Signal & Telecom


S&T Sanction Strength

UMB DIVN.

Group ‘C’

Group ‘D’

S/Strength

614

432

On Roll

492

324

Vacancy

122

108

   


SIGNAL

1.0

ACHIEVEMENTS:-

1.1

To improve the reliability of Signaling system 251 Nos. Overage secondary cells replaced at CJL-72, UBC-25, YJUD-6, PKY-12, KNZ-14, UMB-12, PTA-55, KLK-55, with this total 886 nos. overage secondary cells have been replaced so far this year.

2.0

To improve the reliability of Signaling system 4 Nos. points replaced with Thick Web Switch (TWS) at BTI-1(PT NO-221A), BTIC-2(PT NO-102 A& 105B), SBJ-1(PT NO-75B), with this 63 Nos. point provided with Thick Web Switch 220mm point machines and modified ground connection this year over Ambala Division.

2.1

To improve the reliability of point, 04 Nos. averaged/defective point machine replaced at SRE-1, SMU-2(PT No-SMU 41B, 47B), SBJ-1(PT NO-77B), with this 40 Nos. overage defective point machine replaced this year over Ambala Division.

2.2

To improve the reliability of Signaling system 70 nos. Main cables tested at KNN-15, DOA-12, SBJ-5, KLSX-21, BARJ-19, with this 1970 No’s Main cable tested in this year.

2.3

To improve the reliability of signaling system 98 nos. Tail cables tested at KNN-26, DOA-21, SBJ-40, BARJ-11, with this 1782 No’s Tail cable tested in this year

2.4

To improve the reliability of power supply, 251 Nos. Overage secondary cells replaced at CJL-72, UBC-25, YJUD-6, PKY-12, KNZ-14, UMB-12, PTA-55, KLK-55, with this total 886 nos. overage secondary cells have been replaced so far this year.

2.5

To improve reliability of signal LED’s, 57 Nos. Signal LED’s have been replaced CDG-17, GHG-11, DUI-1 (LC-53/C), CDG-14, CHMG-1, DUI-1 (LC-53/C), GHG-10, BARJ-2, with this 723 nos. Signal LED’s replaced this year over Ambala Division.

2.6

To improve the reliability of axle counters, 11 No’s Tx and Rx coils replaced in Auto Section-Auto Section -11 Auto Section-8 (508-2, 408-2, 405-2, 510-2), Auto Signal 803-1, CDG-2, with this 103 nos. Tx and Rx coils replaced so far this year.

2.7

To improve reliability of track circuits, 07 Nos. Glued Joint in various engineering works has been replaced at KWT-1, UMB-6, with this 170 Nos. Glued Joint has been replaced this year so far.

3.0

To improve the reliability of track circuits’ 844 Nos. rusty bond wires replaced, SRE-20, KJGY-50, KWT-10, DNX-12, RPHR-3, DUI-29, RAA-24, KES-12, UBC-12, SMU-10, KNN-50,DOA-20,CHA-30,SIR-20,GVG-35, SSW-35,YJUD-101, MFB-25, PKY-30, KNZ-30, JUDW-50, DZP-22, LHM-8, BTIC-35, BTI-40, UMB-36, DKT-34, LLU-15, NMDA-10, KRLI-30,  with this 8567 nos. rusty bond wire replaced so far this year

3.1

To improve the reliability of track circuits 231 no’s cable jumpers replaced at SRE-5, KJGY-1, KWT-12, DUI-20, ALL-8, SMU-10, DOKY-12, KES-10, GVG-18,SIR-7,CHA-10,KNN-4, YJUD-2, PKY-16,KNZ-4, DZP-8, BTI-10, BTIC-20, UMB-16, SBJ-5, SDY-5, PTA-12, JNCV-6, CDG-33, with this 2708 nos. cable jumpers  replaced so far this year.

3.2

To improve the reliability of track circuits 116 no’s double cable jumpers replaced UMB-53, SDY-27, KARR-10, SMRL-10, KMNN-16,   with these 2250 nos. cable jumpers replaced so far this year.

3.3

To improve the reliability of Automatic Fire Detection and Alarm System 04 no’s Fire Detection and Alarm System replaced JNCV-1, NMDA-1, KRLI-1, UHL-1, with these 31nos. Fire Detection and Alarm System replaced so far this year.

3.6

To improve reliability and safety of ELB 12 Nos. boom replaced in ELB at SFMU-1(LC-77 Section-C), BXC-1(LC-39 Section-B & LC-52/C Section-D), GVG-1, KNZ-1, MOT-3(LC NO-C31 & LC NO-C45), BTI-3(LC N0-C140), PTA-4(LC NO-24B, LC NO-16),  with this 78 nos. boom has been replaced so far this year.

3.7

To improve reliability and safety, 170 mtr rusty wire rope RPAR-50(LC NO-49C), UHL-100(LC NO-98B-80, LC NO-97C-20), SOL-20, replaced with this 1533.03 Mtr. rusty wire rope replaced this year so far over Ambala Division

3.8

To improve reliability and safety, 0.390 Kms. Rail Replacement work done with coordination of S&T staff at UMB-0.390, with this.3.816 Kms. Rail Replacement work done this year so far over Ambala Division


TELECOM


· 1417 Nos. New CUG SIMS (AIRTEL) has been provided to different departments in connection with implementation of the enlarged CUG mobile scheme on Indian Railways.

· Provision of communication facilities has been done in Disaster Room at DRM office control building by providing Telephone connections, Railnet connectivity and 01 no. TV has also been provided. 






Source : Northern Railways / Indian Railways Portal CMS Team Last Reviewed : 01-12-2023  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.