SPECIAL WORKS DONE BY TRD DEPARTMENT
S.No. | Special Work |
1. | CRS Inspection of Doubling of JBG-NERI and RAC-BRTA Section (TKM:29 and 7.833 respectively) was sucessufully done on 04.09.2021 and 07.01.2022 and CRS authorized this section on 09.09.2021 and 17.01.2022 respectively |
2. | Work of provision of Buried rail in all SP/SSP of Moradabad Division was completed |
3. | Electrification work of New Crossing Station of Approx. 3 TKM completed in May-2021. |
4. | Electrification of 2 No. siding (i.e. ATLP Siding and JPL Siding of approx TKM 0.35 and 0.107 respectively) by Division itself. |
5. | Electrification of COD Line at RMU/Yd of Approx. 0.4 TKM completed. |
6. | Electrification of POL siding at NBD and BTRA was successufully done in Dec-2021 |
7. | Replacement of static panel with Numerical Panel in UTA/TSS and FZL/TSS |
8. | Re-commisioning of 2nd bay of JWP/TSS by replacing defective Transformer |
9. | Tree Trimming of Approx5087 No. of Trees were done in this Financial Year. |
10. | Re-furishment of RCC Control Building was done. |
11. | Construction of New OHE Model at Bareilly for Training of staff to made them SAKSHAM and one day is assigned in a month for imparting Training to staff.   |
12. | Formation of One special team for Tower Wagon Maintenance (having 1 JE, 1 Tower Wagon Driver, 1 Technician and 2 helpers) whose main work is to look after the maintenance of all Tower wagon in Division and also attend defects during Breakdown. |
CHANGES IN MAINTENANCE PRACTICES
S.No. | Change in Practice |
1. | Foot-patrolling and footplate schedule made for supervisor and monthly monitoring of their inspections done by concerned Officer. |
2. | Increase in Tower Wagon working instead of Truck movement |
3. | Daily advance block planning sent to operating department for maximum utilization of block |
4. | Thermo-vision checking drive launched for conditional monitoring of all joints and connectors in the section |
5. | Live Line checking of overall section has been done 2 times to arrest the failure prone areas. |
6. | Condition monitoring of Transformers is being done to check the healthiness of transformer of Moradabad Division. |
7. | Case of replacement of static panel with numerical panel is under progress to improve the reliability of system. |
8. | Combine working of two to three tower wagons is carried out in sections where blocks are available. This maximizes the output nd helps in liquidating the maintenance of a particular section early. |
9. | Maximum utilization of shadow block in NI work, Girder Launching etc. |
OUTSOURCING STATUS
S.N | Name of Work | Cost of Work | Current Status |
1 | Manning and Housekeeping of TRD Depots over Moradabad Division | Rs 3.61 Crore | Awarded on 10.02.2022 |
2 | Manning and Housekeeping of Traction Sub-Stations Over Moradabad Division | Rs 2.88 Crore | Tender under preperation |
3 | Outsourcing of PSI Maintenance Activities over Moradabad Division | Rs 4.16 Crore | Tender Published on 19.02.2022 and will be opened on 14.03.2022 |