ELECTRICAL (G)
Staff Strength
Staff | SSE | JE | WM | SBA | Fitter | Fitter | Vehicle Dr. | TLF | ACF | Asstt TL AC | Asstt Pow | Ministerial | Total | SS | 36 | 29 | 107 | 41 | 25 | 16 | 2 | 170 | 136 | 173 | 153 | 29 | 917 | OR | 36 | 29 | 102 | 39 | 24 | 12 | 2 | 159 | 128 | 61 | 80 | 24 | 696 | Vac | 0 | 0 | 5 | 2 | 1 | 4 | 0 | 11 | 8 | 112 | 73 | 5 | 221 |
POWER SUPPLY STATS 1. | Nos. of electrified stations (SEB) | = | 136 | 2. | NSG-2 | = | 02 (CDG, UMB) | 3 | NSG-3 | = | 3 (SRE, KLK, BTI) | 4. | NSG-4 | = | 4 (RPJ, SIR, PTA, ABS) | 5 | NSG-5 | = | 22 | 6 | NSG-6 | = | 102 | 7. | Nos. of stations provided with 100%LED lights | = | 136 | 8. | Nos. of Escalators | = | Total = 14 Nos. 8 (CDG), 2 (UMB), 2 (SRE), 2 (BTI) | 9 | Nos. of Lifts | = | Total = 15 Nos. 2 (CDG), 4(UMB), 2(SRE), 2 (BTI), 3 (SASN) 1 (Divisional Hospital UMB) 1 (DRM Office) | 10 | Total connected load | = | 37437 KW | 11 | Average monthly consumption | = | | 12. | Avg. Monthly Electricity Bill | = | Rs.198 Lacs | 13 | Monthly Recovery from Qrs and outsiders | = | Rs. 87 Lacs | 14. | Nos. of electrified quarters | = | 14148 | 15 | Nos. of stations provided with 10 KWp solar power system | = | 11 (SFM, MET, RPHR, LHM, TPA, BTIC, PJK, NBA, PUL, CNDM, SAG) | 16. | Nos. of stations provided with 3 KWp solar power system | | 18 Nos. (KLK-SML section) | 17. | Roof Top Solar Power Plant (On-grid) Commissioned | = | Total 2.706 MWp - DRM Office 115KWp,
- UMB 540KWp,
- DKT 45KWp,
- PTA 75KWp,
- BTI 216KWp,
- CDG 330KWp,
- ABS 50KWp,
- SML 160KWp
- UBC 70KWp,
- SRE 485KWp,
- Loco Shed/KJGY 540KWp
- YJUD 80KWp
| 18 | Nos. of manned L-xing Gates | = | 328 | 19 | Nos. of Manned L-xing Gates Electrified | = | 328 | 20 | Nos. of water coolers | = | 159 | (a) | For passenger Amenity | = | 89 | (b) | For staff Amenity | = | 70 | 21 | Nos. of Air Conditioners | | | (a) | Window type | = | 472 | (b) | Split type | = | 302 | (c) | Package type | = | 17x3 (AC Plant)+ 11x3 (AC plant) (DRM office) | | (d) | VRF type | = | 10 ton x 2 | 22 | Nos. of Refrigerator | = | 60 | 23 | Nos. of DG sets (3 phase) Installed | = | 53 | 24 | Nos. of DG sets with AMF panels | = | 35 | 25 | Nos. of sub. Station | = | 39 | 26 | Nos. of HT Connection | = | 18 | 27 | Nos. of LT Connection | = | 391 | 28 | Nos. of HT Panel | = | 40 | 29 | Nos. of LT Panel | = | 206 | 30 | Nos. of Transformer Installed | = | 87 | 31 | Total Capacity of Installed Transformers | = | 45777 KVA | 32 | Intensity of utilization (KWH/KW/Month) | = | 121.31 | 33 | Nos. of ATs | = | 231 | 34 | Length of HT overhead network | = | 16 Kms. | 35 | Length of LT overhead network | = | 280 Kms. | 36 | Cable length (HT) | = | 47 Kms. | 37 | Cable length (LT) | = | 2234.5 Kms. | 38 | Nos. of Pumps | | 205 | a) | Submersible | = | 198 | b) | Horizontal shaft | = | 7 (Kaushalaya bed at Kalka) | 39 | Pump Automation | | | a) | With GSM | = | 50 | b) | With timer | = | 2 | d) | ASM Control | = | 154 | 40 | Nos. of Tower | = | 176 Nos. | 41 | Nos. of Lights on Tower | = | 973 Nos. | 42 | Nos. of washing line | = | 13 Nos. | 43 | Nos. of Running room | | 7(SRE,UMB,DUI,BTI,CDG,NLDM,SML) | 44 | Nos. of RRI building | | 5(SRE,UMB,BTI,CDG,DUI) | | | | | | |
Source : Northern Railways / Indian Railways Portal CMS Team Last Reviewed : 26-05-2023
|
|
|