Telecom Highlights for the Month of APRIL-2024 to Nov 24

1.Railnet connectivity provided at 5 locations (ASR- SDH, ASR-WS, ASR-M, JUC, JRC) for HMIS connectivity over FZR div.

2.LMC provided for provision of SCADA at 3 locations over FZR division departmentally (BEAS/SP, BGTN/SP, DUQ/TSS).

3.LMC over two separate routes for CMS lobby provided at BJPL station.

4.BAHL-SGDN (48 kms) section taken over from USBRL project by division open line staff. The equipments taken over are as below-

a)2 nos 6 -quad cables (1.4mm) each in all 3 sections BAHL-Khari, Khari-Sumber & Sumber-Sangaldan.

b)2 nos OFC cable each in all 3 sections BAHL-Khari, Khari-Sumber & Sumber-Sangaldan.

c)STM-4 (Tejas Make) along with V-Mux (Puncom Make) at BAHL, Khari, Sumber & Sangaldan along with 48V/50 Amp charger (Make- Statcon) & 48V/200Ah batteries.

d)24 nos CGS each at Khari, Sumber & 72 nos of CGS at Sangaldan.

e)1 no. GPS clock at Khari, Sumber & 2 nos GPS clock at Sangaldan.

f)1 no. 3 line Platform display board each at khari, Sumber & Sangaldan.

5.Railnet connectivity provided at 3 locations (FZR- Divisional Hospital, PTH- Health Unit, BJPL- Health unit) for HMIS connectivity over FZR div (Total 8 out of 13 sites commissioned till date).

6.LMC over two separate routes for CMS lobby provided at JUC (laying 400 mtrs OFC), SVDK, BDGM, ASR (laying 200 mtrs OFC), FZR (laying 500 mtrs OFC), PTK (laying 500 mtrs OFC) station (Total 8 out of 9 sites provided with LMC over two separate routes as per HQ policy).

7.Insulation improvement work of Quad cable in BEAS-BTR section from 5 M ohm to 20 Mohmby replacement of 11 old joints.

8. Monitoring of OFC for distributed EI through data logger done at ATT, CIA.

9.New Puncom V Mux installed at BTR, TRA, JNL & MOW stations and shifted all Signalling gears (SSDAC, Data logger) on it.

10.Insulation improvement work of Quad cable in PTKC-KNDI section from 2 M ohm to 20 Mohmby replacement of 7 old joints and 250 mtrs cable replacement departmentally.

11.Approx. 950 mtrs 6-quad cable replaced on bridge no. 84 in LNK-GOD section and protected with GI pipe.

12.Insulation improvement work of Quad cable in NAS-HSX section from 6 M ohm to 27 Mohmby replacement of 5 old joints and 500 mtrs cable replacement departmentally.

13.6- Quad cable laid (approx. 200 mtrs) departmentally to provide LMC for SCADA connectivity at KDSB/SSP.

14.UTS link between NAS-KUPR shifted from BSNL media (64 kbps) to Railway OFC Media (2 Mbps).

15.UTS link between JUC-SQR, SQR-LNK & LNK-GOD shifted from BSNL Media (64 kbps) to Railway OFC Media (2 Mbps).

16.OFC Channels provided for new SSBPAC & HASSDAC with changeover in AWL-KKL section.

17.STM-4 installed at 10 Stations: BRML, HME, MZMA, BDGM, SINA, PMPE, KAPE, ATPA, SDUA, QG in BAHL-BRML section.

This has enhanced the reliability of MSDAC, UFSBI, D/L, UTS, Control Communication, SCADA Long Haul as well as Short Haul, Puncom and Webfill Mux (with all channels) etc by providing protection path to all these vital circuits through existing Dark Fibre at E1 level as well as Optical Level.

18.LMC provided for SCADA connectivity at Vain Puin Halt/SSP by laying 350 mtrs OFC cable departmentally.

19.100 mtrs 6-quad cable replaced departmentally b/w Bharoli-Sujanpur section for insulation improvement work from 6 M ohm to 20 Mohm.

20.OFC (=700 mtrs) laid departmentally for shifting of PMS connectivity from copper media to OFC at Ludhiana station.

21.CMS and PRS connectivity at Hoshiarpur station shifted from BSNL media to Railway media and kept under observation.

22.CMS and UTS cum PRS connectivity at Lohian Khas station shifted from BSNL media to Railway media and kept under observation

23.6 Quad cable insulation improvement work in Amritsar-Chheharta section from 2 Mohms to 25 Mohms by replacing 4 nos old Derivation joints and 1 straight joint departmentally.

24.New 3 KVA installed at Amritsar Microwave for FOIS system back up.

25.4- Quad cable (=150 mtrs) replaced and 4 old straight joints removed departmentally between Jalandhar Cantt-Chiheru section for insulation improvement from 12 Mohms to 25 Mohms.

26.6 -Quad cable replaced (=2.5 kms) in Mukerian-Bhangala section for insulation improvement work.

27.6 -Quad cable replaced (=3 kms) in Vijaypur Jammu- Samba section for insulation improvement to 150 Mohms and elimination old 10 joints in this patch.

28.    Automatic fire detection and alarm system was installed in OFC room at Mauli, Goraya, Lohian Khas, Suchi Pind, Samba, Ghaghwal, Hiranagar stations.

29.TMS shifted to Railway Media from V-SAT at Patti station and kept under observation.

30.UTS shifted on Railway Media (Ethernet Channel) from BSNL 64 kbps leased line at Dera Baba Nanak station and kept under observation.

31. Datalogger connectivity shifted to EI from 64 kbps channel b/w Jalandhar Cantt-Chiheru, Suranasi-Kartarpur, Kartarpur-Hamira sections.

32.Additional EI provided on Railway OFC media b/w Ludhiana-Jagraon for PRS/UTS to improve reliability of circuit.

33.   UTS/PRS circuit at Jalalabad, Guru harsai, Laduka and Fazilka shifted on Railway E1 from BSNL 64 kbps leased line circuit and kept under observation.

34.UTS/PRS circuit at Firozpur Cantt- Firozpur City, Firozpur Cantt- Makhu, Bariwala- Muktsar, Muktsar-Lakhewali, Lakhewali- Fazilka shifted on Railway E1 from BSNL 64 kbps leased line circuit.

35.Connectivity of UTS/PRS circuit b/w Malsian Shahkot – Nakodar station shifted on Railway E1 from BSNL 64 kbps leased line circuit.

36.Datalogger connectivity shifted to E1 from 64 kbps channel b/w Jagraon-Chaukiman, Chaukiman-Mullanpur, Mullanpur- Baddowal block sections, Amritsar-Dinanagar section (8 block sections), Amritsar-Dhilwan (6 block sections) section.

Fibre based internet connectivity provided for integrating IPIS with NTES using Railnet at Pathankot Cantt station

                                                  





Source : Northern Railways / Indian Railways Portal CMS Team Last Reviewed : 29-05-2025  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.