Highlights of 2021-22
General
ØMoradabad Division successfully manged the rush of Shahi Snan of Mahakumbh 20-21 on Somvati Amavsya & Baisakhi on 12th& 14th Aprilat Haridwar. All the arrangements were made for the convenience of passengers and staff at all Kumbh locations.
ØThe Division successfully received and unload 19 Oxygen Express with 1286.04 ton Oxygen in May’21. 14 Oxygen express were received at Bareilly, 04 at Harrawala & 01 at Moradabad.
ØOne PSA Oxygen Generator Plant (250 litres) has been installed and commissioned at the divisional Hospital in Moradabad. It is the very first installed oxygen generation plant in the Northern Railway.
ØCentralized Oxygen pipeline: Total 31 beds are equipped with central oxygen pipeline out of total 119 beds.
ØWith the motive to provide safety and security to women passengers travelling in trains throughout their journey, ‘Meri Saheli’ campaign is launched by Moradabad Division. Under this campaign, a team of women Sub Inspectors (also appointed as Nodal officers) and women constables of RPF enters in all coaches including ladies coaches and identify women passengers, who are travelling alone before the departure of the train. These passengers are briefed about all precautions to be taken during the journey and inform about help no. 182 apart from giving contact numbers of RPF to contact in case of any issue.
ØMoradabad Division became the first over Northern Railway to finalise the agreement for Goods shed development through public private partnership model. The agreement for Garhmukteshwar Goods shed executed with Shree Aadinath Trading Co. Meerut for 05 years.
NIT for Bareilly cantt Goods shed for development under PPP model policy was also published on 11.11.2021. Date of opening of tender: 22.12.2021.
ØReaching to another milestone, Moradabad Division has awarded the contract for packing of luggage / parcel packages at parcel sheds of Dehradun, Haridwar, Moradabad and Bareilly railway stations under NINFRIS. Through this contract, Division has bridged the gap between Railway and it's customer, providing them the services and convenience for packing of two wheelers, parcel / luggage packages. It will also eliminate the possibility of any un-authorised services if any at railway stations. The project will also yield revenue of Rs.3.25 lakhs for contract period of one year.
ØCommissioning of UTS cum PRS at Nemisharanya & Kanth on 09th Aug’2021.
ØFor the facilitation of passengers 05 stations(YNRK, RKSH, GMS, HRI, SPN) are having UTS cum PRS counter other than PRS.
ØThe meeting was successfully organised at Moradabad with Hon’ble MPs on 16.11.21 with the objective to receive and discuss suggestions on expansion of railway facilities in MP’s parliamentary constituencies.
ØThe Division has also awarded the Standee with LED screen & Mobile charging facility at HW & YNRK with annual revenue of Rs.1,40,000/-
ØThe division has issued LOA for setting up of EV charging station along with 2/3 wheeler rental service. The project will yield revenue of ₹ 6.00 lac per annum. The facility will be provided at HW, RK, MB & BE.
ØTotal 2143 staff granted promotion and total 707staff granted MACP in the last year. 1028 staff promoted and 109staff granted MACP between April to Feb. 2022 .
ØHRMS Helpdesk – A dedicated whatsaap group has been started for speedy disposal of HRMS related grievances.
ØKaramchari S.R display camps were held at:- DDN, BE, AO, RAC,SPN,HPU HW & MB
ØEktaDiwas Pledge taken on 31.10.201.
ØA work shop held on 02.11.21 at DRM office MB for Vigilance awareness week.
ØA booklet on “HRMS” released by “P” branch.
Safety Performance:
ØNumbers of accidents reduced to 02 in present year as compared to 09 in same period last year. Accident per million train km also reduced to .13 as compared to .33 last year. No consequential train accident has taken place so far in the division.
ØTrack Works (Figures in bracket is of last year)
oCTR- 153.88 Km (262.30 Km)
oTRR- 231.41 Km (379.78 Km)
oTFR- 53.68 Km (66.68 Km)
oTTR- 97 (102)
ØProvision of fire alarm system- 28 Stations(Signalling rooms)
Ø38 Nos Electric lifting barrier provided during the year.
ØElimination of LC Gates by LHS/Merger- 11Nos
ØSafety audit of12 major yards has been carried out by multi disciplinary dept.
ØInternational Level Crossing awareness week -A special drive was launched w.e.f. 04th to 10th June’21. 187 level crossing were covered and 5600 road user were counselled and 7450 pamphlets and 11500 handbills were distributed. In addition to above, 05 safety seminars were also organized in which 210 staff were counselled.
Infrastructure/Traffic Facility Works to Improve Mobility:
ØOpening of new Crossing station Lakhan (LKN) between PKW-DS on 22.04.2021
ØOpening of double line between NERI-JKH & JKH-JBG (24 Kms) stations on RAC-SPC section
ØOpening of double line between RAC-BRTA 6.5 KMs. doubling (without RAC Yard remodeling) on RAC-SPC section on 07.01.2022.
ØYard remodeling and doubling between LRJ-HW
ØRailway Electrification
a)Provision of OHE in JPLS [2 lines (150 Mtrs +150 Mtrs)] siding
between Pilkhuwa-Dasna
b)Provision of OHE in ATLP [1 line(130 Mtrs)] siding between
Pilkhuwa-Dasna
c)One hook placement by electric engine in CONCOR/MB
d)Electrification of POL Siding at Aonla, Najibabad& Banthara.
ØImprovement of Goods Shed for loading / unloading at Madhoganj.
ØNew Interchange point and Junction Station with NER at Shahjahanpur
ØElectronic Interlocking (EI) commissioned at Sandila, Umartali, Shajhanpur, Maingalganj, Neri, Jahanikhera, Rampur, Laksar& Sahzad Nagar.
ØProvision of IBS between Dalpatpur-Katghar and Bilpur-Tisua
ØLoop line commissioned at Fajalpur. Umartali& Chandok
ØLC Gate Sliding boom provided at 8 level crossings.
ØRemoval of 15 KMPH PSR at all stations ON-BLM-SPC section and impose 50 KMPH PSR on 23.04.2021.
ØRemoval of PSR of 50 KMPH between PKW-DS