Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter Find us on Youtube View Content in Hindi
National Emblem of India

About Us

NR H.Q.

Divisions

Passenger & Freight services

News & Recruitment Info

Tenders

Contact Us



 
Bookmark Mail this page Print this page
QUICK LINKS
Mechanical (O&F)


MECHANICAL (O&F)

Staff Strength

Cadre

SS

OR

Vac.

CLI

80

66

14

PRC/CC/TLC

150

83

67

LPM

126

120

06

LPP

179

150

29

LPG

606

475

131

LPS

161

82

79

ALP

867

827

40


Assets

1.

140 Ton B. D. Crane

UMB & BTI

2.

ARTs

UMB. KLK, BTI & SRE

3.

Road Mobile Brake Down Truck

UMB

4.

SPARMV/ARMV

SRE/KLK

5.

RCDs

UMB, KLK, BTI & DN Side SRE

6.

Running Rooms

UMB, CDG, BTI, SRE, DUI, RTP, NLDM, SML and Crew rest room at DLPC

7.

Lobbies

UMB, KLK, BTI, SRE, DUI, CDG & NLDM

8.

NG Diesel Loco ZDM-3

16

9.

Rail Motor Car

04

10.

Steam Loco –KC-520

01

S.No

        ACHIEVEMENTS

1

Two foldable type rescue platforms (for BD Crane UMB & BTI) had been provided on 18..04.2022

2

189 nos. of safety shoes   i.e ( UMB =54,BTI=50,SRE=50 & KLK=35) have been provided for all ARTs on dated 23-04-2022.

3

189 nos. of winter jackets i.e   ( UMB =54,BTI=50,SRE=50 & KLK=35) have been provided for all ARTs on dated 25-04-2022.

4

A Panel of 74 nos of LPS has circulated on dated 13-04-2022.

5

In this month 03 Safety  Drives has been launched regarding summer/hot weather precautions,precautions to be taken during train working in stormy/fast wind blowing,application of vigilance penalty brake,prevention of SPAD .

6

Safety seminar has been organized by ADME/OP/UMB at KLK ,CDG& SRE on dated 28-04-2022  & 29-04-2022 respectively

7

A safety seminar cum CLIs meeting was organized on 05-05-2022 headed by worthy DRM/UMB.

8

Safety seminar has been organized by ADME/OP/UMB at KLK ,CDG& SRE on dated 28-04-2022  & 29-04-2022 respectively.

9

180 nos.new FSD  have been received on date  10-05-2022.

10

Safety seminar organized at RR/DUI by ADME/OP/UMB on 14.05.2022 .

11

02 all in one PCs of SSE/Dsl/UMB have been received on 18.05.2022.

12

180 nos.of battery charger for HYT TC make walkie talkie sets have been procured and distributed among all crew lobbies over UMB division.

13

Coach no. X00878 (MFD Van)  received at UMB under RSP from AMVW/LKO.Now this   coach has been attached with ART UMB take at 18.30 hrs. on 17.07.2022 after commissioning at sick line UMB.

14

Control table & 08 pairs of hydraulic hoses of MFD make for  HRE ART/BTI has been procured/received on 29.07.2022.

15

In this month 02 Safety  Drives has been launched i.e Divisional safety drive Mech./Rso no. 07/2022 regarding counseling to Running staff in connection with recommendation made by enquiry committee of derailment of 12 coaches of 11061 Dn. Central railway on 03.04.2022 & Divisional safety drive Mech./Rso no. 09/2022 regarding precautions to be taken during train work in monsoon/rainy weather . 

 16

12 nos.of printers have been received on 10.08.2022 by CCC/UMB , out of which 01for lobby UMB,02 for lobby CDG,05 for lobby BTI & 04 for lobby SRE.

17

Safety seminar organized by Sr.DME/O&F UMB & Sr.DSO/UMB  at KLK shed on 31.08.2022 and counseled the Running staff to prevent SPAD cases & about safe train operation.

18

Hydraulic oil tank(Holmatro power pack received 10.09.2022,replaced on date 15.09.2022 and working OK.

19

Safety seminar organized by Sr.DME/O&F UMB at Lobby CDG and Lobby BTI on date 24-09-22 &28-09-22  and counseled the Running staff to prevent SPAD cases & about safe train operation.

20

05 LEDs have been procured on 28.10.2022 and provided on  major lobbies i.e UMB,SRE,BTI,CDG&KLK of UMB division for counseling of running staff.

21

05 nos. of Safety seminar organized by Sr.DME/O&F UMB and ADME/OP/UMB over UMB division during the month Oct.2022.

22

35 nos. of Full body hornless safety belts have been received on 31.10.2022 for all ART’s over the division.

23

Railway owned Electronic in motion weigh bridge (WIMWB) has been commissioned at KJGY line no.15 on 19.11.2022.

24

Signal location booklets have been issued to all running staff during the month Nov.2022.

25

140 nos. bags for fog safe device have been procured on 12.11.2022 and provided to all lobbies over UMB division.

26

28 nos., 26 nos. and 14 nos. new office/visiting chairs for loco and lobby office UMB, SRE and CDG have been provided on 19.11.2022, 15.11.2022 and 20.11.2022 respectively.

27

02 Nos. of new Dining tables and 03 Nos. of new center tables have been provided at  RR/CDG on 18.11.2022.

28

02 nos. of new steel Almirahs have been procured for lobby CDG on 18.11.2022.

29

Separate female washroom has been provided at crew lobby CDG

30

In view of ban of single use plastic, paper straws for BA test of running staff have been provided at all lobbies over UMB division.

31

08 nos. (05 nos. of  15 Litres & 03 nos. of 25 litres) of electric geyser has been provided at R.Room UMB.

32

68 nos. of steel beds received at running room UMB & 49 nos. for running room DUI. 

33

During the month December 2022 ,02 nos. of safety seminar organized by Sr.DME/O&F UMB at BTI & SRE and 01 safety seminar by ADME/OP/UMB at CDG.

34

During the month Jan.2023 safety seminar organized at BTI lobby by Sr.DME/O&F/UMB.

35

66 nos. steel beds have been provided at RR/UMB.

36

02 nos. leg massager and 02 nos. exercise bike has been provided at RR/UMB on 18.01.2023.

37

116 nos. of mattresses have been provided at RR/SRE

38

One pitless EIMWB has been commissioned at KJGY line no.15 on  19.11.2022 & FOIS connectivity has been provided on 14.12.2022

39

SPARMV SRE coach no. 8639 DPC(tool van+8295 medical van)has been sent for POH at charbagh workshop LKO on 27.01.23.

40

Attached toilet bathroom has been provided with room no.1 for female running room CDG on 21.02.2023.

41

During the month three safety seminar organized by Sr. DME/O&F/UMB at lobby UMB,SRE &BTI on date 19/2,21/2 &25/2/23 respectively.

 

42

740 Nos. Bathroom Slippers have been provided to all running rooms over Ambala Division

43

01 New power pack(LUKAS) for HRD of ART/BTI was received on 16.06.2023 and successfully commissioned on 27.06.2023

44

1028 batteries for VHF sets have been received on 27.06.2023.

45

06 Nos. safety seminar organized by officers of Mech.(O&F) UMB during June 2023

46

03 Nos. safety seminar organized by officers of Mech.(O&F) UMB during July 2023





Source : Northern Railways / Indian Railways Portal CMS Team Last Reviewed : 28-08-2023  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.