TELECOM ACHIEVEMENTS 2022-23
A.VIP FUNCTIONS
1.1.Video Clips related to YOGA in c/w YOGA Day Celebrations have been played successfully on Video Wall at KLK & SML and on Plasma TV at UMB, CDG, SIR, DUI, RPJ, SIR, SRE &BTI Railway stations.
1.2.In connection with flagging off of Train between Ambikapur &HazratNizamuddin by Hon’ble Minister for Railway on Dt. 14.07.2022. VC Equipments like Video Camera along with two codec on tripod, UPS, Switches for fiber connectivity, 55 & 43 Inch LED Display, PA System and Railnet facilities of bandwidth 100 MBPS on 14.07.2022 in c/w Hon’ble MR visit were successfully provided at ORH/Saharanpur in close coordination with RCIL.
1.3.VC Equipment, Video Camera along with two codec on tripod, UPS, Switches for fiber connectivity and Railnet facilities at Sunam Udham Singh Wala Railway station and PA system at Kalka Railway Station on Dt. 23.7.2022 were successfully provided in connection with celebrations regarding Iconic week of “Azadi ka Amrit Mahotsav & Azadi Ki Rail Gadi Aur Stations - Celebration Week (18thto 23rd July, 2022)”on Dt.23.7.2022 in close coordination with RCIL.
1.4.Audio Clips regarding YOGA Day celebrations & ensuring security of Railway Property has been uploaded in Database of IPIS/Auto announcement system & played at 22 Railway stations over UMB Division.
1.5.Video Clips related to Azadika Amrit Mahotsav Celebrations have been played successfully on Video Wall at KLK & SML and on Plasma TV at UMB, CDG, SIR, DUI, RPJ, SIR, SRE &BTI Railway stations.
1.6.Video Clips related to Partition Horror Remembrance Day & Har Ghar Tiranga and videos in IRCDMA have been played successfully on Video Wall at KLK & SML and on Plasma TV at UMB, CDG, SIR, DUI, RPJ, SIR, SRE & BTI Railway stations.
1.7.In c/w Flagging off for newly introduced “Vande Bharat Express Train between Amb Andaura-New Delhi” by Hon’ble Prime Minister of India on Dt.13.10.2022 at Una Himachal Railway station Internet connectivity with 100 MBPS bandwidth from M/S.RCIL and broadband connection of 100 MBPS Bandwidth hired from BSNL for its protection were provided to Door Darshan India for Live Telecast of the event at Una Himachal Railway station. Also announcement system was provided by Division for making announcements related to Flagging OFF Ceremony.
1.8.Playing of Video related to Vigilance awareness on Video Wall at KLK, SML& on True Colour Display boards, Plasma TV at UMB, BTI, RPJ & DUI Railway stations & Audio on all stations of UMB Division was done.
1.9.In connection with Unique Diwali Celebration by handing over Appointment letters to 75000 young people for jobs in various ministries and Government Deptt. virtually by Hon’ble Prime Minister a function was held on Dt.22.10.2022 in Railway Auditorium, Rail Vihar Ambala Cantt which was chaired by Hon’ble Minister of State for Labour and Employment. VC Equipment with all accessories and its standby arrangement i.e. Video Camera, codec, UPS, Switches for fiber connectivity and Railnet connection with 45 MBPS bandwidth via minimum two Geographically separate routes to ensure reliable and uninterrupted connectivity were provided for testing the VC arrangements on Dt.21.10.2022 and Live display on 22.10.2022. Also 40 MBPS Internet connection hired from BSNL was provided for protection of above arrangement of M/S.RCILLarge LED Video Wall along with one 55” LED Display and PA system were provided at venue so as to make the Live view of Addressing by Hon’ble PM convenient for the Candidates participating in the event and their Guardian/Parents and other Dignitories.
1.10.Live streaming of Flagging off of Vande Bharat Trains by Hon'ble PM from Mumbai was successfully done on Video Wall at KLK, SML& on True Colour Display boards,Plasma TV at UMB, BTI, RPJ & DUI on Dt.10.02.23.
B. Achievements
1.1.Shifting of Telecom circuits in connection with Electronic Interlocking:-
1.2.All Telecom circuit equipments like WSE, CNL Phone, 25 Watt VHF Sets, BSNL phone, PA system,Block circuit & L-Xing gate communication have been shifted from Old Station Building to new Station Building along with associated wiring,termination & power supply at Gidderbaha, Panjkosi, Hindumalkote, Fatuhi, Bathinda CanttMandigobindgarh, Khanna & SanehwalRailway stations in c/w work of EI. Also SIR-GVG and GVG-KNN side, SSDAC (SIR side & KNN side), L-Xing gate Telephone, Hotline on OFC& UTS communication were shifted at Mandigobindgarh Railway Station. Also media connectivity has been provided at Doraha in c/w commissioning of UFSBI & SSDAC in DOA-SNL section in c/w NI/EI at SNL.
1.3.All circuits like TC, 25 Watt VHF Sets, BSNL phone, Block circuit(BPAC/UFSBI) KNN-GVG and CHA-KNN side, SSDAC (GVG side & CHA side), L-Xing gate Telephone, Hotline on OFC& UTS communication have been shifted from Old ASM Room to new ASM Room along with associated wiring, jointing of Quad cable & power supply in newly constructed ASM Roomin c/w Commissioning of New Electronic Interlocking at Khanna Railway station.Also OFC System including STM, MUX, FMS along with 48V/ 120 AH battery set and battery charger etc. have been shifted to new OFC room in new station building at Khanna Railway station by laying OFC cable, providing OFC joint enclosure, ARA terminals for Quad cable termination, one normal joint on quad cable
1.4.Shifting of all telecom circuits such as TC,TPC, 25W VHF SET, Auto Telephone,UFSBI,UP HASSDAC main & DUAL and DN HASSDAC main & DUAL on Quad and OFC channel along with associated wiring has been done in new building at NBA & CTW stations in c/w NI for doubling work in NBA-KLSX Section
1.5.Shifting ofTelecom Cables in c/w LHS/ROB/Doubling work.
·Shifting of 6 Quad cable was done at LC 88-C(NLDM-UHL), 168-C(DOA-SNL), L-XING 146-C in SIR-GVG with one EC socketin c/w construction of LHS/ROB by laying 315 Mtrs. Cable and providing 5 Nos. Joints.Also Route diversion OFC has been done at L-XING 146-C in SIR-GVG Block section by laying OFC(160 Mtrs.) 02 Nos.Joint enclosures in close coordination with M/S.RCIL. Shifting of 6 Quad cable was done at Km.359/5-7 in SNL Yard due to LHS work.
·Shifting of 6 Quad cable in c/w doubling work L-Xing No.C-132 at Km.160/6-7 in BCU-BTIC ,NBA-CTW & PUL-LHMBlock sections has been done by laying 1.6 Kms. Quad cable & providing 6 Nos. RTSF jointing kit in close coordination with RVNL.
·Shifting of communication facilities at LC gate 24-C, 28-C & 30-C in PTA-DBN Block section has been done by providing 02 no. Magneto telephones and 6I cell and laying 10 Mtrs.cable and associated wiring in new Gate Goomty due to doubling of track. Also 01 No. Earth electrode provided for cable earth.
·Shifting of 6 Quad cable has been done by laying 216 Mtrs.cable and providing 08 Nos. Joints at L-Xing No.97A Km.210/26&Km No. 198/8-10in KNZ-SSW Block section andL-Xing 106-C in DZP-JUDW, 98-Bin YJUD-JUDWin c/w route diversion of cable & ROB construction work.
·Route diversion of 6 Quad, 4 Quad & OFC cables has been done with RVNL staff from Km.91/13 to 95/6 between ANSB-NLDM section due to proposed loop line work at BNL in close coordination with RVNL
·3x15 meter = 45 meter, 50 pair PIJF cableand 20 meter 100 pair PIJF cables have been replaced by providing 08 nos normal joints at SRE near Lakdi ka Pul in c/w construction of sewerage pipe line.
1.6.Shifting of Block circuits & others on Quad cable:- Block working of 04Sub-Sections i.e. KDZ-KANO, KMTI- BOF, BOF-SOL & KES-DOKYhas been commissioned on newly laid 6-Quad cable in KLK-SML, UMB-SRE sections.Also all Circuits i.e. BPAC, SSDAC, EC, L-XING have been transferred from outlived 4 Quad cable to newly laid 6 Quad cable in CDG-CNDM & RPAR-RTP Block section.
1.7.UTS circuits:- UTS circuit between BTI-SEQ, AHH-KUP, SAG-SFMU, DOC-PTA, NBA-CTW, CDG-MRND, UBC -KNN & NLDM-UMB (34 Block sections) has been transferred from 64 KBPS to 2 MBPS Data rate by providing (34Pairs) 2 MBPS Modems and 2 MBPS channel along with associated wiring on Rly.OFC. Also one Channel hired from BSNL in TPA-PUL has been surrendered.
Shifting of UTS system installation 24U rack,Modem, ROUTER,Switch 24 port and connectivity on E1 channel along with associated wiring has been done in new EI building at NBA & CTW stationduring NI work for doubling work in NBA-KLSX section
UTS circuit has been shifted from VSAT to Railway media at BTIC Railway station therebysaving recurring expenditure towards Annual rent of VSAT
1.8.Datalogger Connectivity:- Datalogger connectivity has been provided at L-Xing 167-C in DOA-SNL section by laying 40 Mtrs. 10 pair PIJF cable from gate goomty to RTU Room. To monitor Charger ON/OFF condition of 48V/25A charger of OFC Eqpt. Datalogger connectivity has been provided at SNL. Networking of Datalogger has been provided at GDB, MOT & PKK Railway stations by hiring 64 KBPS channel from BSNL. Datalogger connectivity has been provided between NBA-CTW and CTW-KLSX Block sections.
1.9.Station to Station Hotline Station to Station Hot line by providing electronic push button magneto telephone on Quad cable has been provided in BTI-KZW, BTIC-BTI & one channel of 64 KBPS on OFC in RPJ-KLI & KLI-DOC, JNCV-KARR(UFSBI) Block sections.
1.10.OFC Channels for Block Circuits/USFSBI
·OFC Channels has been provided for UFSBI and Phone along with associated Wiring up to Relay Rooms and OFC hut etween CDG-SASN, CDG-CNDM & CDG-GHG.
·
·Quad cable has been provided between CTR & UFSBI MUX replacing Cat cable for UFSBI & Block speech at (14 Stns.) namely GDB, MOT, PKK, ABS, PJK, HMK, FTH, SGNR,RPAR, BARJ, MNPR, KRLI, ANSB & CHTL Railway stations to minimize failure due to connectivity
·
1.11.Provision of Control & Block communication in BTI-SGNR section replacing BSNL maintained overhead alignment:- Train Control, Emergency Control & Block circuit have been shifted on Quad cable in BTI-FTH Section by laying 20 Kms. Quad cable for making connectivity/replacing defective cableof already laid Quad cable for L-Xing gate communication through and providing equalizer amplifier along with 120 Nos.derrivation joints. Also 89 Nos. EC Sockets have been provided on already laid 6 Quad cable in BTI-HMK Section
1.12.Insulation Improvement: Insulation of Quad cable has been improved in 49 Block sections by opening cable joints at various locations in section and replacing defective cable.
2.Power Supply:
2.1.Replacement of batteries of various capacities:Batteries being utilized for various Telecom applications have been replaced over UMB Division i.e. 48V/120AH(42 Sets), 48 V/300 AH(4 sets), 12V/36AH(01Set), 12V/26AH(32 Sets), 12V/18AH(13Sets), 12V/60AH/65 AH(17 sets), 12V/7AH(6 Nos.),Walkie-Talkie (800 Nos.) & 12V/120AH (01 Nos.).
2.2.Replacement of Battery charges:- 48V/25A battery chargers (6 Nos.)have been provided at OFC Hut YJUD, KJGY KMNN, JNCV, GILL & MET Railway stations replacing outlived battery charger.
2.3.AT supply has been provided in PORTA Hut DUI for LDH-HSR & SNL in UMB-LDH section by laying 200 Mtrs.Power cable
3.Extra ordinary results in Passenger Amenities:
3.1.Provision of CGS system along with associated wiring as per RDSO Specification No.RDSO/ SPN/TC/61/2012 Rev.4.0 has been done on PF 1, 2 & 3 (71 Nos. CGDB) at SIRHIND Railway station.
3.2.Voice Recording & Modification in database of IPIS for auto announcement, Train Indication Boards, has been done for Train No.14674, 14650, 14507/08, 14711/12, 14887/88, 14645/46, 14662/61, 04524, 04690 at UBC,Train No.14795/14796at Kalka Railway Station for Train No. 22447/22448 at UHL,NLDM.ANSB and RPAR Railway Stations for convenience of travelling public
3.3.Updation of Database of Train No.19411/19412 has been done in auto announcement system at CDG, RPAR, ANSB, NLDM& UHL & Train Display Board in RPAR & NLDM.
3.4.Face to Face enquiry system has been provided at Patiala station to facilitate the travelling public.
3.5.PA system wiring & PF Clock has been shifted on newly constructed FOB between PF1 & 2 by laying 300 Mtrs. PVC Screened cable & 300 Mtrs. Data cable at Dhuri Railway station for convenience of traveling public.PA system wiring has been transferred on newly laid underground cable on PF1,2&3 at Sirhind Railway station.
3.6.04 Nos. horn type speakers & 01 No. Column Speakers have been provided at SAG, LHA, YJUD, DLPC & AADR replacing the defective speakers. 02 Nos New 10 Watt/8 Ohm Specific Speakers have been provided in Coach No.5 of Shatabdi train 12046/45 replacing defective speakers. Also 250 Watt amplifier has been provided replacing defective and outlived amplifier at QRP station.
3.7.Wiring for UTS/PRS system & PA system has been done by laying 150 Mtrs. CAT 6 cable & PVC screened cable along with PVC casing caping 5 Nos.I/O Box for 5 Nos. Counters in c/w construction of new booking office at Rajpura Railway Station. Also wiring for 5 Line Train Display Board has been done by laying 55 Mtrs. Power cable & 30 Mtrs.Data cable. Also wiring for PMS connectivity from UTS/PRS office to Parcel office at UHL has been done by laying 60 Mtrs. Cat-6 cable.
3.8.Manual announcement System has been shifted to ASM office from the closed enquiry window at NLDM station.
4.Economy Measures:
4.1.Scrap Deposited in Store Depot:1258 Kg Non Ferrous scrap, 275 Kg.Ferrous scrap, 1 Kg Copper, 5 Kg. Aluminium scrap & 1555 Mtrs. (477 kg) cable in pieces scrap has been deposited at Dy.CMM/JUDW/Depot.