ORGANISATION
The Engineering set up at Moradabad is headed by Senior Divisional Engineer (Co-ordination), who is assisted by four Sr. Divisional Engineers, One Divisional Engineer in-charge of sectionand one Divisional Engineer (T). There are 10 sub-divisions namely Haridwar, Najibabad, Roorkee, Hardoi - I, Hardoi - II, Shahjahanpur, Bareilly, Chandausi, Moradabad & Hapur. These sub-divisions are headed by ADENs.
ASSETS
1. Division wise Route Km |
Division | Electrified | Non Electrified | Total |
MB | 1300.432 | 109.825 | 1410.257 |
2. Running Track Km |
Group | Electrified | Non Electrified | Total |
B | 1007.64 | 0 | 1007.64 |
D SPL | 272.92 | 0 | 272.92 |
D | 148.615 | 0 | 148.615 |
E | 553.367 | 109.825 | 663.192 |
Total | 1982.542 | 109.825 | 2092.367 |
3. Division wise Track Km |
Division | Running Km | Loops & Siding | Track Km |
MB | 2092.367 | 413.18 | 2505.547 |
BRIDGES
The division has a total of 2848 bridges (including ROBs/RUBs/LHSs), of which 224 are major bridges and 20 are important bridges. A total of 17.2 Kms. of track is laid on major and important bridges in Moradabad division.
S.No. | TYPE | Nos. |
1. | IMPORTANT BRIDGES | 17 |
2. | MAJOR BRIDGES | 242 |
3. | MINOR BRIDGES | 2473 |
4. | ROAD OVER BRIDGES | 49 |
5. | ROAD UNDER BRIDGES | 104 |
| TOTAL | 2885 |
Bridge No. 52 Ganga River
LEVEL CROSSINGS (As on 02.03.2022)
Total - 648
CURVES
S.No. | CATEGORY | Nos. | MAX. DEGREE OF CURVE |
1. | No. of curves on Main Line | |
| i)DN Main Line ii)UP Main Line | 228 345 | 3.0 3.0 |
2. | No. of curves on branch Line | 205 | 5.5 |