upto Dec-22.First time in Ambala Division, one wagon was loaded with Machine Parts from Doraha station on21-11-22. |
3) | Total Interchange during 2022-23 up to Dec-22 is 9048.065 wagons average per day in comparison to 7390.924 wagons average per day during same period of last year, showing an improvement of 22.42%. |
3.1) | May-22.Total Interchange during June-22 is 9878.433 wagons average per day, which is Best ever. Previous Best Ever was 9627.032 wagons average per day during |
4) | Terminal Receipt during 2022-23 up to Dec-22 is 1280.938 wagons average per day in comparison to 904.698 wagons average per day during same period of last year, showing an improvement of 41.59%. |
5) | Total 619 Long Hauls formed during 22-23 up to Dec-22 in comparison 111 Long Haul during 21-22 up to same month, showing an improvement of 457.67%. |
5.1) | Total 100 Long Hauls formed during June-22, which is Best Ever. Previous Best ever was 99 Long hauls during May-22. |
6) | VBCG Cement plant Lehra Muhabat started loading of cement by rail, first rake was loaded during Sept-22. |
7) | One new train 22447/22448 (Vande Bharat express) was introduced between Amb Andaura (AADR)- New Delhi (NDLS) w.e.f. 21-10-22. |