MAJOR ACHIEVEMENTS
Works done to improve Asset Reliability and mobility
·3 PSRs have been removed ( BE, Br. 52 & isolation at HPU).
·Increasing of CSL by 12.5 mtr at BRYC line no 1 by shiftingglued joint .
·Separate isolator for good shedsline no1, 2,3 at RACprovided
·01 nos IBH (KMBH) between Kakori-Malihabad commissioned.
·Electronic Interlocking at Mundhapande, Milak,Duganpur, Aithal, Ikkar & Pathricompleted.
·02 nos IBS have been commissioned at Mundhapande-Rampur Nad Milak – Nagaria Sadat.
·Additional loop lines have been provided at KUF and TSA
·140.85 CTR , 38 No turnoutrenewal, 10 no trap renewal and 55 no of superstructure renewal of turnouthave been done.
·A new FB plant has been started in RAC. 1000 Nos FB weld has been tested till date.
·Doubling of Laksar-Ikkar Section
·Route Electrification of LRJ(EXCL)- IKK(INCL) commissioned on 10.05.19.
·Route Electrification of CH(INCL)-AO(INCL) commissioned on 21.10.19.
·Route Electrification of RJK(INCL)-CH(EXCL) commissioned on 10.05.19.
·Route Electrification of MB-RJK commissioned on 30.03.19
·Route Electrification of NBD-KTW commissioned on 29.03.19.
·Route Electrification of GJL-MZM commissioned on 15.02.19.
·During the year 25000 over due AT weld has been tested by USFD teams.
All 4mtr and OBS defects on Bridges have been removed have been removed from all routes on the Division.
Safetyworks :
·33 Nos Level Crossings closed on following account:-
·27 Nos LHS provided on Manned LC .
·1 No LC have been closed on diversion.
·1 No LC have been closed on Low TVU.
·4 Nos ROB completed .
·Rebuilding of Br. 18 in LRJ-DDN section.
·Work of Replacement of Girderat Br. No. 1145in MB Yard Completed.
·Jacketing of Br. No. 948 UP in MB-LKO Completed.
·Replacement of Bed Block of Br no. 44 in MB-GZB section completed
Passenger Amenities
Sustained efforts have been made over the previous years for effecting a marked improvement in passenger amenities works:
·Escalator at MB and BE provided (under testing)
·VIP lounge at MB station constructed
·Coach Guidance System provided at HPU station.
·Wi Fi has been provided at 111 stations of MB division out of 150
·Electronic Charting System has been provided at MB station
·08 no. Escalators (DDN 02, HW 06) and 06 no. Lifts (DDN 02, HW 02 and MB 02) have been installed over MB Division.
·Divyang-jan toilet provided on all PFs of A1, A & B category stations i.e. Bareilly, Dehradun & Haridwar.
·Minimum essential amenities at all stations of the division provided.
·Boring of new tubewell at KXK completed.
·Work of construction of 2nd class waiting hall at Bareilly & Rampur Completed.
·Divyang-jan toilet provided on all PFs of A1 category stations i.e. Bareilly, Dehradun & Haridwar,
·Chandausi,Hapur,Hardoi,Moradabad,Roorkee,Rampur& Shahjanpur.
·Washable apron provided at Barielly.
·Baggage Scanner provided at BE, HW and MB.
·3 Nos Uncommisioned tubewell commissioned.(Two at Moradabad & one at Najibabad.
Other Special works
·Purchase of Rs. 2 Crore on Gem completed.
·All ex-gratia cases disposed off. Pending cases `NIL’.
·Electrification of 02 no. way side stations (MKHI and AJI), RGBH and Gang Hut 07 & 08 near QSR has been done through Solar.
·Back up supply provision for Air-Conditioners in all Running Rooms (DDN, HW, LRJ, NBD, MB, CH, HPU, BE, RAC/LP, RAC/G & BLM) over MB Division has been completed.
·National monumental flags provided at 8 Railway stations (HW, DDN, BE, HRI, SPN, MB, RMU, HPU, BJO)
·Store module in TMS implemented.
·ISO 9001-2015 certification for all integrated crew & guard lobbies of MB division
·OMS recording on ‘E’ route started by division.
·156734 trees planted on ‘HARIT DIVAS’.