Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter Find us on Youtube View Content in Hindi
National Emblem of India

About Us

NR H.Q.

Divisions

Passenger & Freight services

News & Recruitment Info

Tenders

Contact Us



 
Bookmark Mail this page Print this page
QUICK LINKS
Signal & Telecom

UMB Div.

Group ‘C’

Group ‘D’

S/Strength

597

432

On Roll

509

288

Vacancy

88

144









1.0

ACHIEVEMENTS:-

1.1

06 No’s. Mechanical L-Xing Gate (MLB) replace with Electrical Lifting Barrier (ELB) LC gateNo- LC No-A48, B49 (ABS), LC NO-15C (KMNN), LC NO-39C (MNPR) , LC No-20 C & 21 C LLKN , station of AmbalaDivision with this 04 No’s MLB replaced with ELB in this year over Ambala Division .

1.2

Distributed Electronic Interlocking (Kyosen Make) Std III with Dual VDU at Khanalampura West Terminal (KWT) station,& 1 No’s RH,(Route 157 No’s.)has been commissioned on date 21.06.2025 by replacing mechanical interlocking with provision of 52(07-TWS, 45 IRS) No’s. New Points Machines, 26 No’s New Signals, 74 Nos. 5 No’s Dual MSDAC (CEL) Track Circuit, HNC Side BPAC with UFSBI (Deltron make) & HASSDAC (CEL make) and SRE Side continuous track circuiting.

1.3

To improve reliability of track circuits 53 No’s 80AH secondary cells have been replaced (SRE-06, CHA-9, BNN-2, MOT-6, PUL-4, UMB-24, DBN-4, MNPR-1,) with this total 241 No’s. Secondary cells have been replaced so far over Ambala division.

1.4

To improve the safety, speed and reliability of point machines 19 No’s Sealing of Point Machines in Water logging areas have been done over Ambala Division.

1.5

To improve the safety, speed and reliability of point, 08 No’s. Ordinary points have been replaced with Thick Web Switch (KWT-7 (PT NO-390A, 390B, 389A, 332A, 332B, 331A, 334A), NLDM-1(PT NO-63B), with this total 14 No’s. Thick Web 220 mm point machines and modified ground connection have been provided so far this year over Ambala Division.

1.6

To improve system performance, 90 mtrs. Defective signaling cable replaced (UMB-90) withthese 1398 Kms. defective cables replaced so far this year.

1.7

To improve reliability and safety of ELB 13 Nos. booms replaced (KNN-1, CHA-1, SIR-2, BTIC-3, LHM-2, SDY-SBJ-4,) with this 43 No’s. Boom has been replaced so far this year over Ambala Division.

1.8

02 No’s L-Xing gates has been closed permanently LC-146 Between SIR-GVG &,LC-B-77 at SFM Yard with this total 02 No’s. L-Xing gates have been permanentlyclosed so far over Ambala division.





Source : Northern Railways / Indian Railways Portal CMS Team Last Reviewed : 27-08-2025  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.