Safety Reliability Improvement Action Plan & PRIME for 2023-24 |
| | | | | |
S.No | ITEMS | Units | Target | Commulative progress | |
A) | PRIME FOR 2023-24 UMB | | | | |
1 | Replacement of identified defective cable | Km | 20 | 3.75 | |
2 | Replacement of over aged defective Point Machines | Nos. | 41 | 8 | |
3 | Replacement of Point Machines i.c.with Thick Web Switches | Nos. | 12 | 2 | |
4 | Automatic Fire detection and Alarm system | Stns | 28 | | |
5 | Testing of Safety Integrity of Stations | Stns | 1 | | |
6 | Block Proving (BPAC) media redundancy OFC & Quad | B/Sec | 8 | | |
7 | Block Proving with equipment redundancy SSDAC/HASSDAC | B/Sec | 2 | 2 | |
8 | Provision of Sliding Boom at Interlocked Level Crossing gate | Nos. | 0 | | |
9 | Failure Alarm for Track Feed battery chargers | Stns | 5 | | |
10 | EI Modifications-departmentally for minor alterations | Alteration | 2 | | |
11 | Provision of Remote Terminal Unit (Data Loggers) at Interlocked LC gates and IBS | Nos. | 5 | | |
12 | Implementations Remote Diagnostic and Predective Maintenance for improving Operating cost | Stn | 0 | | |
13 | Monitoring of ELD through Data Logger | Stns | 0 | | |
14 | Provision of AC in Relay Room | Stns | 0 | | |
15 | Safety Alarm Generation for 10 identified items and extension of SMS alerts to Safety Deptt (Rly Bd letter no. 2020/Sig/18-6/Data Logger/1 dt. 31.01.20) | Items | 0 | | |
16 | Monitoring of Mid Block Section Power Supply : LC Gate | Nos. | 15 | | |
17 | Monitoring of Mid Block Section Power Supply : IBS | Nos. | 0 | | |
18 | Implementation of standard Typical Circuit | Stn | 0 | | |
19 | Ring arrangement for Power Supply to functions ay <100 Route station (Utilizationsing of existing spare cable) | Stns | 6 | | |
20 | Replacement of Analog Axle Counter for Block Working | B/Sec | 8 | 2 | |
21 | Replacement of Analog Axle Counter for Track Circuits | Block Sec | 4 | | |
22 | Implementation of Auto Resetting arrangement where dual detection available | B/Sec | 0 | | |
23 | Provision of IPS at LC Gates | LC Gates | 5 | 1 | |
24 | Provision of IP-67 Point Machines/Motors at Water logging prone areas | Nos. | 27 | | |
25 | Overhauling of Lever Frames | Nos. | 26 | | |
26 | Overhauling of SM Slide Frames | Nos. | 4 | | |
27 | Overhauling ofNTI | Nos. | 0 | | |
28 | Overhauling ofSGE | Nos. | 0 | | |
29 | Overhauling ofTLI | Nos. | 2 | | |
30 | Testing of Signalling Cables | % | 100 | | |
31 | Replacement of overaged LEDs | Signal Aspect | 1000 | 19 | |
32 | Replacement of overage batteries of Track Cct | Nos. | 1062 | 20 | |
33 | Replacement of track relays (> 12 Yrs) | TC | 247 | | |
34 | Provision of ELB | LCs | 5 | 1 | |
35 | Replacement of 2000 Spec IPS | Stn | 0 | | |
36 | Replacement of Class B, C and D Protection device >5 year old with indication type SPD | Stn/RH/ LC | 25 | | |
37 | Modification of IPS 2004 Spec to suit 2012 Spec | IPS | 0 | | |
38 | Dual Detection for IBS | IBS | 0 | | |
39 | Changeover Arrangement from OFC to Quad and Vice Versa | Block Sec | 0 | | |
40 | Axle Counters on Metal Bridges | TC | 5 | | |
41 | Provision of Automatic Fuse Changeover | Stn | 5 | | |
42 | Replacement of NTI B/Instt with BPAC | Nos. | 7 | | |
43 | Replacement of TLI B/Instt with BPAC | Nos. | 5 | | |
44 | Replacement of SGE B/Instt with BPAC | Nos. | 2 | | |
45 | Provision of Point Reversal System | Stns | 0 | | |
46 | Provision of Remote Dignostaic System | Nos. | 0 | | |