Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter Find us on Youtube View Content in Hindi
National Emblem of India

About Us

News & Recruitment Info

Tenders

Passenger Info

Kalka Shimla Railway Heritage Site

Contact Us

About Us
   Organizational Structure
      DRMs
         Delhi Division
            Electrical TRD


Goto Yahoo!!


 
Bookmark Mail this page Print this page
QUICK LINKS
Electrical TRD

Electrical – Traction Distribution (TRD)




1.0 Performance


Description

2017-18

(up to February 2018)

2018-19

(up to February 2019)

Internal Failures (in nos.)

9

6

External Failures (in nos.)

11

9

Punctuality losses (nos.)

66

137

AOH of OHE in TKM

762.28

842

POH of OHE in TKM

280.86

350.60

POH of ATD (in nos.)

470

409

POH & Checking of Gantries (in nos.)

49

39

Energy Bill paid (in Crores)

249

205


 2.0 Improvement and Reliability Action Plan


S.N.

Description

Target for year 2018-19 (up to February)

Progress during 2018-19 (up to February)

1

Replacement of contact wire having brazed joints (in Km)

46

48.61

2

Replacement of overaged/ weak Catenary wire (in Km)

9

9.22

3

Replacement of corroded steel anti-creep wires with copper catenary wire (in nos.)

23

23

4

Removal of insulated catenary/ insulated tapes from catenary wire (in nos.)

73

70

5

Checking & calibration of protection relays at specified interval (in nos.)

13

13

6

Live line checking by tower wagon

772

934

7

Current collection Test

772

886

8

Provision of composite insulators in polluted and vandal prone area (in nos.)

367

662

9

Provision of missing bonds (in nos.)

1400

5633

10

Provision of Disconnector  for lightening arrester as per RDSO TI/MI /0048

46

57

11

Replacement of old designed RRA clamps with modified RRA clamp

138

119




3.0 Infrastructural Overview

3.1 Section Wise

There are 12 OHE maintenance depots, 7 PSI depots, 01 Remote Control Centre and 01 maintenance Workshop-cum-Store.


Item

DLI area

DUK section

TKD-PWL

SSB-BTI

GZB –TPZ

ROK-RE

DEE-RE

KKDE-NRW

Total

Electrified route Km.

166

205

33

280

159

73

78

84

1078

Electrified Track Km.

696

560

212

689

340

85

200

100

2882

OHE depot (nos.)

4

3

1

2#

2@

 -

1 $

-

13

PSI depot (nos.)

2

2

1

1#

1

 -

-

-

7

Traction sub-station (nos.)

2

4

1

5

2

 -

1

-

15

Switching stations (in nos.)

16

12

4

17

10

5

6

6

76

Remote Control Center (in nos.)

1

-

-

-

-

 -

-

-

1

Workshop (in nos.)

1

-

-

-

-

 -

-

-

1


# Two OHE depots (ROK & Mansa) and one PSI depot are not operational due to paucity of staff.

@ One OHE depot (MDNR) is not operational due to paucity of staff.

$ One OHE depot (GHH) is not operational due to paucity of staff.





Source : Northern Railways / Indian Railways Portal CMS Team Last Reviewed on: 30-07-2019  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.