Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter Find us on Youtube View Content in Hindi
National Emblem of India

About Us

NR H.Q.

Divisions

Passenger & Freight services

News & Recruitment Info

Tenders

Contact Us

Divisions
   Moradabad Division
      Electrical(TRD)
         Vision & Mission


 
Bookmark Mail this page Print this page
QUICK LINKS
Vision & Mission

SPECIAL WORKS DONE BY TRD DEPARTMENT IN THIS FY 2022-23

S.No.

Special Work

1.

CRS Inspection of Doubling of NERI-SPC Section (TKM:33.168) was sucessufully done on 11.04.2022

2.

Work of provision of Buried rail in all SP/SSP of Moradabad Division was completed

3.

Electrification of 2 No. siding (i.e. ATLP Siding and JPL Siding of approx TKM 0.35 and 0.107 respectively) by Division itself.

4.

Electrification of RAC Station lines and BLM Washing line was successufully done

5.

2 new relay Panels with Numerical relays installed at GLH/TSS, SAR/TSS because of these new panels the fault segregation has become fast and reliable. The old static relays were unreliable and less accurate.

6.

Upgradation of SCADA system with 0130 Rev 2 has been commissioned in MB-GZB main Line section. This has increased the speed, accuracy and reliability of remote operation of switching devices during block and faults.

7.

Tree Trimming of Approx 4753 No. of Trees were done in this Financial Year.

8.

Replacement of 13.18 TKM of weak catenary wire in this Financial Year

9.

Replacement of 160 mm sq G jumper in 1st Sub sector work is under progress in which 309 No. of jumper has been provided out of 536 No. of jumpers

10.

Replacement of 36 No. of rusted cantilever in this financial year

11.

Replacement of 95 No. of rusted ACC wire with Catenary wire to avoid failures in polluted zone

12.

 Approx 7000 No. of damaged and rusty No. plate were replaced with new No. plate.

13.

7260 No. of PG has been replaced in this financial year during maintenance of jumper.

CHANGES IN MAINTENANCE PRACTICES

S.No.

Change in Practice

1.

Foot-patrolling and footplate schedule made for supervisor and monthly monitoring of their inspections done by concerned Officer.

2.

To reduce the breakdown restoration time Mock Drills are being executed by officers in regular interval.

3.

Increase in Tower Wagon working instead of Truck movement

4.

Daily advance block planning sent to operating department for maximum utilization of block

5.

Thermo-vision checking drive launched for conditional monitoring of all joints and connectors  in the section

6.

Live Line checking of overall section has been done 2 times to arrest the failure prone areas.

7.

Condition monitoring of Transformers is being done to check the healthiness of transformer of Moradabad Division.

8.

Replacement of static panel with numerical panel was done to improve the reliability of system.

9.

Combine working of two to three tower wagons is carried out in sections where blocks are available. This maximizes the output nd helps in liquidating the maintenance of a particular section early.

10.

Maximum utilization of shadow block in NI work, Girder Launching etc.

OUTSOURCING STATUS

S.N

Name of Work

Cost of Work

Current Status

1

Manning and Housekeeping of TRD Depots over Moradabad Division

Rs 3.61 Crore

Work is under progress

2

Manning and Housekeeping of Traction Sub-Stations Over Moradabad Division

Rs 2.88 Crore

Work is under progress

3

Outsourcing of PSI Maintenance Activities over Moradabad Division

Rs 4.16 Crore

Work is under progress

Major Constraints of TRD Department :

S.No.

Constraint

Action Plan

1.

Creation of Posts

Case for Post Creation of 200 No. Posts is under HQ

2.

Shortage of officer 2 No.

Proposal for creation of one post of ADEE and one post DEE sent to HQ

3.

Non Availability of SCADA in newly Electrified section of GJL-MZM, MB-CH CH-HGJ, NBD-KTW

RE/UMB and Const. being chased to complete SCADA Work

4.

Requirement of 6.734 Crore in FY 2022-23

For Revenue (contractual payement)

5.

Tower Wagon Siding Connectivity Isuue in Hapur, Rajghat, Chandausi, Chandpur Siou, Balamau and Mallawan

RE/UMB and RE/LKO being chased to complete this connectivity of Tower Wagon shed

6.

Construction of TSS in, Dhanari and Sisauna

RE/UMB being chased to complete this construction of TSS work

7.

Revision of Contractual Demand at TSS with Open Access like at UTA/TSS, KUF/TSS and KNT/TSS




Source : Northern Railways / Indian Railways Portal CMS Team Last Reviewed : 25-10-2023  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.