ACHIEVEMENTS/INNOVATIONS :-
2.0CC / PREMIUM JUMBO RAKE FORMATION/REVALIDATION–
In the month of July-25, the division has revalidated 37 Premium jumbo rakes at BTI having a validity of 12+5 days and 54 Special Premium rakes(UMB=39, KJGY=15)have also been revalidated and including 3 fresh rakes formed at UMB with validity 20+5 days at UMB & KJGY.
During the month of July.-25, the division has revalidated 61 Yamuna rakes having validity up to 30+5 days or 9000 Kms, whichever is earlier in KJGY.
2.2 PLANS APPROVED:
During the period from 01/07/2025 to 31/07/2025, total 15 Plans have been signed which includes De-launching Scheme of rising existing ROB=3, launching Scheme of proposed FOB=2, launching Scheme of proposed ROB=1, Dismantling scheme of FOB=2, GAD of proposed FOB=1, GAD for up gradation of goods sheds=2, GAD of proposed ROB=1, plan for provision of Ballast less Track (BLT) =1,GAD for Strengthening of existing girder bridge=2.
2.3LONG HAUL LOADS:
Total 117 long haul loads are formed during July.-25 as compared to 98
during the same month of last year thus showing an improvement of
19.39%.
2.4REVISION/ AMENDMENT SLIPS OF SWRs:-
SWR revision of One stations i.e Hindon Cabin and Amendment Slips in the SWR of nine stations i.e. Alal, Guru Nanak Dev Thermal plant, Sangrur, Sunam, Daulatpur Chowk, Bhuchchu, Sekha, Noganwan, Samrala were prepared during the July’25. SIPs of eleven stations i.e Bassi Pathanan, Sangrur, Bahadur Singh Wala, Uklana, Kurali, Dhansu, Anandpur Sahib, Nangal Dam, Ahmadgarh, Malerkotla, Rup Nagar in connection with provision of double distant signals were also signed during the months.
2.5 Average Speed of goods train including stabling and yarding is 24.16 Kmph during July-25 as compared to 19.56 Kmph during the same month of the last year thus showing an improvement of 23.52%.
2.6Thirty Two blocks more than 04’00” including on SRE-UMB, UMB-
SRE, UMB-LDH, LDH-UMB, SIR-DLPC, RPJ-SGNR, LDH-HSR, UMB-KLK& KLK-
SML sections are given for maintenance work during July 25.
2.7Two foot Over Bridges ( FOBS), each 12 meters wide, were constructed at
KLK yard and YJUD yard under the Amrit Bharat Station Scheme during July
2025.