   Moradabad Division
      Engineering
         Key targets/Objectives


 
Bookmark Mail this page Print this page
QUICK LINKS
Key targets/Objectives

 

Highlights of the month

ØDuring this month 880.432 km. Rail and 3747.99 Nos. welds were ultrasonically tested. 1213 Welds done, 91 Glued Joints changed, 6.768 Tkm TRR & 12.104 Km. TSR, 38 LC overhauled, 80.08 Km. Track and 104 Nos. Tunrout tamped by different track machines..

ØLand earnings upto ₹ 0.86 Crores.

 


 

1.Mobility Index

 

Overall Mobility Index of the division at the end of Apr’25 is 104

 

 

Highest ever achievement (indicating previous best in the last 5 years) -

SN

Item of Work

Unit

Performance

Month and year of previous best

Achieved

Previous best

1

CTR

CTR Units

36.196

(June’20)

12.023

May’20

2

TTR

Eq. Nos.

27.25

(Apr’24)

22.75

Feb-24

 

Achievements

2.1     Track Renewal

ØØThe progress of track renewal is 9.436 CTR Units during the month against the annual target of 151 CTR units.

2.2     Deep Screening

     12.761 Kms track has been deep screened during the month against the annual      
      target of 365 Kms.           


2.3     Track Machine

(i)       57.87 Km of progress has been achieved by 3X Mc during the month.

(ii)      17.668  Km of progress has been achieved by BCM during the month.  

      

 2.4     Earnings  from Land Resources 

 *     ₹ 0.86 crore has been earned upto the month from land resources.

 

 2.5     Elimination of manned  Level Crossings

 

The detail is as under:-

Item

Annual Target

During the month

Cumulative

Elimination of manned level crossings by diversion through other manned level crossings/ROB, LHS etc.

27

0

0

27

0

0

 

3.0System improvement

 

No System improvement done during the month

  

 

 

 

 

4.0Economy Measures indicating one time and recurring economy likely to be achieved

 

 

 

5.0Safety Measures (Important ones)

 

5.1Provision of Concrete/improved Speed breakers

 

 

At 12 nos. Level Crossings, Concrete/improved Speed Breakers have been provided during the month making a cumulative to 12 Nos against the target of 75 nos.

 

5.2Provision of Retro reflective improved Sign boards

 

At 12 Level crossings, improved Retro Reflective Sign boards have been provided during the month making a cumulative to 84 Nos against the target of 75 nos.

 

5.3Replacement of corroded Whistle boards/ Retro reflective boards

 

At 12 level crossings, corroded Whistle boards / Retro reflective boards have been replaced during the month against the target of 75 nos.

 

5.4 Improvement of Basic infrastructure at manned Level crossings

 

Basic infrastructure at 12 manned Level Crossings has been improved during the month during the month  against the target of 75 nos.

 

6.0 SRSF works

 

No SRSF work is in balance.

 

 

7.0Control on Rail/Weld failures

 

7.1Rail/Weld Failures

 

Failure Type

During the year

During Previous Year

For the month

Cumulative

For the month

Cumulative

Rail Fractures

0

0

1

1

Weld failures

1

1

0

0

Total

1

1

1

1


8Engineering Speed Restrictions

 

8.1Detail of PSRs relaxed / removed during 2024-25 :- Nil

 

9.0Status of pilot project / material under trial

9.1 Pilot Project

SN

Type of Project

Proposed Nos/Km under trial

Date of commencement

Details of Parameters being monitored

Dates of submission of periodic reports to RDSO

Date of submission of final report to RDSO

--------------------NIL---------------------

 


10. Progress of Improvement of Yards

 

No. of yards targeted

(2024-25)

Name of the yard rectified during the month

Name of the yard rectified during the Year

26Layouts

0

13

13 Yards

0

5 (CAJ,KNT,DPR,NGG & DSNI)



 

11Final Bills

 

Opening balance

Addition during Month

Cleared during

the month

Cleared since

01.04.24

Closing Balance

Position of final bill pending since more than one year (Nos.)

Position of final bill pending since more than six months (nos.)

85

9

37

358

57

-

-

 

 


  1. Accidents on Engineering account (Board cases only)

 

Total Accident

Accident on Engineering Account

2023-24

2024-25

2023-24

2024-25

During the month

Cumulative

During the month

Cumulative

During the month

Cumulative

During the month

Cumulative

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

 





Source : Northern Railways / Indian Railways Portal CMS Team Last Reviewed : 27-08-2025  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.