Key targets/Objectives

Details of section where OFC is not available


S.NO

SECTION

NO OF STATION

K.M

Remark

1

MB-CH

7

45.85

RE/Ambala Work is under progress. Target Mar - 2022

2

CH-HGJ

8

84.41

3

SPC-BLM

6

64.03

Dy. CSTE/RE/LKO Work is under progress. Target Mar – 2022

4

BLM-ON

7

102.2

5

NBD-KTW

3

24.01

Work proposed in GM power in 2021-22

6

GJL-MZM

5

94

RE/Ambala Work is under progress. Target Mar – 2022


Mitigation action plan in the year 2021-22:

Gears

% Contribution

Remark

BI

40.28%

1) Replacement of BPAC and dual detection is in progress. BPAC/Dual detection has been done in 14 block sections in current year against target of 15 block sections. Total scope is 53 block sections. Works has been sanctioned for replacement of BPAC in remaining 26 block sections
2) For replacement of TX/RX coils supply form CEL is being taken instead of Byculla workshop make which is not suiting to CEL EJB.

3) Every fortnightly track devices parameters are being checked and ensured

4) Replacement/repair of defective quad cable is under progress. Total 46 block sections identified. Quad cable required for improving section. PO for cable to be issued.

UFSBI

2.52%

BPAC

20.34%

HASSDAC

0.77%

NTI

0.95%

SGE

2.75%

SSDAC

11.52%

TLI

1.44%

LC

6.17%

1) Provision of Sliding barrier is completed for 31 LC gates in current year, total scope is around 140 and target for current year is 100.

2) Mechanical locking has been ensured on bi-weekly basis
3) Wire run is being replaced on 6 monthly basis

4) Provisioning of ELB is planned at 25 LC gates, out of which 36 have been commissioned during 2021-22

5) Spare for ELB are being arranged.

ELEC

1.85%

MECH

4.32%

PT

8.28%

1) In Division total 250 point machines were overdue as on 01.04.2021 for replacement. So far 241 machines have been replaced.

2) Point & crossing deficiencies being attended and discussed in safety meeting.

3) Stud bolt head break cases sent to Engg to study reason.

ELEC

5.49%

MECH

2.79%

SIG

29.57%

1) Fault alarms of ELD channels are being rectified, total 212 alarms have been identified as on 01/02/2021. 51 alarms have been rectified in 2021-22.

2) Defective signaling cable replacement is under progress 16.261 KM has been replaced in current year
3) Overaged LED replacement has been done for 774 aspects against target of 2028; for balance material has to come from AMV depot.

MACLS

29.07%

SEMAPHORE

0.50%

TC

15.71%

1) Defective glued joints are being identified with jointly inspection with P-Way and replacement is planned accordingly; total 479 defective glued joints have been replaced during current year

2) Iron chip cases are also high which will be reduced by glued joint changing and regular cleaning of glued joints.

Axle Counters

2.52%

DC

11.97%

MSDAC

0.36%

SSDAC

0.86%


 




Source : Northern Railways / Indian Railways Portal CMS Team Last Reviewed : 13-04-2022  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.