| Signal & Telecom Department |
|
![]() https://nr.indianrailways.gov.in/uploads/files/1750851396452-FINAL LKW-MKS-MRW INTEGRATED CRP.pdf https://nr.indianrailways.gov.in/uploads/files/1757920833821-MKS INTEGRATED CRP.pdf Telecom Highlights for FZR div for Novemeber-25 Video conference conducted in c/w inaugural run of Firozpur Cantt- Delhi Vande Bharat Express Train at Firozpur Cantt station on dt- 08.11.2025.
1) 01 no new 5-line Train display boards (ICS make) (Version- RDSO/SPN/TC/108/2019 Ver. 1.0) commissioned at Muktsar station .10 nos 2)PA system installed and commissioned at 24 stations over division (Total- 30 stations commissioned). 3)Coach guidance system commissioned at PF-1 (=19 nos) at Muktsar station of ICS make (Version- RDSO/SPN/TC/108/2019 Ver. 1.0) 4)6 quad cable (=200 mtrs ) replaced b/w Phillaur-Bilga section and insulation improvement from 5 Mohm to 25 Mohm. 5)6 quad cable insulation improvement done in a)01 Block hut – Dhandarikalan section from 5 Mohm to 40 Mohm by replacing Overaged 4 nos straight joints. b)Baddowal-Mullanpursection from 10 Mohm to 120 ohm by replacing Overaged 3 nos straight joints and replacing 50 mtrs cable. c)Jagraon-Ajitwalsection from 2 Mohm to 20 Mohm by replacing Overaged 3 nos s straight joints. d)In Jandiala- Mannawala section from 10 Mohm to 35 Mohm by replacing Overaged 3 nos straight joints and 1 no. Derivation joint. e)In Khasa- Attari section from 5 Mohm to 30 Mohm by replacing 100 Mtrs cable and 3 nos old derivation joints. 6) CMS connectivity provided in GVKK Thermal Power plant, Khadur sahib on BSNL Media. 7) UTN connectivity provided at Amritsar station for ATVM machines (=06 nos). 8) Railnet connectivity provided for IPIS integration with NTES at Phagwara, Phillaur, Dhandarikalan, Faridkot, Firozpur Cantt, Kapurthala station.
|

Accessibility Controls