S.N. | Work | Proposed Target for 2021-22 | Achievement (till Feb-22) | Action Plan |
1 | Energy consumption (MUs) | 40.7 | 34.03 | •Use of LEDs only forIllumination •Use of BEE rated equipments like Acs, Geysers. •Regular behavior change and awareness campaign •Replacement of Overhead lines with Cables to reduce AT&C losses. |
2 | Fuel efficiency i.e. saving of HSD oil (in Ltrs) by improvement of power supply reliability | 1,24,300 | 1,04,384 | •Regular chasing with UPPCL, UPCL in case of supply failure •Improving backbone electrical infrastructure to reduce internal failures |
3 | Provision of Lifts (Nos). SPN-2 nos in coordination with Constt. | 2 | NIL | Not feasible with existing FOB, Work proposed by engineering for FOB modification |
4 | Provision of Escalators (Nos)BE-2 & SPN-2 nos in coordination with constt. | 4 | 2 | 2 nos Escalators have installed at Bareilly station Escalators at SPN not feasible with existing FOB, Work proposed by engineering for FOB modification |
5 | 5 MWp Grid connected solar plant by REMCL(MWp) over Moradabad division. | 1.14 | 1.007 | 1.007 Kwp has been completed, remaining is under progress |
7 | Running of Nanda Devi 02401/02& Ujjain/Indore Express(04309/10/17/18) with HOG | 6 | 6 | All rakes of these trains running with HOG |