SN | Key Performance Indicator (KPI) | Target for 2023-24 |
1. | Replacement of over aged RMPUs (Rly Bd Bulk RSP (40 nos RMPU) | 09 Coaches |
2. | Provision of CCMS in AC coaches. | 300 Coaches |
3. | Provision of manual isolating switch with fuse to isolate the DA Set starter motor after start of DA set | 151 Power Cars |
4. | Provision of individual MPCB for water Pumps and shifting of its controller to onboard in set of panels for LHB Non-AC/EOG Coaches. | 200 Coaches |
5. | HOG Modification in Garib Rath Coaches. | 106 Coaches. |
6. | Provision of projected collar for condenser jali in LHB AC Coaches. | 602 Nos. |
7. | Water leakage dropping inside the coach/Switch Board cabinet from Roof. | Zero. |
8. | Effective Saksham training to staff to make them Saksham | 500 nos Staff. |