SN | Key Performance Indicator (KPI) | Target for 2022-23 |
1. | Modification in Rajdhani coaches as per RDSO/PE/MS/ AC/0080-2019 (Rev-1) dated 12.03.2020 for Push-Pull mode of operation. | 43 Coaches 04 Power Cras |
2. | Replacement of over aged RMPUs (Rly Bd Bulk RSP (40 nos RMPU) | 20 Coaches |
3. | Provision of CCMS in AC coaches. | 210 Coaches |
4. | Modification of back feed power supply in Power Cars. | 151 Power Cars |
5. | Replacement of 70 Ah Battery in LHB AC Coaches. | 50 Set |
6. | Replacement of Type J LED light in Power Car luggage room (724 nos.) | 140 Power Cars |
7. | Replacement of PACIL lights in coaches. (2100 nos.) | 1050 coaches. |
8. | Replacement of AEL Type-1 light | 300 nos |
9. | Replacement of LED tail lamps in RA & Power Car (120 nos). | 40 nos. |
10. | Water leakage dropping inside the coach/Switch Board cabinet from Roof. | Zero. |
11. | Effective Saksham training to staff to make them Saksham | 500 nos Staff. |