Assets Details of TRD/MB:- S.N. | DESCRIPTION | TOTAL | Detail | 1 | OHE/PSI Depot | 17 (2 non operational) | Operational : SAN, HRI, RAC, BE, RMU, MB, NBD, RK, JWP, HRW, AMRO, HPU, CPS, SPC, CH Non-Operational : BLM, MLW | 2 | traction sub station | 17 (04 under construction) | Operational : UTA, KUF, RAC, RYS, SAR, KNT, FZL, RK, JWP, KFPR, HPU, GLH,HMP Non-Operational : AFR, MLW, DN, SISN | 3 | Switching Sub Station | 91 (11 under construction) | Additional 9 No.SSP and 2 SP will be commissioned in next 6 months | 4 | remote control center | 1 | MB | 5 | 4-wheeler tower wagon | 8 | CPS, NBD, SPC, BE, RMU, SAN, SPC, JWP | 6 | 8-wheeler tower wagon | 11 | RAC, JWP, CH, MB, RK , HRW, AMRO, HRI, HPU, BE, MB |
Electrification in Last Four Years : S.No. | Financial Year | Electrified RKM | Electrified TKM | 1. | 2018-19 | 127.45 | 140.94 | 2. | 2019-20 | 69.4 | 126.97 | 3. | 2020-21 | 208.48 | 272.153 | 4 | 2021-22 | - | 36.833 | Total | 405.33 | 576.896 |
Sections Targeted in FY 2021- 22 : S.No. | Section | RKM | Electrified TKM | Executing Agency | 1. | CH-HGJ Section | 82.17 | 89.55 | RE-UMB | 2. | RJK-SHTS Section | 23.08 | 23.66 | RE-UMB | 3. | RAC-SPC Doubling (Excluding BRTA-JBG Doubling) | - | 89.25 | Const./MB | Total | 105.25 | 202.46 | |
TRD STAFF STRENGTH Name | RKM | TKM | Staff Strength | Sandila (SAN) | 67 | 154 | 25 | Hardoi (HRI) | 66 | 150.5 | 29 | Roza (RAC) | 55 | 186.4 | 37 | Bareilly (BE) | 93.88 | 209.31 | 43 | Rampur (RMU) | 63 | 159.19 | 31 | Moradabad (MB) | 78 | 207 | 42 | Najibabad (NBD) | 94 | 206 | 26 | Roorkee (RK) | 63.56 | 156.86 | 22 | Hapur (HPU) | 162 | 292.6 | 37 | Jwalapur (JWP) | 32 | 83.102 | 23 | Harrawala (HRW) | 63.7 | 91.2 | 13 | Amroha (AMRO) | 59 | 152 | 28 | Sitapur City (SPC) | 78.6 | 153.474 | 18 | Chandpur Siou (CPS) | 93.95 | 103.94 | 18 | Balamau | 79.77 | 85.424 | Not operational (Look After by Sitapur Depot) | Mallawan | 79.77 | 85.424 | Not operational (Look After by Sandila Depot) | Chandausi (CH) | 74.2 | 97.8 | 20 | Sr.DEE/TRD Office | - | - | 11 | TPC/RCC-MB | - | - | 40 | TOTAL | 1303.43 | 2574.22 | 463 |
Innovation Done by TRD Department HIS System : vMeasurement of Height, implantation and stagger of OHE v Can easily measure OHE parameters at 100 Kmph speed of Tower Wagon vReduce the manpower and block requirement for OHE parameter measurement v Analyze and sort out the parameters which are out of order.

AT Supply Status Checking Device
This system is used to monitor the real-time availability of 230 V supply from Auxiliary Transformer. Whenever the Voltage at LT side of Auxiliary Transformer is below 150V it generates a telephonic text message regarding failure of 230V AC incoming power supply to Traction Power Controller at Moradabad. Hence, it helps in taking immediateaction by the concerned field staff. 