Electrical Department Firozpur Division
1.0Organization:
Electrical department is headed by Sr. Divisional Electrical Engineer and assisted by Two Divisional Electrical Engineer posted at Sri Mata Vaishno Devi Katra & Firozpur and One Assistant Divisional Electrical Engineers posted at Amritsar.
Organizational setup
Sh. Vipin Dhamanda
Sr.DEE/G/FZR
Sh. Amit Ranjan Sh. Pradeep Kumar Sh. Sudesh Kumar
DEE/G/FZR ADEE/G/ASR DEE/G/SVDK
Major activities of Electrical General Department are maintenance of power supply arrangement and maintenance of coaches. The power supply department has been divided into 11 activity zones viz: Firozpur, Amritsar, Pathankot, Baijnath Paprola, Jalandhar, Ludhiana, Jammu Tawi, Udhampur, Shri Mata Vaishno Devi Katra, Banihal & Budgam. The overhauling and repair of Oil Engines and Pumps of division (except for Katra, Banihal & Budgam Depots) has been centralized at Jalandhar City, under the charge of Sr. Section Engineer/Oil Engines & Pumps. Division has four major coaching depots at Firozpur, Amritsar, Jammu, Shri Mata Vaishno Devi Katra.
The department has sanctioned staff strength of 1927 Nos. & on roll staff is 1390 Nos.
S no. | Designation | SS | OR | Vac. |
1 | Supervisor | 157 | 133 | 24 |
2 | Staff | 1724 | 1225 | 499 |
3 | Ministerial Staff | 46 | 32 | 14 |
Grand Total | 1927 | 1390 | 537 |
2.0 Assets of Electrical General Power Supply:
Major Assets over Firozpur Division |
S.N. | Asset Description | Qty |
1 | Railway Stations | 262 |
2 | Railway Quarters | 11689 |
3 | Service Buildings | 313 |
4 | Electric Sub Stations | 85 |
5 | HT Connections | 71 |
6 | LT Connections | 884 |
7 | Transformers | 136 |
8 | DG Sets under SSE/OE&P/JUC | 113 |
9 | Pumps (1.5 hp) under SSE/OE&P/JUC | 284 |
10 | Pumps (Submersible) under SSE/OE&P/JUC | 154 |
11 | Window Air Conditioners | 549 |
12 | Split Air Conditioners | 318 |
13 | Water Coolers | 214 |
14 | Solar Plants Capacity (10kW & above) | 3044 kWp |
15 | Lifts | 13 |
16 | Escalators | 18 |
17 | HT Crossing Lines (Overhead & Underground) | 910 |
18 | AT Panels | 234 |
19 | High Mast Towers | 142 |
3.0 Coaching Infrastructure over Firozpur Division
a) | Major Coaching Depot | Shri Mata Vaishno Devi Katra, JammuTawi, Amritsar, Firozpur |
b) | Other Coaching Depots | Pathankot (NG) |
c) | Stations with staff for train passing duties | Udhampur, Ludhiana &JalandharCity |
3.1 Primary Trains:- 44 Nos.
3.2 Primary Rakes:- 66 Nos.
3.3 Primary Coaches: 1285 Nos.
3.4 Secondary Coaches: 1005 Nos.