Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter Find us on Youtube View Content in Hindi
National Emblem of India

About Us

NR H.Q.

Divisions

Passenger & Freight services

News & Recruitment Info

Tenders

Contact Us



 
Bookmark Mail this page Print this page
QUICK LINKS
Electrical (G)





ASSETS

A.POWER SUPPLY INSTALLATIONS

1.   Power Supply Depots                                                                      :12 Nos.

      (DDN, HW, LRJ, NBD, HPU, TS-E/MB, TS-W/MB, CH, BE, RAC, HRI, RK)

2.   Electric Sub-Stations:

      a)   33KV/11KV                                                                                :03 (MB-02, BE-01)

      b)   11KV/440V                                                                                 :34

3.   L.T. connections:

       a) 3 phase                                                                                        :191

       b) Single phase                                                                                :329

4. Total Number of Block stations & flag stations.                                   :154

5. No. of electrified stations                                                                     :152

6.Total Number of Manned Level Crossing                                             :708

7.Total Number of Manned Level Crossing (Night Closed )                    :50

8.Total Number of Electrified Manned Level Crossing                            :658

8.   Water Supply Installation

      Number of Submersible pumps installed                                          :108

9.  Number of Stationary DG sets                                                           :64

10. Mobile Power Plants (Trolley mounted)                                             :01 (30 KVA atMB)

11. Number of ARTs & ARMEs                                                                 :03 (Rosa,HW       

                                                                                                                 (SPARMV)& MB)

12. Number of Water Coolers                                                                   :165

13. Number of Air Conditioners                                                                 :517

14. Total number of Rly. Quarters                                                              :11038

15. Total number of rewired Quarters                                                         :9006



B.TRAIN LIGHTING & AC COACHING

1.Total no. of Train lighting Depot                       :           06(BLM,BE,MB,NBD,HW,DDN)

2.Total no. of AC Depot                                       :           02 (BE,DDN)

PRIMARY MAINTENANC

1.Total no. of rakes                              :           45 nos.

2.Total no. of coaches                          :           511 nos.

 a) TL                                                     :           418 nos.

b)SG- AC                                               :           33 nos.

c) LHB EOG AC                                     :           32 nos.

d) LHB NAC                                           :           20 Nos

d) Power cars                                         :           08 nos.

SECONDARY MAINTENANCE

1.Total no. of rakes per day                     :           37 nos.

2.Total no. of coaches                              :           377 nos.

a) TL                                                         :           308 nos.

b) AC                                                         :           69 nos.

3.SAFE TO RUN (STR)

a) TL                                                           :           172 nos.

b) AC                                                          :           108 nos.

Sanction strength/On roll/Vacancy of staff

S.N.

Depot

MCM

PF-I

PF-II

PF-III

Kh/HKh

App.

Total On Roll

POWER

S.S.

O.R.

S.S.

O.R.

S.S.

O.R.

S.S.

O.R.

S.S.

O.R.

S.S.

O.R.

S.S

O.R.

Vac.

1

Total

36

31

106

55

49

34

49

67

149

0

0

22

389

299

90

 

S.N.

Depot

MCM

TLF-I

TLF-II

 TLF-  III

Kh/HKh

App.

Total On Roll

Coaching

S.S.

O.R.

S.S.

O.R.

S.S.

O.R.

S.S.

O.R.

S.S.

O.R.

S.S.

O.R.

S.S

O.R.

Vac.

1

Total

22

18

61

40

27

16

28

31

90

66

0

2

228

173

55




RECENT ACHIEVEMENTS

Sr.No.

DESCRIPTION

         1

For beautification of circulating area /Stn building facade lights are provided at Haridwar Station.

         2

Installation of Total capacity of 1143 KWp solar plant in various location of Moradabad division is in under progress by Azure Power rooftop (eight) pvt. Ltd. Till date total capacity of 701.42 KWp plant is commissioned at RWL, BE,JWP,RKSH, RK, SPN MB, HW and HRI station.

         3

For beautification of circulating area /Stn building facade lights are provided at Moradabad Station.

  4.     

OH Line wire & service lines of the 27 Nos. of the Blocks (No. Qtr allotted) removed in Loco & HRH colony to prevent theft of electricity.

  5.

Nanda Devi Exp. 02402/01 on reporting date 12.09.20 after national lockdown was first time run on HOG instead of EOG along with approximate saving of  Rs.400000.00  around trip, this will also reduce noise and air pollution due to DG sets.