SPECIAL WORKS DONE BY TRD DEPARTMENT IN THIS FY 2022-23
S.No. | Special Work |
1. | CRS Inspection of Doubling of NERI-SPC Section (TKM:33.168) was sucessufully done on 11.04.2022 |
2. | Work of provision of Buried rail in all SP/SSP of Moradabad Division was completed |
3. | Electrification of 2 No. siding (i.e. ATLP Siding and JPL Siding of approx TKM 0.35 and 0.107 respectively) by Division itself. |
4. | Electrification of RAC Station lines and BLM Washing line was successufully done |
5. | 2 new relay Panels with Numerical relays installed at GLH/TSS, SAR/TSS because of these new panels the fault segregation has become fast and reliable. The old static relays were unreliable and less accurate. |
6. | Upgradation of SCADA system with 0130 Rev 2 has been commissioned in MB-GZB main Line section. This has increased the speed, accuracy and reliability of remote operation of switching devices during block and faults. |
7. | Tree Trimming of Approx 4753 No. of Trees were done in this Financial Year. |
8. | Replacement of 13.18 TKM of weak catenary wire in this Financial Year |
9. | Replacement of 160 mm sq G jumper in 1st Sub sector work is under progress in which 309 No. of jumper has been provided out of 536 No. of jumpers |
10. | Replacement of 36 No. of rusted cantilever in this financial year |
11. | Replacement of 95 No. of rusted ACC wire with Catenary wire to avoid failures in polluted zone |
12. | Approx 7000 No. of damaged and rusty No. plate were replaced with new No. plate. |
13. | 7260 No. of PG has been replaced in this financial year during maintenance of jumper. |
CHANGES IN MAINTENANCE PRACTICES
S.No. | Change in Practice |
1. | Foot-patrolling and footplate schedule made for supervisor and monthly monitoring of their inspections done by concerned Officer. |
2. | To reduce the breakdown restoration time Mock Drills are being executed by officers in regular interval. |
3. | Increase in Tower Wagon working instead of Truck movement |
4. | Daily advance block planning sent to operating department for maximum utilization of block |
5. | Thermo-vision checking drive launched for conditional monitoring of all joints and connectors in the section |
6. | Live Line checking of overall section has been done 2 times to arrest the failure prone areas. |
7. | Condition monitoring of Transformers is being done to check the healthiness of transformer of Moradabad Division. |
8. | Replacement of static panel with numerical panel was done to improve the reliability of system. |
9. | Combine working of two to three tower wagons is carried out in sections where blocks are available. This maximizes the output nd helps in liquidating the maintenance of a particular section early. |
10. | Maximum utilization of shadow block in NI work, Girder Launching etc. |
OUTSOURCING STATUS
S.N | Name of Work | Cost of Work | Current Status |
1 | Manning and Housekeeping of TRD Depots over Moradabad Division | Rs 3.61 Crore | Work is under progress |
2 | Manning and Housekeeping of Traction Sub-Stations Over Moradabad Division | Rs 2.88 Crore | Work is under progress |
3 | Outsourcing of PSI Maintenance Activities over Moradabad Division | Rs 4.16 Crore | Work is under progress |
Major Constraints of TRD Department :
S.No. | Constraint | Action Plan |
1. | Creation of Posts | Case for Post Creation of 200 No. Posts is under HQ |
2. | Shortage of officer 2 No. | Proposal for creation of one post of ADEE and one post DEE sent to HQ |
3. | Non Availability of SCADA in newly Electrified section of GJL-MZM, MB-CH CH-HGJ, NBD-KTW | RE/UMB and Const. being chased to complete SCADA Work |
4. | Requirement of 6.734 Crore in FY 2022-23 | For Revenue (contractual payement) |
5. | Tower Wagon Siding Connectivity Isuue in Hapur, Rajghat, Chandausi, Chandpur Siou, Balamau and Mallawan | RE/UMB and RE/LKO being chased to complete this connectivity of Tower Wagon shed |
6. | Construction of TSS in, Dhanari and Sisauna | RE/UMB being chased to complete this construction of TSS work |
7. | Revision of Contractual Demand at TSS with Open Access like at UTA/TSS, KUF/TSS and KNT/TSS |